메뉴 건너뛰기




Volumn 26, Issue 5, 2008, Pages 471-484

Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry

Author keywords

Performance evaluation; Pre qualification; Selection; Subcontracting; Tendering

Indexed keywords

BUILDINGS; CONTRACTORS; OUTSOURCING; SURVEYING;

EID: 43049101104     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190801918730     Document Type: Article
Times cited : (82)

References (24)
  • 1
    • 20444432198 scopus 로고    scopus 로고
    • Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network and genetic algorithm techniques
    • Al-Sobiei, O. S., Arditi, D. and Polat, G. (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network and genetic algorithm techniques. Construction Management and Economics, 23:4, pp. 423-430.
    • (2005) Construction Management and Economics , vol.23 , Issue.4 , pp. 423-430
    • Al-Sobiei, O.S.1    Arditi, D.2    Polat, G.3
  • 2
    • 32844460647 scopus 로고    scopus 로고
    • The effectiveness of the briefing process in the attainment of client objectives for construction projects in South Africa
    • in Royal Institution of Chartered Surveyors, London
    • Bowen, P. A., Pearl, R. G., Nkado, R. N. and Edwards, P. J. (1997) The effectiveness of the briefing process in the attainment of client objectives for construction projects in South Africa, in COBRA 97: RICS Research. pp. 1-10. Royal Institution of Chartered Surveyors, London
    • (1997) COBRA 97: RICS Research , pp. 1-10
    • Bowen, P.A.1    Pearl, R.G.2    Nkado, R.N.3    Edwards, P.J.4
  • 5
    • 0036540440 scopus 로고    scopus 로고
    • Rethinking the multi-attribute utility approach based procurement route selection technique
    • Chang, C. and Ive, G. (2002) Rethinking the multi-attribute utility approach based procurement route selection technique. Construction Management and Economics, 20:3, pp. 275-284.
    • (2002) Construction Management and Economics , vol.20 , Issue.3 , pp. 275-284
    • Chang, C.1    Ive, G.2
  • 6
    • 33747952426 scopus 로고
    • CIOB Chartered Institute of Building, Ascot, UK
    • CIOB (1983) Code of Estimating Practice, Chartered Institute of Building, Ascot, UK
    • (1983) Code of Estimating Practice
  • 8
    • 43049118843 scopus 로고    scopus 로고
    • Performance improvement challenge of contractors
    • CSIR Building and Construction Technology
    • CSIR (2002) Performance improvement challenge of contractors. Council for Scientific and Industrial Research. Building and Construction Technology
    • (2002) Council for Scientific and Industrial Research
  • 9
    • 43049117392 scopus 로고    scopus 로고
    • Status of the construction industry in South Africa
    • CSIR Building and Construction Technology
    • CSIR (2002) Status of the construction industry in South Africa. Council for Scientific and Industrial Research. Building and Construction Technology
    • (2002) Council for Scientific and Industrial Research
  • 12
    • 34547600532 scopus 로고    scopus 로고
    • Risk under performance-based contracting in the UK construction sector
    • Gruneberg, S., Hughes, W. and Ancell, D. (2007) Risk under performance-based contracting in the UK construction sector. Construction Management and Economics, 25:7, pp. 691-699.
    • (2007) Construction Management and Economics , vol.25 , Issue.7 , pp. 691-699
    • Gruneberg, S.1    Hughes, W.2    Ancell, D.3
  • 13
    • 0028454852 scopus 로고
    • The contractor-subcontractor relationship: The subcontractors' views
    • Hinze, J. and Tracy, A. (1994) The contractor-subcontractor relationship: The subcontractors' views. Journal of Construction Engineering and Management, 2:1, pp. 274-287.
    • (1994) Journal of Construction Engineering and Management , vol.2 , Issue.1 , pp. 274-287
    • Hinze, J.1    Tracy, A.2
  • 14
    • 43049098768 scopus 로고    scopus 로고
    • Improving contractor/subcontractor relationships through innovative contracting
    • Hoban, A. M. and Francis, V. E. (2003) Improving contractor/ subcontractor relationships through innovative contracting. Construction Innovation and Global Challenges, 2:2, pp. 771-778.
    • (2003) Construction Innovation and Global Challenges , vol.2 , Issue.2 , pp. 771-778
    • Hoban, A.M.1    Francis, V.E.2
  • 19
    • 33947395204 scopus 로고    scopus 로고
    • On-site subcontractor evaluation method based on lean principles and partnering practices
    • Maturana, S., Alarcon, L. F., Gazmuri, P. and Vrsalovic, M. (2007) On-site subcontractor evaluation method based on lean principles and partnering practices. Journal of Management in Engineering, 23:2, pp. 67-74.
    • (2007) Journal of Management in Engineering , vol.23 , Issue.2 , pp. 67-74
    • Maturana, S.1    Alarcon, L.F.2    Gazmuri, P.3    Vrsalovic, M.4
  • 20
    • 32844472868 scopus 로고    scopus 로고
    • Conceptual framework for assessment of client needs and satisfaction in the building development process
    • Mbachu, J. I. C. and Nkado, R. N. (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24:1, pp. 31-44.
    • (2006) Construction Management and Economics , vol.24 , Issue.1 , pp. 31-44
    • Mbachu, J.I.C.1    Nkado, R.N.2
  • 21
    • 34250838802 scopus 로고    scopus 로고
    • Factors constraining successful building projects implementation in South Africa
    • Mbachu, J. I. C. and Nkado, R. N. (2007) Factors constraining successful building projects implementation in South Africa. Construction Management and Economics, 2:1, pp. 39-54.
    • (2007) Construction Management and Economics , vol.2 , Issue.1 , pp. 39-54
    • Mbachu, J.I.C.1    Nkado, R.N.2
  • 22
    • 0037603787 scopus 로고    scopus 로고
    • A model for subcontractor selection in refurbishment projects
    • Okoro, M. I. and Torrance, V. B. (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17:3, pp. 315-327.
    • (1999) Construction Management and Economics , vol.17 , Issue.3 , pp. 315-327
    • Okoro, M.I.1    Torrance, V.B.2
  • 24
    • 0347902624 scopus 로고    scopus 로고
    • The use of targeted procurement as an instrument of poverty alleviation and job creation in infrastructure projects
    • Sweet & Maxwell, London
    • Watermeyer, R. (2000) The use of targeted procurement as an instrument of poverty alleviation and job creation in infrastructure projects. Public Procurement Law Review, pp. 16-21. Sweet & Maxwell, London
    • (2000) Public Procurement Law Review , pp. 16-21
    • Watermeyer, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.