-
1
-
-
0031139805
-
Automated generation of modular fixture configuration design
-
Rong Y, Bai Y. Automated generation of modular fixture configuration design. ASME Trans J Manuf Sci Eng 1997; 119: 208-219.
-
(1997)
ASME Trans J Manuf Sci Eng
, vol.119
, pp. 208-219
-
-
Rong, Y.1
Bai, Y.2
-
2
-
-
0028407386
-
Computer-aided fixture design: A review
-
Hargrove SK, Kusiak A. Computer-aided fixture design: A review. Int J Prod Res 1994; 32(4): 733-753.
-
(1994)
Int J Prod Res
, vol.32
, Issue.4
, pp. 733-753
-
-
Hargrove, S.K.1
Kusiak, A.2
-
3
-
-
0028084630
-
A complete algorithm for synthesizing modular fixtures for polygonal parts
-
Brost RC, Goldberg KY. A complete algorithm for synthesizing modular fixtures for polygonal parts. Proceeding 1994 IEEE Robotics Automation 1994; 1: 535-542.
-
(1994)
Proceeding 1994 IEEE Robotics Automation
, vol.1
, pp. 535-542
-
-
Brost, R.C.1
Goldberg, K.Y.2
-
6
-
-
0032624321
-
Setup and fixture planning in automated process planning systems
-
Joneja A, Chang TC. Setup and fixture planning in automated process planning systems. IIE Trans 1999; 31(7): 653-665.
-
(1999)
IIE Trans
, vol.31
, Issue.7
, pp. 653-665
-
-
Joneja, A.1
Chang, T.C.2
-
7
-
-
0025472780
-
A literature survey of fixture design automation
-
Trappey AJ, Liu CR. A literature survey of fixture design automation. Int J Adv Manuf Technol 1990; 5: 240-255.
-
(1990)
Int J Adv Manuf Technol
, vol.5
, pp. 240-255
-
-
Trappey, A.J.1
Liu, C.R.2
-
8
-
-
0035840761
-
Flexible fixture design and automation: Review, issues and future directions
-
Bi ZM, Zhang WJ. Flexible fixture design and automation: Review, issues and future directions. Int J Prod Res 2001; 39(13): 2867-2894.
-
(2001)
Int J Prod Res
, vol.39
, Issue.13
, pp. 2867-2894
-
-
Bi, Z.M.1
Zhang, W.J.2
-
9
-
-
36248936532
-
A review of computer-aided fixture design with respect to information support requirements
-
Pehlivan S, Summers JD. A review of computer-aided fixture design with respect to information support requirements. Int J Prod Res 2008; 46(4): 929-947.
-
(2008)
Int J Prod Res
, vol.46
, Issue.4
, pp. 929-947
-
-
Pehlivan, S.1
Summers, J.D.2
-
10
-
-
0025568878
-
Workholding automation: Innovations in analysis, design, and planning
-
Hazen FB, Wright PK. Workholding automation: Innovations in analysis, design, and planning. Manuf Rev 1990; 3(4): 224-237.
-
(1990)
Manuf Rev
, vol.3
, Issue.4
, pp. 224-237
-
-
Hazen, F.B.1
Wright, P.K.2
-
11
-
-
0035207319
-
Computer-aided fixture design: A review and future trends
-
Cecil J. Computer-aided fixture design: A review and future trends. Int J Adv Manuf Technol 2001; 18(11): 790-793.
-
(2001)
Int J Adv Manuf Technol
, vol.18
, Issue.11
, pp. 790-793
-
-
Cecil, J.1
-
12
-
-
0001866314
-
Planning for modular and hybrid fixtures
-
Wallack AS, Canny JF. Planning for modular and hybrid fixtures. Algorithmica 1997; 19(1-2): 40-60.
-
(1997)
Algorithmica
, vol.19
, Issue.1-2
, pp. 40-60
-
-
Wallack, A.S.1
Canny, J.F.2
-
13
-
-
0030711474
-
Methodology for applying V-blocks and clamps to non-prismatic workpart fixtures
-
Hou JL, Amy JCT. Methodology for applying V-blocks and clamps to non-prismatic workpart fixtures. Int J Comput Appl Technol 1997; 10(3-4): 152-167.
-
(1997)
Int J Comput Appl Technol
, vol.10
, Issue.3-4
, pp. 152-167
-
-
Hou, J.L.1
Amy, J.C.T.2
-
14
-
-
0034472491
-
An optimum design for 3-D fixture synthesis in a point set domain
-
Wang MY. An optimum design for 3-D fixture synthesis in a point set domain. IEEE Trans Robot Automat 2000; 16(6): 839-846.
-
(2000)
IEEE Trans Robot Automat
, vol.16
, Issue.6
, pp. 839-846
-
-
Wang, M.Y.1
-
16
-
-
10244267470
-
A complete and efficient algorithm for searching 3-D form-closure grasps in the discrete domain
-
Liu YH, Lam ML, Ding D. A complete and efficient algorithm for searching 3-D form-closure grasps in the discrete domain. IEEE Trans Robot 2004; 20(5): 805-816.
-
(2004)
IEEE Trans Robot
, vol.20
, Issue.5
, pp. 805-816
-
-
Liu, Y.H.1
Lam, M.L.2
Ding, D.3
-
17
-
-
0000052555
-
A study of optimal criteria identification based on the small displacement screw model
-
Bourdet P, Clement A. A study of optimal criteria identification based on the small displacement screw model. Ann CIRP 1998; 37(1): 503-506.
-
(1998)
Ann CIRP
, vol.37
, Issue.1
, pp. 503-506
-
-
Bourdet, P.1
Clement, A.2
-
18
-
-
0032682110
-
Tolerance analysis of manufacturing fixture locators
-
Choudhuri S, DeMeter EC. Tolerance analysis of manufacturing fixture locators. ASME J Manuf Sci Eng 1999; 121(2): 273-281.
-
(1999)
ASME J Manuf Sci Eng
, vol.121
, Issue.2
, pp. 273-281
-
-
Choudhuri, S.1
Demeter, E.C.2
-
19
-
-
0000652371
-
Quadratic sensitivity analysis of fixturing and locating schemes for rigid parts
-
Carlson JS. Quadratic sensitivity analysis of fixturing and locating schemes for rigid parts. ASME J Manuf Sci Eng 2001; 123(3): 462-472.
-
(2001)
ASME J Manuf Sci Eng
, vol.123
, Issue.3
, pp. 462-472
-
-
Carlson, J.S.1
-
20
-
-
0036286150
-
Tolerance analysis for fixture layout design
-
Wang MY. Tolerance analysis for fixture layout design. Assembly Automat 2002; 22(2): 153-162.
-
(2002)
Assembly Automat
, vol.22
, Issue.2
, pp. 153-162
-
-
Wang, M.Y.1
-
21
-
-
0041821970
-
Computer-aided fixture design verification Part 2: Tolerance analysis
-
Kang Y, Rong Y, Yang JC. Computer-aided fixture design verification Part 2: Tolerance analysis. Int J Adv Manuf Tech 2003; 21(10-11): 836-841.
-
(2003)
Int J Adv Manuf Tech
, vol.21
, Issue.10-11
, pp. 836-841
-
-
Kang, Y.1
Rong, Y.2
Yang, J.C.3
-
22
-
-
33744533343
-
A mathematical approach to analysis and optimal design of a fixture locating scheme
-
Qin GH, Zhang WH, Wan M. A mathematical approach to analysis and optimal design of a fixture locating scheme. Int J Adv Manuf Tech 2006; 29(3-4): 349-359.
-
(2006)
Int J Adv Manuf Tech
, vol.29
, Issue.3-4
, pp. 349-359
-
-
Qin, G.H.1
Zhang, W.H.2
Wan, M.3
-
23
-
-
0035889176
-
Locating error analysis and tolerance assignment for computer-aided fixture design
-
Rong Y, Hu W, Kang Y, Zhang Y, Yen DW. Locating error analysis and tolerance assignment for computer-aided fixture design. Int J Prod Res 2001; 39(15): 3529-3545.
-
(2001)
Int J Prod Res
, vol.39
, Issue.15
, pp. 3529-3545
-
-
Rong, Y.1
Hu, W.2
Kang, Y.3
Zhang, Y.4
Yen, D.W.5
-
24
-
-
0032658533
-
Fixturing surface accessibility analysis for automated fixture design
-
Li J, Ma W, Rong Y. Fixturing surface accessibility analysis for automated fixture design. Int J Prod Res 1999; 37(13): 2997-3016.
-
(1999)
Int J Prod Res
, vol.37
, Issue.13
, pp. 2997-3016
-
-
Li, J.1
Ma, W.2
Rong, Y.3
-
25
-
-
0033701057
-
A fast interference checking algorithm for automated fixture design verification
-
Hu W, Rong Y. A fast interference checking algorithm for automated fixture design verification. Int J Prod Res 2000; 16: 571-581.
-
(2000)
Int J Prod Res
, vol.16
, pp. 571-581
-
-
Hu, W.1
Rong, Y.2
-
26
-
-
0342918690
-
An automated design and assembly of interference-free modular fixture setup
-
Kumar AS, Fuh JYH, Kow TS. An automated design and assembly of interference-free modular fixture setup. Comput- Aided Des 2000; 32: 583-596.
-
(2000)
Comput- Aided Des
, vol.32
, pp. 583-596
-
-
Kumar, A.S.1
Fuh, J.Y.H.2
Kow, T.S.3
-
27
-
-
15844363827
-
Precise global collision detection in multi-axis NC-machining
-
Ilushin O, Elber G, Halperin D, Wein R, Kim MS. Precise global collision detection in multi-axis NC-machining. Comput-Aided Des 2005; 37(9): 909-920.
-
(2005)
Comput-Aided Des
, vol.37
, Issue.9
, pp. 909-920
-
-
Ilushin, O.1
Elber, G.2
Halperin, D.3
Wein, R.4
Kim, M.S.5
-
28
-
-
85171501322
-
-
CGTech Ltd, [Accessed on December 24, 2007]
-
CGTech Ltd. http://www.cgtech.com/usa/index.php [Accessed on December 24, 2007].
-
-
-
-
29
-
-
0022074551
-
Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures
-
Asada H, By A. Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures. IEEE J Robot Automat 1985; 1: 86-94.
-
(1985)
IEEE J Robot Automat
, vol.1
, pp. 86-94
-
-
Asada, H.1
By, A.2
-
30
-
-
0041821963
-
Computer-aided fixture design verification: Part 1, The framework and modeling
-
Kang Y, Rong Y, Yang JC. Computer-aided fixture design verification: Part 1, The framework and modeling, Int J Adv Manuf Tech 2003; 21(10-11): 836-841.
-
(2003)
Int J Adv Manuf Tech
, vol.21
, Issue.10-11
, pp. 836-841
-
-
Kang, Y.1
Rong, Y.2
Yang, J.C.3
-
32
-
-
0024771578
-
Mathematical approach to automatic configuration of machining fixtures: Analysis and synthesis
-
Chou YC, Chandru V, Barash MM. Mathematical approach to automatic configuration of machining fixtures: Analysis and synthesis. J Eng Industry 1989; 111(4): 299-306.
-
(1989)
J Eng Industry
, vol.111
, Issue.4
, pp. 299-306
-
-
Chou, Y.C.1
Chandru, V.2
Barash, M.M.3
-
33
-
-
0026902046
-
Automatic workholding verification system
-
Trappey AJC, Liu CR. Automatic workholding verification system. Robot Comput-Integr Manuf 1992; 9(4-5): 321-326.
-
(1992)
Robot Comput-Integr Manuf
, vol.9
, Issue.4-5
, pp. 321-326
-
-
Trappey, A.J.C.1
Liu, C.R.2
-
34
-
-
0000517925
-
Verification and optimization of workholding schemes for fixture design
-
Fuh JYH, Nee AYC. Verification and optimization of workholding schemes for fixture design. J Des Manuf 1994; 4(4): 307-318.
-
(1994)
J Des Manuf
, vol.4
, Issue.4
, pp. 307-318
-
-
Fuh, J.Y.H.1
Nee, A.Y.C.2
-
35
-
-
0028424706
-
Restraint analysis of fixtures which rely on surface contact
-
DeMeter EC. Restraint analysis of fixtures which rely on surface contact. J Eng Industry 1994; 116: 207-215.
-
(1994)
J Eng Industry
, vol.116
, pp. 207-215
-
-
Demeter, E.C.1
-
36
-
-
0031147484
-
Fixture analysis under dynamic machining
-
Meyer RT, Liou FW. Fixture analysis under dynamic machining. Int J Prod Res 1997; 35(5): 1471-1489.
-
(1997)
Int J Prod Res
, vol.35
, Issue.5
, pp. 1471-1489
-
-
Meyer, R.T.1
Liou, F.W.2
-
37
-
-
0032669538
-
Automatic generation of dynamic clamping forces for machining fixtures
-
Tao ZJ, Kumar AS, Nee AYC. Automatic generation of dynamic clamping forces for machining fixtures. Int J Prod Res 1999; 37(12): 2755-2776.
-
(1999)
Int J Prod Res
, vol.37
, Issue.12
, pp. 2755-2776
-
-
Tao, Z.J.1
Kumar, A.S.2
Nee, A.Y.C.3
-
38
-
-
0033895763
-
Analysis of reactions and minimum clamping force for machining fixtures with large contact areas
-
Li B, Melkote SN, Liang SY. Analysis of reactions and minimum clamping force for machining fixtures with large contact areas. Int J Adv Manuf Tech 2000; 16: 79-84.
-
(2000)
Int J Adv Manuf Tech
, vol.16
, pp. 79-84
-
-
Li, B.1
Melkote, S.N.2
Liang, S.Y.3
-
39
-
-
84910776404
-
Finite element analysis of flexible fixture system
-
Lee JD, Haynes LS. Finite element analysis of flexible fixture system. ASME Trans J Eng Industry 1987; 109(2): 134-139.
-
(1987)
ASME Trans J Eng Industry
, vol.109
, Issue.2
, pp. 134-139
-
-
Lee, J.D.1
Haynes, L.S.2
-
41
-
-
0030216880
-
Deformable sheet metal fixturing: Principles, algorithms, and simulations
-
Cai W, Hu SJ, Yuan JX. Deformable sheet metal fixturing: Principles, algorithms, and simulations. ASME Trans J Eng Industry 1996; 118: 318-324.
-
(1996)
ASME Trans J Eng Industry
, vol.118
, pp. 318-324
-
-
Cai, W.1
Hu, S.J.2
Yuan, J.X.3
-
42
-
-
20644444780
-
Development of a finite element analysis tool for fixture design integrity verification and optimization
-
Nicholas A, Rencis JJ, Rong Y. Development of a finite element analysis tool for fixture design integrity verification and optimization. Int J Adv Manuf Tech 2005; 25: 409-419.
-
(2005)
Int J Adv Manuf Tech
, vol.25
, pp. 409-419
-
-
Nicholas, A.1
Rencis, J.J.2
Rong, Y.3
-
43
-
-
17144366981
-
Intelligent fixture design through a hybrid system of artificial neural network and genetic algorithm
-
Hamedi M. Intelligent fixture design through a hybrid system of artificial neural network and genetic algorithm. Artificial Intelligence Rev 2005; 23: 295-311.
-
(2005)
Artificial Intelligence Rev
, vol.23
, pp. 295-311
-
-
Hamedi, M.1
-
44
-
-
0038373888
-
The application of chip removal and frictional contact analysis for workpiece-fixture layout verification
-
Kaya N, Ozturk F. The application of chip removal and frictional contact analysis for workpiece-fixture layout verification. Int J Adv Manuf Tech 2003; 21(6): 411-419.
-
(2003)
Int J Adv Manuf Tech
, vol.21
, Issue.6
, pp. 411-419
-
-
Kaya, N.1
Ozturk, F.2
-
45
-
-
27144486606
-
Prediction of workpiece deformation in a fixture system using the finite element method
-
Siebenaler SP, Melkote SN. Prediction of workpiece deformation in a fixture system using the finite element method. Int J Machine Tools Manuf 2006; 46: 51-58.
-
(2006)
Int J Machine Tools Manuf
, vol.46
, pp. 51-58
-
-
Siebenaler, S.P.1
Melkote, S.N.2
-
47
-
-
58149251589
-
XML-based representation in a CBR system for fixture design
-
Fan L, Kumar AS. XML-based representation in a CBR system for fixture design. Comput-Aided Des Appl 2005; 2(1-4); 339-348.
-
(2005)
Comput-Aided Des Appl
, vol.2
, Issue.1-4
, pp. 339-348
-
-
Fan, L.1
Kumar, A.S.2
-
50
-
-
0029422753
-
Establishment of modular fixture element assembly relationship for automated fixture design. ASME: Manufacturing Engineering Division, MED
-
Bai Y, Rong Y. Establishment of modular fixture element assembly relationship for automated fixture design. ASME: Manufacturing Engineering Division, MED. Manuf Sci Eng 1995; 2(1): 805-816.
-
(1995)
Manuf Sci Eng
, vol.2
, Issue.1
, pp. 805-816
-
-
Bai, Y.1
Rong, Y.2
-
52
-
-
0031337814
-
An approach to automating modular fixture design and assembly. Proceedings of the Institution of Mechanical Engineers
-
Dai JR, Nee AYC, Fuh JYH, Kumar AS. An approach to automating modular fixture design and assembly. Proceedings of the Institution of Mechanical Engineers. Part B J Eng Manuf 1997; 211(7): 509-521.
-
(1997)
Part B J Eng Manuf
, vol.211
, Issue.7
, pp. 509-521
-
-
Dai, J.R.1
Nee, A.Y.C.2
Fuh, J.Y.H.3
Kumar, A.S.4
-
53
-
-
0031685933
-
FIX-DES: A computer-aided modular fixture configuration design system
-
Ma W, Lei Z, Rong Y. FIX-DES: A computer-aided modular fixture configuration design system. Int J Adv Manuf Tech 1998; 14: 21-32.
-
(1998)
Int J Adv Manuf Tech
, vol.14
, pp. 21-32
-
-
Ma, W.1
Lei, Z.2
Rong, Y.3
-
54
-
-
0034250307
-
Towards the design and development of a knowledge-based universal modular jigs and fixtures system
-
Kakish J, Zhang P, Zeid I. Towards the design and development of a knowledge-based universal modular jigs and fixtures system. J Intelligent Manuf 2000; 11: 381-401.
-
(2000)
J Intelligent Manuf
, vol.11
, pp. 381-401
-
-
Kakish, J.1
Zhang, P.2
Zeid, I.3
-
57
-
-
77949760239
-
Fixture assembly planning in a Web-based environment
-
Kang X, Peng Q. Fixture assembly planning in a Web-based environment. Int J Internet Manuf Service 2008; 1(2): 176-193.
-
(2008)
Int J Internet Manuf Service
, vol.1
, Issue.2
, pp. 176-193
-
-
Kang, X.1
Peng, Q.2
-
59
-
-
53549132251
-
Tool feasibility analysis for fixture assembly planning
-
130. 041010 online: DOI: 10.1115/1.2952819
-
Kang X, Peng Q. Tool feasibility analysis for fixture assembly planning. J Manuf Sci Eng ASME 2008; 130(4): 130. 041010 online: DOI: 10.1115/1.2952819.
-
(2008)
J Manuf Sci Eng ASME
, vol.130
, Issue.4
-
-
Kang, X.1
Peng, Q.2
-
60
-
-
0032188214
-
Feature-based fixturing analysis for machining parts represented with multiple sets of features
-
Tseng YJ. Feature-based fixturing analysis for machining parts represented with multiple sets of features. Int J Prod Res 1998; 36(10): 2743-2770.
-
(1998)
Int J Prod Res
, vol.36
, Issue.10
, pp. 2743-2770
-
-
Tseng, Y.J.1
-
61
-
-
2942702229
-
TAMIL: An integrated fixture design system for prismatic parts
-
Cecil J. TAMIL: An integrated fixture design system for prismatic parts. Int J Comput Integr Manuf 2004; 17(5): 421-434.
-
(2004)
Int J Comput Integr Manuf
, vol.17
, Issue.5
, pp. 421-434
-
-
Cecil, J.1
-
62
-
-
0035841886
-
Computer-aided fixture design system for comprehensive modular fixtures
-
Hou JL, Trappey AJC. Computer-aided fixture design system for comprehensive modular fixtures. Int J Prod Res 2001; 39(16): 3703-3725.
-
(2001)
Int J Prod Res
, vol.39
, Issue.16
, pp. 3703-3725
-
-
Hou, J.L.1
Trappey, A.J.C.2
-
63
-
-
0032093412
-
Application of a blackboard framework to a cooperative fixture design system
-
Roy U, Liao J. Application of a blackboard framework to a cooperative fixture design system. Comput Industry 1998; 37: 67-81.
-
(1998)
Comput Industry
, vol.37
, pp. 67-81
-
-
Roy, U.1
Liao, J.2
-
64
-
-
33746367165
-
Optimisation of machining fixture layout under multi-constraints
-
Wang Y, Chen X, Liu Q, Gindy N. Optimisation of machining fixture layout under multi-constraints. Int J Mach Tools Manuf 2006; 46: 1291-1300.
-
(2006)
Int J Mach Tools Manuf
, vol.46
, pp. 1291-1300
-
-
Wang, Y.1
Chen, X.2
Liu, Q.3
Gindy, N.4
-
65
-
-
30544451869
-
Machining fixture locating and clamping position optimization using genetic algorithms
-
Kaya N. Machining fixture locating and clamping position optimization using genetic algorithms. Comput Industry 2006; 57: 112-120.
-
(2006)
Comput Industry
, vol.57
, pp. 112-120
-
-
Kaya, N.1
-
66
-
-
0029226728
-
IFDA: An interactive fixture design and assembly environment
-
Fuh JYH, Nee AYC, Kumar AS, Teo JCS. IFDA: An interactive fixture design and assembly environment. Int J Comp Appl Technol 1995; 8(1-2): 30-40.
-
(1995)
Int J Comp Appl Technol
, vol.8
, Issue.1-2
, pp. 30-40
-
-
Fuh, J.Y.H.1
Nee, A.Y.C.2
Kumar, A.S.3
Teo, J.C.S.4
-
67
-
-
0035841886
-
Computer-aided fixture design system for comprehensive modular fixtures
-
Hou JL, Trappey AJC. Computer-aided fixture design system for comprehensive modular fixtures. Int J Prod Res 2001; 39(16): 3703-3725.
-
(2001)
Int J Prod Res
, vol.39
, Issue.16
, pp. 3703-3725
-
-
Hou, J.L.1
Trappey, A.J.C.2
-
68
-
-
0031169827
-
FixtureNet: Interactive computer-aided design via the World Wide Web
-
Wagner R, Castanotto G, Goldberg K. FixtureNet: Interactive computer-aided design via the World Wide Web. Int J Human- Comput Studies 1997; 46: 773-788.
-
(1997)
Int J Human- Comput Studies
, vol.46
, pp. 773-788
-
-
Wagner, R.1
Castanotto, G.2
Goldberg, K.3
-
69
-
-
0037884710
-
Development of an internet-enabled interactive fixture design system
-
Mervyn F, Kumar AS, Bok SH, Nee AYC. Development of an internet-enabled interactive fixture design system. CAD Comput Aided Des 2003; 35(1): 945-957.
-
(2003)
CAD Comput Aided Des
, vol.35
, Issue.1
, pp. 945-957
-
-
Mervyn, F.1
Kumar, A.S.2
Bok, S.H.3
Nee, A.Y.C.4
-
70
-
-
33646413400
-
Fixture design information support for integrated design and manufacturing
-
Mervyn F, Kumar AS, Nee AYC. Fixture design information support for integrated design and manufacturing, Int J Prod Res 2006; 44(11): 2205-2219.
-
(2006)
Int J Prod Res
, vol.44
, Issue.11
, pp. 2205-2219
-
-
Mervyn, F.1
Kumar, A.S.2
Nee, A.Y.C.3
-
71
-
-
17844384237
-
Knowledge model as an integrated way to reuse the knowledge for fixture design process
-
Hunter R, Vizan A, Perez J, Rios J. Knowledge model as an integrated way to reuse the knowledge for fixture design process. J Mater Process Technol 2005; 164-165: 1510-1518.
-
(2005)
J Mater Process Technol
, vol.164-165
, pp. 1510-1518
-
-
Hunter, R.1
Vizan, A.2
Perez, J.3
Rios, J.4
-
72
-
-
33947539958
-
A fixture design system for networked manufacturing
-
Kang YG, Wang Z, Li R, Jiang C. A fixture design system for networked manufacturing. Int J Comput Integr Manuf 2007; 20(2): 143-159.
-
(2007)
Int J Comput Integr Manuf
, vol.20
, Issue.2
, pp. 143-159
-
-
Kang, Y.G.1
Wang, Z.2
Li, R.3
Jiang, C.4
-
75
-
-
85171520677
-
-
US20060064289A1
-
Walacavage, J., Baumgartner, A., Kennedy, S., Ganti, S., Newman, E.: US20060064289A1 (2006).
-
(2006)
-
-
Walacavage, J.1
Baumgartner, A.2
Kennedy, S.3
Ganti, S.4
Newman, E.5
-
77
-
-
85171491064
-
-
US20070101568A1
-
Doom, M.J.: US20070101568A1 (2007).
-
(2007)
-
-
Doom, M.J.1
-
78
-
-
85171509715
-
-
US20080127474A1
-
McAllister, S. J.: US20080127474A1 (2008).
-
(2008)
-
-
McAllister, S.J.1
-
79
-
-
85171495666
-
-
US20056883225
-
Fowler, L.: US20056883225 (2005).
-
(2005)
-
-
Fowler, L.1
-
80
-
-
85171514299
-
-
US20077243407
-
Daris, P. E.: US20077243407 (2007).
-
(2007)
-
-
Daris, P.E.1
|