메뉴 건너뛰기




Volumn 21, Issue 10-11, 2003, Pages 827-835

Computer-aided Fixture Design Verification. Part 1. The Framework and Modelling

Author keywords

Computer aided fixture design (CAFD); Computer aided fixture design verification (CAFDV)

Indexed keywords

COMPUTER AIDED MANUFACTURING; ENTERPRISE RESOURCE PLANNING; OUTSOURCING;

EID: 0041821963     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00170-002-1399-7     Document Type: Article
Times cited : (50)

References (19)
  • 2
    • 0012984627 scopus 로고
    • Establishment of modular fixture component assembly relationship for automated fixture design
    • ASME IMECE, San Francisco, CA, MED 2-1, 12-17 November
    • Y. Bai and Y. Rong, "Establishment of modular fixture component assembly relationship for automated fixture design", Symposium on Computer-Aided Tooling, ASME IMECE, San Francisco, CA, MED 2-1, pp. 805-816, 12-17 November 1995.
    • (1995) Symposium on Computer-aided Tooling , pp. 805-816
    • Bai, Y.1    Rong, Y.2
  • 3
    • 0022074551 scopus 로고
    • Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures
    • H. Asada and A. By, "Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures", IEEE Journal of Robotics and Automation, 1, pp. 86-94, 1985.
    • (1985) IEEE Journal of Robotics and Automation , vol.1 , pp. 86-94
    • Asada, H.1    By, A.2
  • 4
    • 0024771578 scopus 로고
    • A mathematical approach to automatic configuration of machining fixtures: Analysis and synthesis
    • Y. C. Chou, V. Chandru and M. M. Barash, "A mathematical approach to automatic configuration of machining fixtures: analysis and synthesis", Journal of Engineering for Industry, 111, pp. 299-306, 1989.
    • (1989) Journal of Engineering for Industry , vol.111 , pp. 299-306
    • Chou, Y.C.1    Chandru, V.2    Barash, M.M.3
  • 9
    • 0032047386 scopus 로고    scopus 로고
    • Stability index and contact configuration planning for multifingered grasp
    • C. Xiong and Y. Xiong, "Stability index and contact configuration planning for multifingered grasp", Journal of Robotic Systems, 15(4), pp. 183-190, 1998.
    • (1998) Journal of Robotic Systems , vol.15 , Issue.4 , pp. 183-190
    • Xiong, C.1    Xiong, Y.2
  • 10
    • 0028551914 scopus 로고
    • Automated verification of clamping stability in computer-aided fixture design
    • Y. Rong, S. Wu and T. P. Chu, "Automated verification of clamping stability in computer-aided fixture design", Computers in Engineering, 1, pp. 421-426, 1994.
    • (1994) Computers in Engineering , vol.1 , pp. 421-426
    • Rong, Y.1    Wu, S.2    Chu, T.P.3
  • 12
    • 0029418883 scopus 로고
    • Locator error analysis for fixturing accuracy verification
    • September
    • Y. Rong, W. Li and Y. Bai, "Locator error analysis for fixturing accuracy verification", Computers in Engineering, pp. 825-832, September 1995.
    • (1995) Computers in Engineering , pp. 825-832
    • Rong, Y.1    Li, W.2    Bai, Y.3
  • 13
    • 0030213072 scopus 로고    scopus 로고
    • Machining accuracy analysis for computer-aided fixture design
    • Y. Rong and Y. Bai, "Machining accuracy analysis for computer-aided fixture design", Journal of Manufacturing Science and Engineering, 118, pp. 289-300, 1996.
    • (1996) Journal of Manufacturing Science and Engineering , vol.118 , pp. 289-300
    • Rong, Y.1    Bai, Y.2
  • 15
    • 0033208120 scopus 로고    scopus 로고
    • Finite element analysis and optimization in fixture design
    • S. Kashyap and W. R. DeVries, "Finite element analysis and optimization in fixture design", Structural Optimization, 18(2-3), pp. 193-201, 1999.
    • (1999) Structural Optimization , vol.18 , Issue.2-3 , pp. 193-201
    • Kashyap, S.1    DeVries, W.R.2
  • 16
    • 0032658533 scopus 로고    scopus 로고
    • Fixturing surface accessibility analysis for automated fixture design
    • J. Li, W. Ma and Y. Rong, "Fixturing surface accessibility analysis for automated fixture design", International Journal of Production Research, 37(13), pp. 2997-3016, 1999.
    • (1999) International Journal of Production Research , vol.37 , Issue.13 , pp. 2997-3016
    • Li, J.1    Ma, W.2    Rong, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.