-
1
-
-
0031234631
-
Heuristics for scheduling in a flowshop with setup and processing and removal times separated
-
Rajendran C., and Ziegler H. Heuristics for scheduling in a flowshop with setup and processing and removal times separated. Production Planning & Control 8 6 (1997) 568-576
-
(1997)
Production Planning & Control
, vol.8
, Issue.6
, pp. 568-576
-
-
Rajendran, C.1
Ziegler, H.2
-
2
-
-
54049087426
-
Setup and removal times with learning effect in single machine scheduling problems
-
(in Turkish)
-
Eren T., and Güner E. Setup and removal times with learning effect in single machine scheduling problems. Trakya University Journal of Science 8 1 (2007) 07-13 (in Turkish)
-
(2007)
Trakya University Journal of Science
, vol.8
, Issue.1
, pp. 07-13
-
-
Eren, T.1
Güner, E.2
-
4
-
-
0345201636
-
Single machine scheduling with learning considerations
-
Biskup D. Single machine scheduling with learning considerations. European Journal of Operational Research 115 (1999) 173-178
-
(1999)
European Journal of Operational Research
, vol.115
, pp. 173-178
-
-
Biskup, D.1
-
8
-
-
33846579161
-
Minimizing total tardiness in a scheduling problem with a learning effect
-
Eren T., and Güner E. Minimizing total tardiness in a scheduling problem with a learning effect. Applied Mathematical Modelling 31 7 (2007) 1351-1361
-
(2007)
Applied Mathematical Modelling
, vol.31
, Issue.7
, pp. 1351-1361
-
-
Eren, T.1
Güner, E.2
-
9
-
-
21144435406
-
A bi-criterion single-machine scheduling problem with learning considerations
-
Lee W.-C., Wu C.-C., and Sung H.-J. A bi-criterion single-machine scheduling problem with learning considerations. Acta Informatica 40 (2004) 303-315
-
(2004)
Acta Informatica
, vol.40
, pp. 303-315
-
-
Lee, W.-C.1
Wu, C.-C.2
Sung, H.-J.3
-
10
-
-
54049117238
-
-
T. Eren, E. Güner, A bicriteria scheduling with a learning effect: total completion time and total tardiness, Infor, accepted for publication.
-
T. Eren, E. Güner, A bicriteria scheduling with a learning effect: total completion time and total tardiness, Infor, accepted for publication.
-
-
-
-
11
-
-
0034563358
-
Single machine scheduling with learning effect considerations
-
Cheng T.C.E., and Wang G. Single machine scheduling with learning effect considerations. Annals of Operations Research 98 (2000) 273-290
-
(2000)
Annals of Operations Research
, vol.98
, pp. 273-290
-
-
Cheng, T.C.E.1
Wang, G.2
-
12
-
-
28244442171
-
Minimizing the makespan in a single machine scheduling problem with a time-based learning effect
-
Kuo W.-H., and Yang D.-L. Minimizing the makespan in a single machine scheduling problem with a time-based learning effect. Information Processing Letters 97 (2006) 64-67
-
(2006)
Information Processing Letters
, vol.97
, pp. 64-67
-
-
Kuo, W.-H.1
Yang, D.-L.2
-
13
-
-
33744731083
-
A note on deteriorating jobs and learning in single-machine scheduling problems
-
Lee W.-C. A note on deteriorating jobs and learning in single-machine scheduling problems. International Journal of Business and Economics 3 (2004) 83-89
-
(2004)
International Journal of Business and Economics
, vol.3
, pp. 83-89
-
-
Lee, W.-C.1
-
14
-
-
3343007213
-
Common due date scheduling with autonomous and induced learning
-
Biskup D., and Simons D. Common due date scheduling with autonomous and induced learning. European Journal of Operational Research 159 (2004) 606-616
-
(2004)
European Journal of Operational Research
, vol.159
, pp. 606-616
-
-
Biskup, D.1
Simons, D.2
-
15
-
-
12144249183
-
Note on scheduling with general learning curves to minimize the number of tardy jobs
-
Mosheiov G., and Sidney J.B. Note on scheduling with general learning curves to minimize the number of tardy jobs. Journal of the Operational Research Society 56 (2005) 110-112
-
(2005)
Journal of the Operational Research Society
, vol.56
, pp. 110-112
-
-
Mosheiov, G.1
Sidney, J.B.2
-
16
-
-
33846616884
-
Flowshop scheduling with general job-dependent learning effect, K.H.O
-
In Turkish
-
Eren T., and Güner E. Flowshop scheduling with general job-dependent learning effect, K.H.O. Journal of Defense Science 2 (2003) 1-11 In Turkish
-
(2003)
Journal of Defense Science
, vol.2
, pp. 1-11
-
-
Eren, T.1
Güner, E.2
-
17
-
-
0742284281
-
Minimizing total completion time in a two-machine flowshop with a learning effect
-
Lee W.-C., and Wu C.-C. Minimizing total completion time in a two-machine flowshop with a learning effect. International Journal of Production Economics 88 (2004) 85-93
-
(2004)
International Journal of Production Economics
, vol.88
, pp. 85-93
-
-
Lee, W.-C.1
Wu, C.-C.2
-
19
-
-
43949118118
-
A bicriteria flowshop scheduling with a learning effect
-
Eren T., and Güner E. A bicriteria flowshop scheduling with a learning effect. Applied Mathematical Modelling 32 (2007) 1719-1733
-
(2007)
Applied Mathematical Modelling
, vol.32
, pp. 1719-1733
-
-
Eren, T.1
Güner, E.2
-
21
-
-
0000474126
-
Minimizing total tardiness on one machine is NP-hard
-
Du J., and Leung J.Y.T. Minimizing total tardiness on one machine is NP-hard. Mathematics of Operations Research 15 (1990) 483-495
-
(1990)
Mathematics of Operations Research
, vol.15
, pp. 483-495
-
-
Du, J.1
Leung, J.Y.T.2
-
22
-
-
0142246404
-
Minimizing of maximum lateness under linear deterioration
-
Hsu Y.S., and Lin B.N.T. Minimizing of maximum lateness under linear deterioration. Omega 31 (2003) 459-469
-
(2003)
Omega
, vol.31
, pp. 459-469
-
-
Hsu, Y.S.1
Lin, B.N.T.2
-
23
-
-
33747373886
-
A bicriteria scheduling with sequence-dependent setup times
-
Eren T., and Güner E. A bicriteria scheduling with sequence-dependent setup times. Applied Mathematics and Computation 179 1 (2006) 378-385
-
(2006)
Applied Mathematics and Computation
, vol.179
, Issue.1
, pp. 378-385
-
-
Eren, T.1
Güner, E.2
-
24
-
-
33845804392
-
A bicriteria flowshop scheduling problem with setup times
-
Eren T., and Güner E. A bicriteria flowshop scheduling problem with setup times. Applied Mathematics and Computation 183 2 (2006) 1292-1300
-
(2006)
Applied Mathematics and Computation
, vol.183
, Issue.2
, pp. 1292-1300
-
-
Eren, T.1
Güner, E.2
-
26
-
-
33847250382
-
A multicriteria flowshop scheduling problem with setup times
-
Eren T. A multicriteria flowshop scheduling problem with setup times. Journal of Materials Processing Technology 186 1-3 (2007) 60-65
-
(2007)
Journal of Materials Processing Technology
, vol.186
, Issue.1-3
, pp. 60-65
-
-
Eren, T.1
-
27
-
-
54049141329
-
-
http://www.kku.edu.tr/akademik/goster.php?sicilno=0816.
-
http://www.kku.edu.tr/akademik/goster.php?sicilno=0816.
-
-
-
|