-
1
-
-
85004844221
-
Group and organizational learning curves: individual, system and environmental components
-
Argote L. Group and organizational learning curves: individual, system and environmental components. British Journal of Social Psychology 32 1 (1993) 31-51
-
(1993)
British Journal of Social Psychology
, vol.32
, Issue.1
, pp. 31-51
-
-
Argote, L.1
-
3
-
-
0012277596
-
Multivariate analysis of the effect of learning and forgetting on product quality
-
Badiru A.B. Multivariate analysis of the effect of learning and forgetting on product quality. International Journal of Production Research 33 3 (1995) 777-794
-
(1995)
International Journal of Production Research
, vol.33
, Issue.3
, pp. 777-794
-
-
Badiru, A.B.1
-
4
-
-
33847082147
-
Serial production systems with random yield and rigid demand: a heuristic
-
Ben-Zvi T., and Grosfeld-Nir A. Serial production systems with random yield and rigid demand: a heuristic. Operations Research Letters 35 2 (2007) 235-244
-
(2007)
Operations Research Letters
, vol.35
, Issue.2
, pp. 235-244
-
-
Ben-Zvi, T.1
Grosfeld-Nir, A.2
-
5
-
-
1642461394
-
Multi-objective lot splitting for a single product m-machine flowshop line
-
Bukchin J., and Masin M. Multi-objective lot splitting for a single product m-machine flowshop line. IIE Transactions 36 2 (2004) 191-202
-
(2004)
IIE Transactions
, vol.36
, Issue.2
, pp. 191-202
-
-
Bukchin, J.1
Masin, M.2
-
6
-
-
0032655986
-
The structure of manufacturing systems: insights on the impact of variability
-
Buzacott J.A. The structure of manufacturing systems: insights on the impact of variability. The International Journal of Flexible Manufacturing Systems 11 2 (1999) 127-146
-
(1999)
The International Journal of Flexible Manufacturing Systems
, vol.11
, Issue.2
, pp. 127-146
-
-
Buzacott, J.A.1
-
8
-
-
0024733003
-
Lot sizes and setup frequency with learning and process quality
-
Chand S. Lot sizes and setup frequency with learning and process quality. European Journal of Operational Research 42 2 (1989) 190-202
-
(1989)
European Journal of Operational Research
, vol.42
, Issue.2
, pp. 190-202
-
-
Chand, S.1
-
11
-
-
0000516518
-
Adjusting replenishment orders to reflect learning in material requirements planning environment
-
Dolinsky L.R., Vollmann T.E., and Maggard M.J. Adjusting replenishment orders to reflect learning in material requirements planning environment. Management Science 36 12 (1990) 1532-1547
-
(1990)
Management Science
, vol.36
, Issue.12
, pp. 1532-1547
-
-
Dolinsky, L.R.1
Vollmann, T.E.2
Maggard, M.J.3
-
12
-
-
0031070040
-
Lot splitting decisions and learning effects
-
Eynan A., and Li C.L. Lot splitting decisions and learning effects. IIE Transactions 29 2 (1997) 139-146
-
(1997)
IIE Transactions
, vol.29
, Issue.2
, pp. 139-146
-
-
Eynan, A.1
Li, C.L.2
-
13
-
-
0036275691
-
Planning and control of rework in the process industries: a review
-
Flapper S.D.P., Fransoo J.C., Broekmeulen R.A.C.M., and Inderfurth K. Planning and control of rework in the process industries: a review. Production Planning & Control 13 1 (2002) 26-34
-
(2002)
Production Planning & Control
, vol.13
, Issue.1
, pp. 26-34
-
-
Flapper, S.D.P.1
Fransoo, J.C.2
Broekmeulen, R.A.C.M.3
Inderfurth, K.4
-
14
-
-
4043162890
-
Multiple lot sizing in production to order with random yields: review of recent advances
-
Grosfeld-Nir A., and Gerchak Y. Multiple lot sizing in production to order with random yields: review of recent advances. Annals of Operations Research 126 1-4 (2004) 43-69
-
(2004)
Annals of Operations Research
, vol.126
, Issue.1-4
, pp. 43-69
-
-
Grosfeld-Nir, A.1
Gerchak, Y.2
-
16
-
-
0028584051
-
Learning-by-doing spillovers in the semiconductor industry
-
Irwin D.A., and Klenow P.J. Learning-by-doing spillovers in the semiconductor industry. The Journal of Political Economy 102 6 (1994) 1200-1227
-
(1994)
The Journal of Political Economy
, vol.102
, Issue.6
, pp. 1200-1227
-
-
Irwin, D.A.1
Klenow, P.J.2
-
18
-
-
0037464632
-
Lot sizing with learning and forgetting in set-ups and in product quality
-
Jaber M.Y., and Bonney M. Lot sizing with learning and forgetting in set-ups and in product quality. International Journal of Production Economics 83 1 (2003) 95-111
-
(2003)
International Journal of Production Economics
, vol.83
, Issue.1
, pp. 95-111
-
-
Jaber, M.Y.1
Bonney, M.2
-
20
-
-
3342875819
-
Learning curves for processes generating defects requiring reworks
-
Jaber M.Y., and Guiffrida A.L. Learning curves for processes generating defects requiring reworks. European Journal of Operational Research 159 3 (2004) 663-672
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.3
, pp. 663-672
-
-
Jaber, M.Y.1
Guiffrida, A.L.2
-
21
-
-
33751189169
-
Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups
-
Jaber M.Y. Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups. Computers and Industrial Engineering 51 4 (2006) 781-790
-
(2006)
Computers and Industrial Engineering
, vol.51
, Issue.4
, pp. 781-790
-
-
Jaber, M.Y.1
-
22
-
-
38949106054
-
Learning and forgetting models and their applications
-
Badiru A.B. (Ed), CRC Press, Taylor & Francis Group, FL: Baco Raton
-
Jaber M.Y. Learning and forgetting models and their applications. In: Badiru A.B. (Ed). Handbook of Industrial and Systems Engineering (2006), CRC Press, Taylor & Francis Group, FL: Baco Raton 30.1-30.27
-
(2006)
Handbook of Industrial and Systems Engineering
-
-
Jaber, M.Y.1
-
23
-
-
38949110953
-
Learning curves for imperfect production processes with reworks and process restoration interruptions
-
Jaber M.Y., and Guiffrida A.L. Learning curves for imperfect production processes with reworks and process restoration interruptions. European Journal of Operational Research 189 1 (2008) 93-104
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.1
, pp. 93-104
-
-
Jaber, M.Y.1
Guiffrida, A.L.2
-
24
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
Jamal A.M.M., Sarker B.R., and Mondal S. Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering 47 1 (2004) 77-89
-
(2004)
Computers and Industrial Engineering
, vol.47
, Issue.1
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
25
-
-
56549083654
-
The single-period inventory problem: extension to random yield from the perspective of the supply chain
-
Keren B. The single-period inventory problem: extension to random yield from the perspective of the supply chain. Omega 37 4 (2009) 801-810
-
(2009)
Omega
, vol.37
, Issue.4
, pp. 801-810
-
-
Keren, B.1
-
26
-
-
33751185840
-
The use of minor setups within production cycles to improve product quality and yield
-
Khouja M. The use of minor setups within production cycles to improve product quality and yield. International Transactions in Operations Research 12 4 (2005) 403-416
-
(2005)
International Transactions in Operations Research
, vol.12
, Issue.4
, pp. 403-416
-
-
Khouja, M.1
-
27
-
-
0041862633
-
A JIT lot-splitting model for supply chain management: enhancing buyer-supplier linkage
-
Kim S.L., and Ha D. A JIT lot-splitting model for supply chain management: enhancing buyer-supplier linkage. International Journal of Production Economics 86 1 (2003) 1-10
-
(2003)
International Journal of Production Economics
, vol.86
, Issue.1
, pp. 1-10
-
-
Kim, S.L.1
Ha, D.2
-
28
-
-
0033716420
-
Behind the learning curve: linking learning activities to waste reduction
-
Lapré M.A., Mukherjee A.S., and Van Wassenhove L.N. Behind the learning curve: linking learning activities to waste reduction. Management Science 46 5 (2000) 597-611
-
(2000)
Management Science
, vol.46
, Issue.5
, pp. 597-611
-
-
Lapré, M.A.1
Mukherjee, A.S.2
Van Wassenhove, L.N.3
-
31
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 34 1 (1986) 137-144
-
(1986)
Operations Research
, vol.34
, Issue.1
, pp. 137-144
-
-
Porteus, E.L.1
-
32
-
-
34548565651
-
Optimal batch sizing in a multi-stage production system with rework consideration
-
Sarker B.R., Jamal A.M.M., and Mondal S. Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research 184 3 (2008) 915-929
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.1
Jamal, A.M.M.2
Mondal, S.3
-
33
-
-
0042204358
-
Lot splitting under learning effects with minimal revenue requirements and multiple lot types
-
Serin Y., and Kayaligil S. Lot splitting under learning effects with minimal revenue requirements and multiple lot types. IIE Transactions 35 8 (2003) 689-698
-
(2003)
IIE Transactions
, vol.35
, Issue.8
, pp. 689-698
-
-
Serin, Y.1
Kayaligil, S.2
-
35
-
-
0016572027
-
Manufacturing cycle time determination for a multi-stage economic production quantity model
-
Szendrovits A.Z. Manufacturing cycle time determination for a multi-stage economic production quantity model. Management Science 22 3 (1975) 298-308
-
(1975)
Management Science
, vol.22
, Issue.3
, pp. 298-308
-
-
Szendrovits, A.Z.1
-
36
-
-
0039078972
-
Optimizing multi-stage production with constant lot size and varying numbers of batches
-
Szendrovits A.Z., and Drezner Z. Optimizing multi-stage production with constant lot size and varying numbers of batches. Omega 8 6 (1980) 623-629
-
(1980)
Omega
, vol.8
, Issue.6
, pp. 623-629
-
-
Szendrovits, A.Z.1
Drezner, Z.2
-
38
-
-
0001068236
-
Random yield, rework and scrap in a multistage batch manufacturing environment
-
Wein A.S. Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research 40 3 (1992) 551-563
-
(1992)
Operations Research
, vol.40
, Issue.3
, pp. 551-563
-
-
Wein, A.S.1
-
39
-
-
0001250106
-
Factors affecting the cost of airplanes
-
Wright T. Factors affecting the cost of airplanes. Journal of Aeronautical Science 3 4 (1936) 122-128
-
(1936)
Journal of Aeronautical Science
, vol.3
, Issue.4
, pp. 122-128
-
-
Wright, T.1
-
40
-
-
0029369736
-
Effect of rework strategies on cycle time
-
Zargar A.M. Effect of rework strategies on cycle time. Computers and Industrial Engineering 29 1 (1995) 239-243
-
(1995)
Computers and Industrial Engineering
, vol.29
, Issue.1
, pp. 239-243
-
-
Zargar, A.M.1
|