메뉴 건너뛰기




Volumn 18, Issue 2, 2005, Pages 69-81

Development of a risk-based maintenance (RBM) strategy for a power-generating plant

Author keywords

Maintenance planning; Power plant; Risk assessment; Risk based maintenance

Indexed keywords

COST EFFECTIVENESS; ELECTRIC BREAKDOWN; FAILURE ANALYSIS; OPTIMIZATION; POWER GENERATION; POWER PLANTS; PREVENTIVE MAINTENANCE; RELIABILITY; RISK ASSESSMENT; STRATEGIC PLANNING;

EID: 16244421113     PISSN: 09504230     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jlp.2005.01.002     Document Type: Article
Times cited : (167)

References (22)
  • 4
    • 0032142742 scopus 로고    scopus 로고
    • ASME risk-based in service inspection and testing: An outlook to the future
    • R.K. Balkey, and J.R. Art ASME risk-based in service inspection and testing: An outlook to the future Society for Risk Analysis 18 4 1998
    • (1998) Society for Risk Analysis , vol.18 , Issue.4
    • Balkey, R.K.1    Art, J.R.2
  • 5
    • 0034881839 scopus 로고    scopus 로고
    • A risk-based model for inspection and maintenance of cross-country petroleum pipeline
    • P.M. Dey A risk-based model for inspection and maintenance of cross-country petroleum pipeline Journal of Quality in Maintenance Engineering 40 4 2001 24 31
    • (2001) Journal of Quality in Maintenance Engineering , vol.40 , Issue.4 , pp. 24-31
    • Dey, P.M.1
  • 8
    • 0032026874 scopus 로고    scopus 로고
    • Risk based prioritization of maintenance repair work
    • A.J. Harnly Risk based prioritization of maintenance repair work Process Safety Progress 17 1 1998 32 38
    • (1998) Process Safety Progress , vol.17 , Issue.1 , pp. 32-38
    • Harnly, A.J.1
  • 10
    • 0034632168 scopus 로고    scopus 로고
    • Analytical simulation and PROFAT II: A new methodology and a computer automated tool for fault tree analysis in chemical process industries
    • F.I. Khan, and S.A. Abbasi Analytical simulation and PROFAT II: A new methodology and a computer automated tool for fault tree analysis in chemical process industries Journal of Hazardous Materials 75 2000 1 27
    • (2000) Journal of Hazardous Materials , vol.75 , pp. 1-27
    • Khan, F.I.1    Abbasi, S.A.2
  • 11
    • 0242487685 scopus 로고    scopus 로고
    • Risk-based maintenance (RBM): A quantitative approach for maintenance/inspection scheduling and planning
    • F.I. Khan, and M.R. Haddara Risk-based maintenance (RBM): A quantitative approach for maintenance/inspection scheduling and planning Journal of Loss Prevention in the Process Industries 16 2003 516 573
    • (2003) Journal of Loss Prevention in the Process Industries , vol.16 , pp. 516-573
    • Khan, F.I.1    Haddara, M.R.2
  • 12
    • 2142815698 scopus 로고    scopus 로고
    • Risk-based maintenance of ethylene oxide process plant
    • F.I. Khan, and M.R. Haddara Risk-based maintenance of ethylene oxide process plant Journal of Hazardous Materials A108 2004 147 159
    • (2004) Journal of Hazardous Materials , vol.108 , pp. 147-159
    • Khan, F.I.1    Haddara, M.R.2
  • 13
    • 0003447810 scopus 로고
    • Gulf Publication House Houston
    • T.A. Kletz What went wrong 1994 Gulf Publication House Houston
    • (1994) What Went Wrong
    • Kletz, T.A.1
  • 14
    • 6544244590 scopus 로고    scopus 로고
    • Maintenance strategies for mechanized and automated mining systems; A reliability and risk analysis based approach
    • U. Kumar Maintenance strategies for mechanized and automated mining systems; a reliability and risk analysis based approach Journal of Mines, Metals and Fuels, Annual Review 1998 343 347
    • (1998) Journal of Mines, Metals and Fuels, Annual Review , pp. 343-347
    • Kumar, U.1
  • 16
  • 20
    • 0034614748 scopus 로고    scopus 로고
    • Maintenance-based strategies for environmental risk minimization on the process industries
    • C.G. Vassiliadis, and E.N. Pistikopoulos Maintenance-based strategies for environmental risk minimization on the process industries Journal of Hazardous Materials 71 2000 481 501
    • (2000) Journal of Hazardous Materials , vol.71 , pp. 481-501
    • Vassiliadis, C.G.1    Pistikopoulos, E.N.2
  • 21
    • 0029237571 scopus 로고
    • Optimization of test and maintenance intervals based on risk and cost
    • J.K. Vaurio Optimization of test and maintenance intervals based on risk and cost Reliability Engineering and System Safety 49 1995 23 36
    • (1995) Reliability Engineering and System Safety , vol.49 , pp. 23-36
    • Vaurio, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.