Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives

Author keywords

Design novation; Factor analysis; Procurement practice

Indexed keywords

CONSTRUCTION INDUSTRY; CONTRACTORS; CUSTOMER SATISFACTION; DESIGN; LIFE CYCLE; SURVEYS;

EID: 57449104522     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190802512359     Document Type: Article
Times cited : (34)

References (28)
  • 2
    • 84861143214 scopus 로고
    • Design and build: A survey of construction contractor's views
    • Akintoye, A. (1994) Design and build: A survey of construction contractor's views. Construction Management and Economics, 12, pp. 155-163.
    • (1994) Construction Management and Economics , vol.12 , pp. 155-163
    • Akintoye, A.1
  • 5
    • 57449102773 scopus 로고    scopus 로고
    • Novated design and construct projects: Developing relationships in Melbourne
    • Arnold, S. (2005) Novated design and construct projects: Developing relationships in Melbourne.
    • (2005)
    • Arnold, S.1
  • 6
    • 57449106531 scopus 로고    scopus 로고
    • Novation contract: An emerging procurement practice in Hong Kong
    • Chan, A. P. C. (1999) Novation contract: An emerging procurement practice in Hong Kong. Australia Institute of Quantity Surveyors, 3:1, pp. 1-14.
    • (1999) Australia Institute of Quantity Surveyors , vol.3 , Issue.1 , pp. 1-14
    • Chan, A.P.C.1
  • 7
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D. W. M. and Kumaraswamy, M. M. (1997) A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15:1, pp. 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 8
    • 57449107448 scopus 로고
    • Architects legal position on D&B
    • Chappell, D. (1994) Architects legal position on D&B. The Architects' Journal, p. 43.
    • (1994) The Architects' Journal , pp. 43
    • Chappell, D.1
  • 11
    • 57449118339 scopus 로고    scopus 로고
    • Examining the dynamics of novation from the principal contractors' and architects' perspectives
    • Griffith, A. and King, A. (2004) Examining the dynamics of novation from the principal contractors' and architects' perspectives. Australian Journal of Construction Economics and Building, 3:1, pp. 13-18.
    • (2004) Australian Journal of Construction Economics and Building , vol.3 , Issue.1 , pp. 13-18
    • Griffith, A.1    King, A.2
  • 13
    • 18144374111 scopus 로고    scopus 로고
    • Factors affecting cost performance: Evidence from the Indian construction projects
    • Iyer, K. C. and Jha, K. N. (2005) Factors affecting cost performance: evidence from the Indian construction projects. International Journal of Project Management, 23, pp. 283-295.
    • (2005) International Journal of Project Management , vol.23 , pp. 283-295
    • Iyer, K.C.1    Jha, K.N.2
  • 14
    • 57449106147 scopus 로고
    • Selection and appointment of contractor's consultants
    • Macmillan Education Ltd, Basingstoke
    • Janssens, D. E. L. (1991) Selection and appointment of contractor's consultants. Design-Build Explained, pp. 131-135. Macmillan Education Ltd, Basingstoke
    • (1991) Design-Build Explained , pp. 131-135
    • Janssens, D.E.L.1
  • 15
    • 57449086202 scopus 로고    scopus 로고
    • Team transfers
    • Meara, C. D. (1996) Team transfers. Building, p. 33.
    • (1996) Building , pp. 33
    • Meara, C.D.1
  • 18
    • 0036466939 scopus 로고    scopus 로고
    • Contractor's risks in design, novate and construct contracts
    • Ng, S. T. and Skitmore, R. M. (2002) Contractor's risks in design, novate and construct contracts. International Journal of Project Management, 20, pp. 119-126.
    • (2002) International Journal of Project Management , vol.20 , pp. 119-126
    • Ng, S.T.1    Skitmore, R.M.2
  • 20
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • Sambasivam, M. and Soon, Y. W. (2007) Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25, pp. 517-526.
    • (2007) International Journal of Project Management , vol.25 , pp. 517-526
    • Sambasivam, M.1    Soon, Y.W.2
  • 22
    • 67651079207 scopus 로고
    • Which procurement system? Towards a universal procurement selection technique
    • Skitmore, R. M. and Marsden, D. E. (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6, pp. 71-89.
    • (1988) Construction Management and Economics , vol.6 , pp. 71-89
    • Skitmore, R.M.1    Marsden, D.E.2
  • 23
    • 2042456959 scopus 로고
    • Differing benefits of novation and consultant switch
    • Speed, N. (1995) Differing benefits of novation and consultant switch. The Architects' Journal, pp. 52-54.
    • (1995) The Architects' Journal , pp. 52-54
    • Speed, N.1
  • 24
    • 57449118755 scopus 로고
    • Understanding novation
    • Swindall, W. (1993) Understanding novation. Building, p. 27.
    • (1993) Building , pp. 27
    • Swindall, W.1
  • 25
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • Trost, S. M. and Oberlender, G. D. (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Construction Engineering and Management, 129:2, pp. 198-204.
    • (2003) Construction Engineering and Management , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 28
    • 26644443645 scopus 로고    scopus 로고
    • Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects
    • Zhang, X. (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131:10, pp. 1054-1064.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.10 , pp. 1054-1064
    • Zhang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.