메뉴 건너뛰기




Volumn 2, Issue , 2009, Pages 24-28

Disassembling analysis for the automotive products based on generalized CAD models

Author keywords

Automotive products; Disassembly planning; Generalized CAD model

Indexed keywords

AUTOMOTIVE PRODUCTS; CAD MODELS; DISASSEMBLY PLANNING; DISASSEMBLY SEQUENCE; GENERALIZED CAD MODEL; KEY FACTORS; LIFE CYCLE ENGINEERING DESIGNS; LIFE-CYCLE ASSESSMENTS; MAIN REDUCER; MECHANICAL PRODUCT; SYSTEMATIC RESEARCH; THEORETICAL FOUNDATIONS;

EID: 71049126520     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CSIE.2009.369     Document Type: Conference Paper
Times cited : (2)

References (26)
  • 8
    • 0026992581 scopus 로고
    • Design for assembly and disassembly
    • Boothroyd, G. and Althing, L.. Design for assembly and disassembly, Annals of CIRP 41(2),1992. pp.625-636.
    • (1992) Annals of CIRP , vol.41 , Issue.2 , pp. 625-636
    • Boothroyd, G.1    Althing, L.2
  • 9
    • 0042680629 scopus 로고
    • A time buffer method for multi-arm operational planning
    • S.Y. Nof ed, Elsevier Science, Amsterdam
    • Chang, C. A., Goldman, J. and Yeralan, S.. A time buffer method for multi-arm operational planning, in: S.Y. Nof (ed.), Robotics and Material Flow, Elsevier Science, Amsterdam, 1986. pp. 187-196.
    • (1986) Robotics and Material Flow , pp. 187-196
    • Chang, C.A.1    Goldman, J.2    Yeralan, S.3
  • 10
    • 0027666001 scopus 로고
    • Integration of neural network and rule-based systems for design and planning of mechanical assemblies
    • Chen, C. L. and Pao, Y. H.. Integration of neural network and rule-based systems for design and planning of mechanical assemblies, IEEE Trans. Systems Man Cybernet. 23(5),1993. pp.1359-1371.
    • (1993) IEEE Trans. Systems Man Cybernet , vol.23 , Issue.5 , pp. 1359-1371
    • Chen, C.L.1    Pao, Y.H.2
  • 11
    • 0023537240 scopus 로고    scopus 로고
    • Simplified generation of all mechanical assembly sequences, IEEE Robotics
    • Defazio, T. and Whitney, D.. Simplified generation of all mechanical assembly sequences, IEEE Robotics Automat. 3(6),1996. pp. 640-658.
    • (1996) Automat , vol.3 , Issue.6 , pp. 640-658
    • Defazio, T.1    Whitney, D.2
  • 12
    • 0032312540 scopus 로고    scopus 로고
    • Visual servoing and CAD-driven microassembly
    • Feddema, J. T. and Simon, R. W.. Visual servoing and CAD-driven microassembly, IEEE Robotics Automat. Mag. 5(4),1998. pp.18-24.
    • (1998) IEEE Robotics Automat. Mag , vol.5 , Issue.4 , pp. 18-24
    • Feddema, J.T.1    Simon, R.W.2
  • 13
    • 0023244534 scopus 로고
    • Knowledge-based economic analysis of manufacturing systems
    • Fisher, E. L. and Nof, S. Y.: 1987, Knowledge-based economic analysis of manufacturing systems, J. Manufacturing Systems 6(2),1987. pp.138-150.
    • (1987) J. Manufacturing Systems , vol.6 , Issue.2 , pp. 138-150
    • Fisher, E.L.1    Nof, S.Y.2
  • 14
    • 0040917844 scopus 로고
    • An expert system approach to the choice of design rules for automated assembly
    • M. M. Adreasen ed, IFS Publications, London
    • Hernani, J. T. and Scarr, A. J.. An expert system approach to the choice of design rules for automated assembly, in: M. M. Adreasen (ed.), Assembly Automation, IFS Publications, London, 1987. pp. 129-136.
    • (1987) Assembly Automation , pp. 129-136
    • Hernani, J.T.1    Scarr, A.J.2
  • 17
    • 0035707986 scopus 로고    scopus 로고
    • An Integrated Approach to Disassembly Planning and Demanufacturing Operation
    • Tang, Y., Zhou, M. C. and Caudill, R., "An Integrated Approach to Disassembly Planning and Demanufacturing Operation," IEEE Transaction on Robotics and Automation, 17,2001.pp.773-784.
    • (2001) IEEE Transaction on Robotics and Automation , vol.17 , pp. 773-784
    • Tang, Y.1    Zhou, M.C.2    Caudill, R.3
  • 20
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson, M.R. and Wang, M.H., "Planning product disassembly for material recovery opportunities", International Journal of Production Research, Vol. 33, No. 11, 1995.pp.3119-3141
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3119-3141
    • Johnson, M.R.1    Wang, M.H.2
  • 21
    • 84947652551 scopus 로고
    • Assembly/Disassembly sequence planning
    • Yokota, K. and Brough, D.R., "Assembly/Disassembly sequence planning", Assembly Automation, Vol. 12, No.3, 1992.pp.31-38
    • (1992) Assembly Automation , vol.12 , Issue.3 , pp. 31-38
    • Yokota, K.1    Brough, D.R.2
  • 22
    • 0029491572 scopus 로고
    • Disassembly Path Generation to verify the Assemblability of Mechanical Products
    • Arai, E., Uchiyama, N. and Igoshi, M., "Disassembly Path Generation to verify the Assemblability of Mechanical Products", JSME International Journal, Series C, Vol. 38, No. 4, 1995. pp.805-810
    • (1995) JSME International Journal, Series C , vol.38 , Issue.4 , pp. 805-810
    • Arai, E.1    Uchiyama, N.2    Igoshi, M.3
  • 23
    • 0027306693 scopus 로고
    • CAD system with product assembly/disassembly planning function
    • Arai, E. and Iwata, K., "CAD system with product assembly/disassembly planning function", Robotics and Computer-Integrated Manufacturing, Vol. 10, No. 1/2, 41-48, 1993.
    • (1993) Robotics and Computer-Integrated Manufacturing , vol.10 , Issue.1-2 , pp. 41-48
    • Arai, E.1    Iwata, K.2
  • 24
    • 0027850925 scopus 로고
    • Disassembly sequences for objects built from unit cubes
    • Beasley, D. and Martin, R.R., "Disassembly sequences for objects built from unit cubes", Computer-Aided Design, Vol.25, No. 12, 1993.pp.751-761
    • (1993) Computer-Aided Design , vol.25 , Issue.12 , pp. 751-761
    • Beasley, D.1    Martin, R.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.