메뉴 건너뛰기




Volumn 46, Issue 5-8, 2010, Pages 707-714

Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times

Author keywords

Deteriorating jobs; Learning effect; Scheduling; Setup times; Single machine

Indexed keywords

DETERIORATING JOBS; LEARNING EFFECT; LEARNING EFFECTS; SET-UP TIME; SINGLE MACHINES;

EID: 74249089155     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-009-2116-6     Document Type: Article
Times cited : (26)

References (24)
  • 2
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • 1054.90542 10.1057/palgrave.jors.2600740
    • B Alidaee NK Womer 1999 Scheduling with time dependent processing times: review and extensions J Oper Res Soc 50 711 720 1054.90542 10.1057/palgrave. jors.2600740
    • (1999) J Oper Res Soc , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 3
    • 0141859880 scopus 로고    scopus 로고
    • A concise survey of scheduling with time-dependent processing times
    • 1030.90023 10.1016/S0377-2217(02)00909-8 2004434
    • TCE Cheng Q Ding BMT Lin 2004 A concise survey of scheduling with time-dependent processing times Eur J Oper Res 152 1 13 1030.90023 10.1016/S0377-2217(02)00909-8 2004434
    • (2004) Eur J Oper Res , vol.152 , pp. 1-13
    • Cheng, T.C.E.1    Ding, Q.2    Lin, B.M.T.3
  • 4
    • 38149027740 scopus 로고    scopus 로고
    • A state-of-the-art review on scheduling with learning effects
    • 1129.90022 10.1016/j.ejor.2007.05.040 2384086
    • D Biskup 2008 A state-of-the-art review on scheduling with learning effects Eur J Oper Res 188 315 329 1129.90022 10.1016/j.ejor.2007.05.040 2384086
    • (2008) Eur J Oper Res , vol.188 , pp. 315-329
    • Biskup, D.1
  • 5
    • 34547803718 scopus 로고    scopus 로고
    • Minimizing the total weighted completion time on a single machine under linear deterioration
    • DOI 10.1007/s00170-006-0565-8
    • C-C Wu W-C Lee Y-R Shiau 2007 Minimizing the total weighted completion time on a single machine under linear deterioration Int J Adv Manuf Technol 33 1237 1243 10.1007/s00170-006-0565-8 (Pubitemid 47234243)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.11-12 , pp. 1237-1243
    • Wu, C.-C.1    Lee, W.-C.2    Shiau, Y.-R.3
  • 7
    • 45749118684 scopus 로고    scopus 로고
    • A bicriteria scheduling with a learning effect: Total completion time and total tardiness
    • 10.3138/infor.45.2.75 2424067
    • T Eren E Guner 2007 A bicriteria scheduling with a learning effect: total completion time and total tardiness INFOR, Inf Syst Oper Res 45 75 81 10.3138/infor.45.2.75 2424067
    • (2007) INFOR, Inf Syst Oper Res , vol.45 , pp. 75-81
    • Eren, T.1    Guner, E.2
  • 8
    • 33846579161 scopus 로고    scopus 로고
    • Minimizing total tardiness in a scheduling problem with a learning effect
    • DOI 10.1016/j.apm.2006.03.030, PII S0307904X06001028
    • T Eren E Guner 2007 Minimizing total tardiness in a scheduling problem with a learning effect Appl Math Model 31 1351 1361 1145.90021 10.1016/j.apm.2006.03.030 (Pubitemid 46172809)
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.7 , pp. 1351-1361
    • Eren, T.1    Guner, E.2
  • 9
    • 49649118743 scopus 로고    scopus 로고
    • Minimizing the earliness/ tardiness costs on parallel machine with learning effects and deteriorating jobs: A mixed nonlinear integer programming approach
    • 10.1007/s00170-007-1128-3 10.1007/s00170-007-1128-3
    • MD Toksar E Guner 2008 Minimizing the earliness/ tardiness costs on parallel machine with learning effects and deteriorating jobs: a mixed nonlinear integer programming approach Int J Adv Manuf Technol. 38 801 808 10.1007/s00170-007-1128-3 10.1007/s00170-007-1128-3
    • (2008) Int J Adv Manuf Technol. , vol.38 , pp. 801-808
    • Toksar, M.D.1    Guner, E.2
  • 10
    • 54049131297 scopus 로고    scopus 로고
    • A bicriteria parallel machine scheduling with a learning effect of setup and removal times
    • 10.1016/j.apm.2008.01.010 1168.90436 10.1016/j.apm.2008.01.010 2468511
    • T Eren 2009 A bicriteria parallel machine scheduling with a learning effect of setup and removal times Appl Math Model 33 1141 1150 10.1016/j.apm.2008.01.010 1168.90436 10.1016/j.apm.2008.01.010 2468511
    • (2009) Appl Math Model , vol.33 , pp. 1141-1150
    • Eren, T.1
  • 11
    • 41449089275 scopus 로고    scopus 로고
    • Some scheduling problems with deteriorating jobs and learning effects
    • 10.1016/j.cie.2007.11.006
    • TCE Cheng C-C Wu W-C Lee 2008 Some scheduling problems with deteriorating jobs and learning effects Comput Ind Eng 54 972 982 10.1016/j.cie.2007.11.006
    • (2008) Comput Ind Eng , vol.54 , pp. 972-982
    • Cheng, T.C.E.1    Wu, C.-C.2    Lee, W.-C.3
  • 12
    • 40849111346 scopus 로고    scopus 로고
    • Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects
    • 1172.90397 10.1016/j.ins.2008.02.002 2416993
    • TCE Cheng CC Wu W-C Lee 2008 Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects Inf Sci 178 11 2476 2487 1172.90397 10.1016/j.ins.2008.02.002 2416993
    • (2008) Inf Sci , vol.178 , Issue.11 , pp. 2476-2487
    • Cheng, T.C.E.1    Wu, C.C.2    Lee, W.-C.3
  • 13
    • 56749181441 scopus 로고    scopus 로고
    • Single-machine group scheduling problems with deteriorating jobs
    • 10.1007/s00170-007-1255-x
    • J-B Wang L Lin F Shan 2008 Single-machine group scheduling problems with deteriorating jobs Int J Adv Manuf Technol 39 808 812 10.1007/s00170-007-1255-x
    • (2008) Int J Adv Manuf Technol , vol.39 , pp. 808-812
    • Wang, J.-B.1    Lin, L.2    Shan, F.3
  • 14
    • 60749100763 scopus 로고    scopus 로고
    • A bicriteria parallel machine scheduling with a learning effect
    • 10.1007/s00170-008-1436-2
    • T Eren E Guner 2009 A bicriteria parallel machine scheduling with a learning effect Int J Adv Manuf Technol 40 1202 1205 10.1007/s00170-008-1436-2
    • (2009) Int J Adv Manuf Technol , vol.40 , pp. 1202-1205
    • Eren, T.1    Guner, E.2
  • 15
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • 10.1016/S0305-0483(98)00042-5
    • A Allahverdi JND Gupta T Aldowaisan 1999 A review of scheduling research involving setup considerations Omega 27 219 239 10.1016/S0305-0483(98)00042-5
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 16
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
    • A Allahverdi CT Ng TCE Cheng MY Kovalyov 2008 A survey of scheduling problems with setup times or costs Eur J Oper Res 187 985 1032 1137.90474 10.1016/j.ejor.2006.06.060 2378326 (Pubitemid 350236619)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.T.2    Cheng, T.C.E.3    Kovalyov, M.Y.4
  • 17
    • 36849022486 scopus 로고    scopus 로고
    • Single-machine scheduling problems with past-sequence-dependent setup times
    • C Koulamas GJ Kyparisis 2008 Single-machine scheduling problems with past-sequence-dependent setup times Eur J Oper Res 187 68 72
    • (2008) Eur J Oper Res , vol.187 , pp. 68-72
    • Koulamas, C.1    Kyparisis, G.J.2
  • 18
    • 33846631348 scopus 로고    scopus 로고
    • Single machine scheduling with past-sequence-dependent setup times and learning effects
    • DOI 10.1016/j.ipl.2006.11.002, PII S0020019006003176
    • W-H Kuo D-L Yang 2007 Single-machine scheduling with past-sequence- dependent setup and learning effects Inf Process Lett 102 22 26 10.1016/j.ipl.2006.11.002 2294778 (Pubitemid 46186360)
    • (2007) Information Processing Letters , vol.102 , Issue.1 , pp. 22-26
    • Kuo, W.-H.1    Yang, D.-L.2
  • 19
    • 53049086739 scopus 로고    scopus 로고
    • Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect
    • 10.1016/j.cie.2008.01.017
    • J-B Wang 2008 Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect Comput Ind Eng 55 584 591 10.1016/j.cie.2008.01.017
    • (2008) Comput Ind Eng , vol.55 , pp. 584-591
    • Wang, J.-B.1
  • 20
    • 57349083985 scopus 로고    scopus 로고
    • Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times
    • 1165.90471 10.1016/j.camwa.2008.09.025 2484250
    • J-B Wang D Wang L-Y Wang L Lin N Yin W-W Wang 2009 Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times Comput Math Appl 57 9 16 1165.90471 10.1016/j.camwa.2008.09.025 2484250
    • (2009) Comput Math Appl , vol.57 , pp. 9-16
    • Wang, J.-B.1    Wang, D.2    Wang, L.-Y.3    Lin, L.4    Yin, N.5    Wang, W.-W.6
  • 21
    • 63449134462 scopus 로고    scopus 로고
    • Single machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning
    • 10.1007/s00170-008-1512-7
    • J-B Wang Y Jiang G Wang 2009 Single machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning Int J Adv Manuf Technol 41 1221 1226 10.1007/s00170-008-1512-7
    • (2009) Int J Adv Manuf Technol , vol.41 , pp. 1221-1226
    • Wang, J.-B.1    Jiang, Y.2    Wang, G.3
  • 22
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • 0411.90044 10.1016/S0167-5060(08)70356-X 558574
    • RL Graham EL Lawler JK Lenstra AHG Rinnooy Kan 1979 Optimization and approximation in deterministic sequencing and scheduling: a survey Ann Discrete Math 5 287 326 0411.90044 10.1016/S0167-5060(08)70356-X 558574
    • (1979) Ann Discrete Math , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 23
    • 0017921371 scopus 로고
    • The single machine problem with quadratic penalty function of completion times: A branch-and-bound solution
    • 0371.90065 10.1287/mnsc.24.5.530
    • W Townsend 1978 The single machine problem with quadratic penalty function of completion times: a branch-and-bound solution Manage Sci 24 530 534 0371.90065 10.1287/mnsc.24.5.530
    • (1978) Manage Sci , vol.24 , pp. 530-534
    • Townsend, W.1
  • 24
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimizing the number of late jobs
    • 0164.20002 10.1287/mnsc.15.1.102
    • J Moore 1968 An n job, one machine sequencing algorithm for minimizing the number of late jobs Manage Sci 15 102 109 0164.20002 10.1287/mnsc.15.1.102
    • (1968) Manage Sci , vol.15 , pp. 102-109
    • Moore, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.