-
3
-
-
0030284535
-
Analysis of production control systems Kanban and CONWIP
-
Gstettner S., and Kuhn H. Analysis of production control systems Kanban and CONWIP. Int. J. Prod. Res. 34 11 (1996) 3253-3273
-
(1996)
Int. J. Prod. Res.
, vol.34
, Issue.11
, pp. 3253-3273
-
-
Gstettner, S.1
Kuhn, H.2
-
4
-
-
0035883116
-
A mathematical programming model for production planning using CONWIP
-
Zhang W., and Chen M. A mathematical programming model for production planning using CONWIP. Int. J. Prod. Res. 39 12 (2001) 2723-2734
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.12
, pp. 2723-2734
-
-
Zhang, W.1
Chen, M.2
-
5
-
-
33748077825
-
-
S.E. Grasman, T. Lennon Olsen, J.R. Birge, Setting base stock levels in multi-product systems with setups and random yield, University of Missouri-Rolla, Rolla, Missouri 65409-0370, 2003.
-
-
-
-
6
-
-
0024719991
-
Queuing models of Kanban and MRP controlled production systems
-
Buzacott J.A. Queuing models of Kanban and MRP controlled production systems. Eng. Cost Prod. Econ. 17 (1989) 3-20
-
(1989)
Eng. Cost Prod. Econ.
, vol.17
, pp. 3-20
-
-
Buzacott, J.A.1
-
7
-
-
0028410211
-
Generic Kanban systems for dynamic environments
-
Chang T.M., and Yih Y. Generic Kanban systems for dynamic environments. Int. J. Prod. Res. 32 4 (1994) 889-902
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.4
, pp. 889-902
-
-
Chang, T.M.1
Yih, Y.2
-
8
-
-
0034288465
-
The extended Kanban control system for production coordination of assembly manufacturing systems
-
Chaouiya C., Liberopoulos G., and Dallery Y. The extended Kanban control system for production coordination of assembly manufacturing systems. IIE Trans. 32 (2000) 999-1012
-
(2000)
IIE Trans.
, vol.32
, pp. 999-1012
-
-
Chaouiya, C.1
Liberopoulos, G.2
Dallery, Y.3
-
9
-
-
0034379814
-
A unified framework for pull control mechanisms in multi-stage manufacturing systems
-
MacGregor Smith J., Gershwin S.B., and Papadopoulos C.T. (Eds), Baltzer Science, Bussum, The Netherlands
-
Liberopoulos G., and Dallery Y. A unified framework for pull control mechanisms in multi-stage manufacturing systems. In: MacGregor Smith J., Gershwin S.B., and Papadopoulos C.T. (Eds). Annals of Operations Research, vol. 93: Performance Evaluation and Optimization of Production Lines (2000), Baltzer Science, Bussum, The Netherlands 325-355
-
(2000)
Annals of Operations Research, vol. 93: Performance Evaluation and Optimization of Production Lines
, pp. 325-355
-
-
Liberopoulos, G.1
Dallery, Y.2
-
10
-
-
0037139690
-
On control strategies in a multi-stage production system
-
Xiaobo Z., Gong Q., and Wang J. On control strategies in a multi-stage production system. Int. J. Prod. Res. 40 5 (2002) 1155-1171
-
(2002)
Int. J. Prod. Res.
, vol.40
, Issue.5
, pp. 1155-1171
-
-
Xiaobo, Z.1
Gong, Q.2
Wang, J.3
-
11
-
-
33748089994
-
-
K. Ananth, S. Rajan, V. Mary, Two moment approximations for fork/join stations with applications to modeling Kanban system. Proceeding of the 12th Conference on Production and Operations Management Society, POM-2001, March 30-April 2, 2001, Orlando, FI.
-
-
-
-
12
-
-
0032115202
-
A generalized analysis technique for queuing networks with mixed priority strategy and class switching
-
Greiner S., Bolch G., and Begain K. A generalized analysis technique for queuing networks with mixed priority strategy and class switching. Comput. Commun. 21 (1998) 819-832
-
(1998)
Comput. Commun.
, vol.21
, pp. 819-832
-
-
Greiner, S.1
Bolch, G.2
Begain, K.3
-
13
-
-
0029774986
-
An analytical method for performance evaluation of Kanban controlled production system
-
Dallery Y. An analytical method for performance evaluation of Kanban controlled production system. Oper. Res. 44 1 (1996)
-
(1996)
Oper. Res.
, vol.44
, Issue.1
-
-
Dallery, Y.1
-
14
-
-
0033225131
-
An overview of design and operational issues of Kanban systems
-
Akturk M.S., and Erhun F. An overview of design and operational issues of Kanban systems. Int. J. Prod. Res. 37 17 (1999) 3859-3881
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.17
, pp. 3859-3881
-
-
Akturk, M.S.1
Erhun, F.2
-
15
-
-
0042221729
-
Throughput equivalences in fork/join queuing networks with finite buffers and general service times
-
Paik C.H., and Tcha D.W. Throughput equivalences in fork/join queuing networks with finite buffers and general service times. Int. J. Prod. Res. 33 3 (1995) 695-703
-
(1995)
Int. J. Prod. Res.
, vol.33
, Issue.3
, pp. 695-703
-
-
Paik, C.H.1
Tcha, D.W.2
-
16
-
-
0032708083
-
Operations planning for a multi-stage Kanban system
-
Sarker B.R., and Balan C.V. Operations planning for a multi-stage Kanban system. Eur. J. Oper. Res. 112 2 (1999) 284-303
-
(1999)
Eur. J. Oper. Res.
, vol.112
, Issue.2
, pp. 284-303
-
-
Sarker, B.R.1
Balan, C.V.2
-
17
-
-
0031641970
-
Optimum number of Kanban between two adjacent stations
-
Nori V.S., and Sarker B.R. Optimum number of Kanban between two adjacent stations. Production Plann. Control 9 1 (1998) 60-65
-
(1998)
Production Plann. Control
, vol.9
, Issue.1
, pp. 60-65
-
-
Nori, V.S.1
Sarker, B.R.2
|