메뉴 건너뛰기




Volumn 13, Issue 4, 2009, Pages 171-187

Scheduling trains on parallel lines with crossover points

Author keywords

Decomposition; Job shop; Metaheuristics; Train scheduling

Indexed keywords

DECOMPOSITION; JOB SHOP SCHEDULING; RAILROAD TRANSPORTATION;

EID: 71049126080     PISSN: 15472450     EISSN: 15472442     Source Type: Journal    
DOI: 10.1080/15472450903297608     Document Type: Article
Times cited : (13)

References (34)
  • 2
    • 0042205090 scopus 로고    scopus 로고
    • Using integer programming to solve the train platforming problem
    • Billionnet, A. (2003). Using integer programming to solve the train platforming problem. Transportation Science, 37(2), 213-222.
    • (2003) Transportation Science , vol.37 , Issue.2 , pp. 213-222
    • Billionnet, A.1
  • 5
    • 69249227506 scopus 로고    scopus 로고
    • Development of a disjunctive graph model and constructive algorithms for train scheduling
    • Burdett, R., and Kozan, E. (2009a). Development of a disjunctive graph model and constructive algorithms for train scheduling. European Journal of Operational Research, 200, 85-98.
    • (2009) European Journal of Operational Research , vol.200 , pp. 85-98
    • Burdett, R.1    Kozan, E.2
  • 6
    • 65849438839 scopus 로고    scopus 로고
    • Techniques for restricting multiple overtaking conflicts and performing compound moves when train scheduling
    • Burdett, R., and Kozan, E. (2009b). Techniques for restricting multiple overtaking conflicts and performing compound moves when train scheduling. Computers and Mathematical Modelling, 50, 314-328.
    • (2009) Computers and Mathematical Modelling , vol.50 , pp. 314-328
    • Burdett, R.1    Kozan, E.2
  • 7
    • 67651174323 scopus 로고    scopus 로고
    • Techniques for inserting additional trains to existing timetables
    • Burdett, R., and Kozan, E. (2009c). Techniques for inserting additional trains to existing timetables. Transportation Research B., 43, 821-836.
    • (2009) Transportation Research B , vol.43 , pp. 821-836
    • Burdett, R.1    Kozan, E.2
  • 8
    • 0028436769 scopus 로고
    • A fast heuristic for the train scheduling problem
    • Cai, X., and Goh, C. J. (1994). A fast heuristic for the train scheduling problem. Computers and Operations Research, 21(5), 499-510.
    • (1994) Computers and Operations Research , vol.21 , Issue.5 , pp. 499-510
    • Cai, X.1    Goh, C.J.2
  • 9
    • 0032070192 scopus 로고    scopus 로고
    • Greedy heuristics for rapid scheduling of trains on a single track
    • Cai, X., Goh, C. J., and Mees, A. I. (1998). Greedy heuristics for rapid scheduling of trains on a single track. IIE Transactions, 30, 481-493.
    • (1998) IIE Transactions , vol.30 , pp. 481-493
    • Cai, X.1    Goh, C.J.2    Mees, A.I.3
  • 10
    • 0028530808 scopus 로고
    • Amodel and strategy for train pathingwith choice of lines, platforms, and routes
    • Carey, M. (1994a).Amodel and strategy for train pathingwith choice of lines, platforms, and routes. Transportation Research Part B, 28(5), 333-353.
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 333-353
    • Carey, M.1
  • 11
    • 0028532251 scopus 로고
    • Extending a train pathing model from one-way to two-way track
    • Carey, M. (1994b). Extending a train pathing model from one-way to two-way track. Transportation Research Part B, 28(5), 395-400.
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 395-400
    • Carey, M.1
  • 12
    • 0037355373 scopus 로고    scopus 로고
    • Scheduling and platforming trains at busy complex stations
    • Carey, M., and Carville, S. (2003). Scheduling and platforming trains at busy complex stations. Transportation Research Part A, 37, 195-224.
    • (2003) Transportation Research Part A , vol.37 , pp. 195-224
    • Carey, M.1    Carville, S.2
  • 13
    • 33748683746 scopus 로고    scopus 로고
    • Scheduling trains on a network of busy complex stations
    • Carey, M., and Crawford, I. (2007). Scheduling trains on a network of busy complex stations. Transportation Research Part B, 41, 159-178.
    • (2007) Transportation Research Part B , vol.41 , pp. 159-178
    • Carey, M.1    Crawford, I.2
  • 16
    • 0032203702 scopus 로고    scopus 로고
    • A survey of optimisation models for train routing and scheduling
    • Cordeau, J. F., Toth, P., and Vigo, D. (1998). A survey of optimisation models for train routing and scheduling. Transportation Science, 32, 380-404.
    • (1998) Transportation Science , vol.32 , pp. 380-404
    • Cordeau, J.F.1    Toth, P.2    Vigo, D.3
  • 18
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • D'Ariano, A., Pacciarelli, D., and Pranzo, M. (2008). Assessment of flexible timetables in real-time traffic management of a railway bottleneck. Transportation Research Part C, 16, 232-245.
    • (2008) Transportation Research Part C , vol.16 , pp. 232-245
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 19
    • 30544435688 scopus 로고    scopus 로고
    • An exact solution procedure for determining the optimal dispatching times for complex rail networks
    • Dessouky, M., Lu, Q., Zhao, J., and Leachman, R. (2006). An exact solution procedure for determining the optimal dispatching times for complex rail networks. IIE Transactions, 38(2), 141-152.
    • (2006) IIE Transactions , vol.38 , Issue.2 , pp. 141-152
    • Dessouky, M.1    Lu, Q.2    Zhao, J.3    Leachman, R.4
  • 20
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • Dorfman,M. J., andMedanic, J. (2004). Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research Part B, 38, 81-98.
    • (2004) Transportation Research Part B , vol.38 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 21
    • 33748691351 scopus 로고    scopus 로고
    • Railway timetable stability analysis using maxplus system theory
    • Goverde, R. (2007). Railway timetable stability analysis using maxplus system theory. Transportation Research Part B, 41, 179-201.
    • (2007) Transportation Research Part B , vol.41 , pp. 179-201
    • Goverde, R.1
  • 23
    • 0031234257 scopus 로고    scopus 로고
    • Heuristic techniques for single line train scheduling
    • Higgins, A., Kozan, E., and Ferreira, L. (1997). Heuristic techniques for single line train scheduling. Journal of Heuristics, 3, 43-62.
    • (1997) Journal of Heuristics , vol.3 , pp. 43-62
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 24
    • 0043207353 scopus 로고    scopus 로고
    • A variable trip time model for cyclic railway timetabling
    • Kroon, L. G., and Peeters,W. P. (2003). A variable trip time model for cyclic railway timetabling. Transportation Science, 37(2), 198-212.
    • (2003) Transportation Science , vol.37 , Issue.2 , pp. 198-212
    • Kroon, L.G.1    Peetersw., P.2
  • 27
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • Mazzarello, M., and Ottaviani, E. (2007). A traffic management system for real-time traffic optimisation in railways. Transportation Research Part B, 41, 246-274.
    • (2007) Transportation Research Part B , vol.41 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 28
    • 0030412990 scopus 로고    scopus 로고
    • A constraint generation algorithm for the construction of periodic railway timetables
    • Odijk, M. A. (1996). A constraint generation algorithm for the construction of periodic railway timetables. Transportation Research, 30, 455-464.
    • (1996) Transportation Research , vol.30 , pp. 455-464
    • Odijk, M.A.1
  • 29
    • 33748695294 scopus 로고    scopus 로고
    • A constraint programming model for real time train scheduling at junctions
    • Rodriguez, J. (2007). A constraint programming model for real time train scheduling at junctions. Transportation Research Part B, 41, 231-245.
    • (2007) Transportation Research Part B , vol.41 , pp. 231-245
    • Rodriguez, J.1
  • 30
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on inter-train conflict management1
    • Sahin, I. (1999). Railway traffic control and train scheduling based on inter-train conflict management. Transportation Research Part B, 33, 511-534.
    • (1999) Transportation Research Part B , vol.33 , pp. 511-534
    • Sahin, I.1
  • 32
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic rescheduling during disturbances
    • Tornquist, J. and Persson, J. A. (2007). N-tracked railway traffic rescheduling during disturbances. Transportation Research Part B, 41, 342-362.
    • (2007) Transportation Research Part B , vol.41 , pp. 342-362
    • Tornquist, J.1    Persson, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.