-
1
-
-
33746137834
-
Supply chain scheduling: Sequence coordination
-
DOI 10.1016/j.dam.2005.04.019, PII S0166218X06000473
-
A. Agnetis N. G. Hall D. Pacciarelli 2006 Supply chain scheduling: sequence coordination Discrete Applied Mathematics 154 15 2044 2063 10.1016/j.dam.2005.04.019 (Pubitemid 44188924)
-
(2006)
Discrete Applied Mathematics
, vol.154
, Issue.15
, pp. 2044-2063
-
-
Agnetis, A.1
Hall, N.G.2
Pacciarelli, D.3
-
2
-
-
6344293637
-
Strategic tactical and operational production-distribution models: A review
-
10.1504/IJTM.2004.005059
-
B. Bilgen I. Ozkarahan 2004 Strategic tactical and operational production-distribution models: a review International Journal of Technology Management 28 2 151 171 10.1504/IJTM.2004.005059
-
(2004)
International Journal of Technology Management
, vol.28
, Issue.2
, pp. 151-171
-
-
Bilgen, B.1
Ozkarahan, I.2
-
3
-
-
0029736136
-
Single machine batch scheduling to minimize the weighted number of late jobs
-
10.1007/BF01303431
-
P. Brucker M. Y. Kovalyov 1996 Single machine batch scheduling to minimize the weighted number of late jobs Mathematical Methods of Operations Research 43 1 8 10.1007/BF01303431
-
(1996)
Mathematical Methods of Operations Research
, vol.43
, pp. 1-8
-
-
Brucker, P.1
Kovalyov, M.Y.2
-
4
-
-
64749096784
-
Integrated production and outbound distribution scheduling: Review and extensions
-
to appear
-
Chen, Z.-L. (2008, to appear). Integrated production and outbound distribution scheduling: review and extensions. Operations Research.
-
(2008)
Operations Research
-
-
Chen, Z.-L.1
-
5
-
-
38549131389
-
Supply chain scheduling: Conflict and cooperation in assembly systems
-
DOI 10.1287/opre.1070.0412
-
Z.-L. Chen N. G. Hall 2007 Supply chain scheduling: conflict and cooperation in assembly systems Operations Research 55 1072 1089 10.1287/opre.1070.0412 (Pubitemid 351159518)
-
(2007)
Operations Research
, vol.55
, Issue.6
, pp. 1072-1089
-
-
Chen, Z.-L.1
Hall, N.G.2
-
6
-
-
22544461035
-
Integrated scheduling of production and distribution operations
-
DOI 10.1287/mnsc.1040.0325
-
Z.-L. Chen G. L. Vairaktarakis 2005 Integrated scheduling of production and distribution operations Management Science 51 614 628 10.1287/mnsc.1040.0325 (Pubitemid 41009656)
-
(2005)
Management Science
, vol.51
, Issue.4
, pp. 614-628
-
-
Chen, Z.-L.1
Vairaktarakis, G.L.2
-
8
-
-
0003811665
-
Discrete optimization problems and efficient approximate algorithms
-
G. V. Gens E. V. Levner 1979 Discrete optimization problems and efficient approximate algorithms Engineering Cybernetics 17 6 1 11
-
(1979)
Engineering Cybernetics
, vol.17
, Issue.6
, pp. 1-11
-
-
Gens, G.V.1
Levner, E.V.2
-
9
-
-
0019633768
-
FAST APPROXIMATION ALGORITHM FOR JOB SEQUENCING WITH DEADLINES.
-
DOI 10.1016/0166-218X(81)90008-1
-
G. V. Gens E. V. Levner 1981 Fast approximation algorithm for job sequencing with deadlines Discrete Applied Mathematics 3 4 313 318 10.1016/0166-218X(81)90008-1 (Pubitemid 12519970)
-
(1981)
Discrete Applied Mathematics
, vol.3
, Issue.4
, pp. 313-318
-
-
Gens, G.V.1
Levner, E.V.2
-
10
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
10.1016/S0167-5060(08)70356-X
-
R. L. Graham E. L. Lawler J. K. Lenstra A. H. G. Rinnooy Kan 1979 Optimization and approximation in deterministic sequencing and scheduling: a survey Annals of Discrete Mathematics 4 287 326 10.1016/S0167-5060(08)70356-X
-
(1979)
Annals of Discrete Mathematics
, vol.4
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
12
-
-
2342539189
-
Supply chain scheduling: Batching and delivery
-
10.1287/opre.51.4.566.16106
-
N. G. Hall C. N. Potts 2003 Supply chain scheduling: batching and delivery Operations Research 51 4 566 584 10.1287/opre.51.4.566.16106
-
(2003)
Operations Research
, vol.51
, Issue.4
, pp. 566-584
-
-
Hall, N.G.1
Potts, C.N.2
-
13
-
-
24144473403
-
The coordination of scheduling and batch deliveries
-
DOI 10.1007/s10479-005-6234-8
-
N. G. Hall C. N. Potts 2005 The coordination of scheduling and batch deliveries Annals of Operations Research 135 41 64 10.1007/s10479-005-6234-8 (Pubitemid 41227401)
-
(2005)
Annals of Operations Research
, vol.135
, Issue.1
, pp. 41-64
-
-
Hall, N.G.1
Potts, C.N.2
-
14
-
-
0002241669
-
Scheduling with batching: Minimizing the weighted number of tardy jobs
-
10.1016/0167-6377(94)90063-9
-
D. S. Hochbaum D. Landy 1994 Scheduling with batching: minimizing the weighted number of tardy jobs Operations Research Letters 16 79 86 10.1016/0167-6377(94)90063-9
-
(1994)
Operations Research Letters
, vol.16
, pp. 79-86
-
-
Hochbaum, D.S.1
Landy, D.2
-
15
-
-
0003037529
-
Reducibility among combinatorial problem
-
R. E. Miller J. W. Thatcher (eds). Plenum New York
-
Karp, R. M. (1972). Reducibility among combinatorial problem. In R. E. Miller & J. W. Thatcher (Eds.), Complexity of computer computations (pp. 85-103). New York: Plenum.
-
(1972)
Complexity of Computer Computations
, pp. 85-103
-
-
Karp, R.M.1
-
16
-
-
0344427189
-
Machine scheduling with transportation considerations
-
DOI 10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO;2-D
-
C. Y. Lee Z. L. Chen 2001 Machine scheduling with transportation considerations Journal of Scheduling 4 3 24 10.1002/1099-1425(200101/02)4: 1<3::AID-JOS57>3.0.CO;2-D (Pubitemid 33687419)
-
(2001)
Journal of Scheduling
, vol.4
, Issue.1
, pp. 3-24
-
-
Lee, C.-Y.1
Chen, Z.-L.2
-
17
-
-
10444261222
-
Machine scheduling with deliveries to multiple customer locations
-
10.1016/j.ejor.2003.11.022
-
C. L. Li G. Vairaktarakis C. Y. Lee 2005 Machine scheduling with deliveries to multiple customer locations European Journal of Operational Research 164 39 51 10.1016/j.ejor.2003.11.022
-
(2005)
European Journal of Operational Research
, vol.164
, pp. 39-51
-
-
Li, C.L.1
Vairaktarakis, G.2
Lee, C.Y.3
-
18
-
-
0000062028
-
An n job, one machine sequencing algorithm for minimizing the number of late jobs
-
10.1287/mnsc.15.1.102
-
J. M. Moore 1968 An n job, one machine sequencing algorithm for minimizing the number of late jobs Management Science 15 102 109 10.1287/mnsc.15.1.102
-
(1968)
Management Science
, vol.15
, pp. 102-109
-
-
Moore, J.M.1
-
19
-
-
26444509814
-
Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
-
DOI 10.1002/nav.20100
-
G. Pundoor Z.-L. Chen 2005 Scheduling a production-distribution system to optimize the tradeoff between tardiness and total distribution cost Naval Research Logistics 52 571 589 10.1002/nav.20100 (Pubitemid 41423772)
-
(2005)
Naval Research Logistics
, vol.52
, Issue.6
, pp. 571-589
-
-
Pundoor, G.1
Chen, Z.-L.2
-
20
-
-
0016883405
-
Algorithms for scheduling independent tasks
-
10.1145/321921.321934
-
S. K. Sahni 1976 Algorithms for scheduling independent tasks Journal of the ACM 23 1 116 127 10.1145/321921.321934
-
(1976)
Journal of the ACM
, vol.23
, Issue.1
, pp. 116-127
-
-
Sahni, S.K.1
-
21
-
-
33646094727
-
Batch scheduling in a two-level supply chain-a focus on the supplier
-
10.1016/j.ejor.2004.12.007
-
E. Selvarajah G. Steiner 2006 Batch scheduling in a two-level supply chain-a focus on the supplier European Journal of Operational Research 173 1 226 240 10.1016/j.ejor.2004.12.007
-
(2006)
European Journal of Operational Research
, vol.173
, Issue.1
, pp. 226-240
-
-
Selvarajah, E.1
Steiner, G.2
-
23
-
-
65349167861
-
Approximation algorithms for the supplier's supply chain scheduling problem
-
10.1287/opre.1080.0622
-
E. Selvarajah G. Steiner 2009 Approximation algorithms for the supplier's supply chain scheduling problem Operations Research 10.1287/opre.1080.0622
-
(2009)
Operations Research
-
-
Selvarajah, E.1
Steiner, G.2
-
24
-
-
72249119738
-
Minimizing the total weighted number of late jobs with late deliveries in two-level supply chains
-
Paris, France, 28-31 August
-
Steiner, G., & Zhang, R. (2007a). Minimizing the total weighted number of late jobs with late deliveries in two-level supply chains. In Proceedings of the 3rd multidisciplinary international conference on scheduling: theory and application (pp. 447-454), Paris, France, 28-31 August.
-
(2007)
Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Application
, pp. 447-454
-
-
Steiner, G.1
Zhang, R.2
-
25
-
-
72249103636
-
Minimizing the weighted number of late jobs with batch setup times and delivery costs on a single machine
-
E. Levner (eds). I-Tech. Publ. Vienna
-
Steiner, G., & Zhang, R. (2007b). Minimizing the weighted number of late jobs with batch setup times and delivery costs on a single machine. In E. Levner (Ed.), Multiprocessor scheduling: theory and applications (pp. 85-98). Vienna: I-Tech. Publ.
-
(2007)
Multiprocessor Scheduling: Theory and Applications
, pp. 85-98
-
-
Steiner, G.1
Zhang, R.2
-
26
-
-
0041760308
-
Coordinated supply chain management
-
DOI 10.1016/0377-2217(96)00098-7, PII S0377221796000987
-
D. J. Thomas P. M. Griffin 1996 Coordinated supply chain management European Journal of Operations Research 94 1 15 10.1016/0377-2217(96)00098-7 (Pubitemid 126390424)
-
(1996)
European Journal of Operational Research
, vol.94
, Issue.1
, pp. 1-15
-
-
Thomas, D.J.1
Griffin, P.M.2
-
27
-
-
0020543858
-
A hybrid algorithm for simultaneous scheduling of production and distribution in multi-echelon structures
-
10.1287/mnsc.29.1.77
-
J. F. Williams 1981 A hybrid algorithm for simultaneous scheduling of production and distribution in multi-echelon structures Management Science 29 77 92 10.1287/mnsc.29.1.77
-
(1981)
Management Science
, vol.29
, pp. 77-92
-
-
Williams, J.F.1
|