-
1
-
-
0031645805
-
Automated setup planning for lathe machining
-
S. H. Huang, "Automated setup planning for lathe machining", Journal of Manufacturing Systems, 17(3), pp. 196-208, 1998.
-
(1998)
Journal of Manufacturing Systems
, vol.17
, Issue.3
, pp. 196-208
-
-
Huang, S.H.1
-
2
-
-
0002274363
-
Algorithms for the minimisation of setups, and tool changes in simply fixturable components in milling
-
S. E. Sarma and P. K. Wright, "Algorithms for the minimisation of setups, and tool changes in simply fixturable components in milling", Journal of Manufacturing Systems, 15(2), pp. 95-112, 1996.
-
(1996)
Journal of Manufacturing Systems
, vol.15
, Issue.2
, pp. 95-112
-
-
Sarma, S.E.1
Wright, P.K.2
-
3
-
-
44049122190
-
Automatic setup planning and fixture design for machining
-
H. Sakurai, "Automatic setup planning and fixture design for machining", Journal of Manufacturing Systems, 11(1), pp. 30-37, 1992.
-
(1992)
Journal of Manufacturing Systems
, vol.11
, Issue.1
, pp. 30-37
-
-
Sakurai, H.1
-
4
-
-
0038470545
-
Workpiece localization algorithms: Performance, evaluation and reliability analysis
-
Y. X. Chu, J. B. Gou and Z. X. Li, "Workpiece localization algorithms: performance, evaluation and reliability analysis", Journal of Manufacturing Systems, 18(2), pp. 113-126, 1999.
-
(1999)
Journal of Manufacturing Systems
, vol.18
, Issue.2
, pp. 113-126
-
-
Chu, Y.X.1
Gou, J.B.2
Li, Z.X.3
-
5
-
-
0030261744
-
Machining features and algorithms for set-up planning and fixture design
-
F. Ozturk, N. Kaya, O.B. Alankuş and S. Sevinç, "Machining features and algorithms for set-up planning and fixture design", Computer Integrated Manufacturing Systems, 9(4), pp. 207-216, 1996.
-
(1996)
Computer Integrated Manufacturing Systems
, vol.9
, Issue.4
, pp. 207-216
-
-
Ozturk, F.1
Kaya, N.2
Alankuş, O.B.3
Sevinç, S.4
-
6
-
-
0035889167
-
Algorithms for grouping machining operations and planning workpiece location under dynamic machining conditions
-
N. Kaya and F. Ozturk, "Algorithms for grouping machining operations and planning workpiece location under dynamic machining conditions", International Journal of Production Research, 39(15), pp. 3329-3351, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.15
, pp. 3329-3351
-
-
Kaya, N.1
Ozturk, F.2
-
7
-
-
0035840761
-
Flexible fixture design and automation: Review, issues and future directions
-
Z. M. Bi and W. J. Zhang, "Flexible fixture design and automation: review, issues and future directions", International Journal of Production Research, 39(13), pp. 2867-2894, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.13
, pp. 2867-2894
-
-
Bi, Z.M.1
Zhang, W.J.2
-
9
-
-
0022074551
-
Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures
-
H. Asada and A. B. By, "Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures", IEEE Journal of Robotics and Automation, 1(2), pp. 86-93, 1985.
-
(1985)
IEEE Journal of Robotics and Automation
, vol.1
, Issue.2
, pp. 86-93
-
-
Asada, H.1
By, A.B.2
-
10
-
-
0024771578
-
A mathematical approach to automatic configuration of machining fixtures: Analysis and synthesis
-
Y.-C. Chou, V. Chandru and M. M. Barash, "A mathematical approach to automatic configuration of machining fixtures: analysis and synthesis", ASME Journal of Engineering for Industry, 111, pp. 299-306, 1989.
-
(1989)
ASME Journal of Engineering for Industry
, vol.111
, pp. 299-306
-
-
Chou, Y.-C.1
Chandru, V.2
Barash, M.M.3
-
11
-
-
0031995184
-
Automated modular fixture planning: Accuracy, clamping and accessibility analyses
-
Y. Wu, Y. Rong, W. Ma and S. R. Le Clair, "Automated modular fixture planning: accuracy, clamping and accessibility analyses", Robotics and Computer-Integrated Manufacturing, 14, pp. 17-26, 1998.
-
(1998)
Robotics and Computer-Integrated Manufacturing
, vol.14
, pp. 17-26
-
-
Wu, Y.1
Rong, Y.2
Ma, W.3
Le Clair, S.R.4
-
12
-
-
0031147484
-
Fixture analysis under dynamic machining
-
R. T. Meyer and F. W. Liou, "Fixture analysis under dynamic machining", International Journal of Production Research, 35(5), pp. 1471-1489, 1997.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.5
, pp. 1471-1489
-
-
Meyer, R.T.1
Liou, F.W.2
-
13
-
-
0006421439
-
FIX-DES: A computer aided modular fixture configuration design system
-
W. Ma, Z. Lei and Y. Rong, "FIX-DES: a computer aided modular fixture configuration design system", Proceedings of CIE: Computers in Engineering, California, pp. 1-12, 1997.
-
(1997)
Proceedings of CIE: Computers in Engineering, California
, pp. 1-12
-
-
Ma, W.1
Lei, Z.2
Rong, Y.3
-
14
-
-
0033207721
-
A computational geometry approach to optimum clamping synthesis of machining fixtures
-
Z. J. Tao, A. S. Kumar and A. Y. C. Nee, "A computational geometry approach to optimum clamping synthesis of machining fixtures", International Journal of Production Research, 37(15), pp. 3495-3517, 1999.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.15
, pp. 3495-3517
-
-
Tao, Z.J.1
Kumar, A.S.2
Nee, A.Y.C.3
-
15
-
-
0030551229
-
Finite element methods for contact problems with friction
-
P. Wriggers, "Finite element methods for contact problems with friction", Tribology International, 29(8), pp. 651-658, 1996.
-
(1996)
Tribology International
, vol.29
, Issue.8
, pp. 651-658
-
-
Wriggers, P.1
-
16
-
-
0032183558
-
Stress analysis of three-dimensional contact problems using the boundary element method
-
D. Segond and A. Tafreshi, "Stress analysis of three-dimensional contact problems using the boundary element method", Engineering Analysis with Boundary Elements, 22, pp. 199-214, 1998.
-
(1998)
Engineering Analysis with Boundary Elements
, vol.22
, pp. 199-214
-
-
Segond, D.1
Tafreshi, A.2
-
18
-
-
0033078910
-
Off-line modelling and planning of optimal clamping forces for an intelligent fixturing system
-
Y. F. Wang, Y. S. Wong and J. Y. H. Fuh, "Off-line modelling and planning of optimal clamping forces for an intelligent fixturing system", International Journal of Machine Tools and Manufacture, 39, pp. 253-271, 1999.
-
(1999)
International Journal of Machine Tools and Manufacture
, vol.39
, pp. 253-271
-
-
Wang, Y.F.1
Wong, Y.S.2
Fuh, J.Y.H.3
-
19
-
-
85024518717
-
Optimisation methods applied to selecting support positions in fixture design
-
R. J. Menassa and W. R. DeVries, "Optimisation methods applied to selecting support positions in fixture design", ASME Journal of Engineering for Industry, 113, pp. 412-418, 1991.
-
(1991)
ASME Journal of Engineering for Industry
, vol.113
, pp. 412-418
-
-
Menassa, R.J.1
DeVries, W.R.2
-
20
-
-
0030702282
-
Fixture design synthesis for a flexible manufacturing system
-
U. Roy, O J. Liao, P.-L. Sun and M. C. Fields, "Fixture design synthesis for a flexible manufacturing system", Integrated Computer Aided Engineering, 4(2), pp. 101-113, 1997.
-
(1997)
Integrated Computer Aided Engineering
, vol.4
, Issue.2
, pp. 101-113
-
-
Roy, U.1
Liao, O.J.2
Sun, P.-L.3
Fields, M.C.4
-
21
-
-
0033897321
-
Flexible multibody dynamics based fixture-workpiece analysis model for fixturing stability
-
Y. J. G. Liao and S. J. Hu, "Flexible multibody dynamics based fixture-workpiece analysis model for fixturing stability", International Journal of Machine Tools and Manufacture, 40, pp. 343-362, 2000.
-
(2000)
International Journal of Machine Tools and Manufacture
, vol.40
, pp. 343-362
-
-
Liao, Y.J.G.1
Hu, S.J.2
-
22
-
-
0011740028
-
Optimal fixture design for drilling through deformable plate workpieces. Part I: Model formulation
-
K. R. Wardak, U. Tasch and P. G. Charalambides, "Optimal fixture design for drilling through deformable plate workpieces. Part I: Model formulation", Journal of Manufacturing Systems, 20(1), pp. 23-32, 2001.
-
(2001)
Journal of Manufacturing Systems
, vol.20
, Issue.1
, pp. 23-32
-
-
Wardak, K.R.1
Tasch, U.2
Charalambides, P.G.3
-
23
-
-
0034817049
-
An integrated model of a fixture-workpiece system for surface quality prediction
-
Y. G. Liao and S. J. Hu, "An integrated model of a fixture-workpiece system for surface Quality Prediction", International Journal of Advanced Manufacturing Technology, 17, pp. 810-818, 2001.
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.17
, pp. 810-818
-
-
Liao, Y.G.1
Hu, S.J.2
-
24
-
-
0000316323
-
Review of formulations for elastostatic frictional contact problems
-
A. R. Mijar and J. S. Arora, "Review of formulations for elastostatic frictional contact problems", Struct Multidisc Optim. 20, pp. 167-189, 2000.
-
(2000)
Struct Multidisc Optim.
, vol.20
, pp. 167-189
-
-
Mijar, A.R.1
Arora, J.S.2
-
26
-
-
0030264826
-
Modeling of frictional elastic fixture-workpiece system for improving location accuracy
-
G. Xiuwen, J. Y. H. Fuh and A. Y. C. Nee, "Modeling of frictional elastic fixture-workpiece system for improving location accuracy", IEE Transactions, 28, pp. 821-827, 1996.
-
(1996)
IEE Transactions
, vol.28
, pp. 821-827
-
-
Xiuwen, G.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
-
29
-
-
0032835901
-
Workpiece-fixture static friction under dynamic loading
-
J. F. Hurtado and S. N. Melkote, "Workpiece-fixture static friction under dynamic loading", Wear, 231, pp. 139-152, 1999.
-
(1999)
Wear
, vol.231
, pp. 139-152
-
-
Hurtado, J.F.1
Melkote, S.N.2
-
30
-
-
0033874460
-
An experimental evaluation of coefficients of static friction of common workpiece-fixture element pairs
-
W. Xie, E. C. De Meter and M. W. Trethewey, "An experimental evaluation of coefficients of static friction of common workpiece-fixture element pairs", International Journal of Machine Tools and Manufacture, 40, pp. 467-488, 2000.
-
(2000)
International Journal of Machine Tools and Manufacture
, vol.40
, pp. 467-488
-
-
Xie, W.1
De Meter, E.C.2
Trethewey, M.W.3
-
31
-
-
0033895763
-
Analysis of reactions and minimum clamping force for machining fixtures with large contact areas
-
B. Li, S. N. Melkote and S. Y. Liang, "Analysis of reactions and minimum clamping force for machining fixtures with large contact areas", International Journal of Advanced Manufacturing Technology, 16, pp. 79-84, 2000.
-
(2000)
International Journal of Advanced Manufacturing Technology
, vol.16
, pp. 79-84
-
-
Li, B.1
Melkote, S.N.2
Liang, S.Y.3
-
32
-
-
0034803158
-
Fixture clamping force optimisation and its impact on workpiece location accuracy
-
B. Li and S. N. Melkote, "Fixture clamping force optimisation and its impact on workpiece location accuracy", International Journal of Advanced Manufacturing Technology, 17, pp. 104-113, 2001.
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.17
, pp. 104-113
-
-
Li, B.1
Melkote, S.N.2
-
33
-
-
0038808370
-
-
ANSYS Inc.
-
ANSYS 5.7, ANSYS Inc., 2000.
-
(2000)
ANSYS 5.7
-
-
-
34
-
-
0003822707
-
Principles of process planning
-
Chapman & Hall, London
-
G. Halevi and R. D. Weill, Principles of Process Planning, Chapman & Hall, London, 1995.
-
(1995)
-
-
Halevi, G.1
Weill, R.D.2
|