메뉴 건너뛰기




Volumn 43, Issue 8-9, 2009, Pages 821-836

Techniques for inserting additional trains into existing timetables

Author keywords

Job shops; Meta heuristics; Time windows; Train scheduling

Indexed keywords

JOB SHOP SCHEDULING; OPTIMIZATION; PROBLEM SOLVING; RAILROADS; SCHEDULING;

EID: 67651174323     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2009.02.005     Document Type: Article
Times cited : (77)

References (25)
  • 1
    • 0242658501 scopus 로고    scopus 로고
    • Minimising the makespan for the flow shop scheduling problem with availability constraints
    • Aggoune R. Minimising the makespan for the flow shop scheduling problem with availability constraints. European Journal of Operational Research 153 3 (2004) 534-543
    • (2004) European Journal of Operational Research , vol.153 , Issue.3 , pp. 534-543
    • Aggoune, R.1
  • 2
    • 0037061463 scopus 로고    scopus 로고
    • A heuristic for job shop scheduling to minimize total weighted tardiness
    • Asano M., and Ohta H. A heuristic for job shop scheduling to minimize total weighted tardiness. Computers and Industrial Engineering 42 2-4 (2002) 137-147
    • (2002) Computers and Industrial Engineering , vol.42 , Issue.2-4 , pp. 137-147
    • Asano, M.1    Ohta, H.2
  • 3
    • 33646681684 scopus 로고    scopus 로고
    • Techniques for absolute capacity determination in railways
    • Burdett R., and Kozan E. Techniques for absolute capacity determination in railways. Transportation Research Part B 40 8 (2006) 616-632
    • (2006) Transportation Research Part B , vol.40 , Issue.8 , pp. 616-632
    • Burdett, R.1    Kozan, E.2
  • 4
    • 71149091242 scopus 로고    scopus 로고
    • A sequencing approach for train timetabling
    • 10.1007/s00291-008-0143-6
    • Burdett R., and Kozan E. A sequencing approach for train timetabling. OR Spectrum (2008) 10.1007/s00291-008-0143-6
    • (2008) OR Spectrum
    • Burdett, R.1    Kozan, E.2
  • 6
    • 0028530808 scopus 로고
    • A model and strategy for train pathing with choice of lines, platforms, and routes
    • Carey M. A model and strategy for train pathing with choice of lines, platforms, and routes. Transportation Research Part B 28 5 (1994) 333-353
    • (1994) Transportation Research Part B , vol.28 , Issue.5 , pp. 333-353
    • Carey, M.1
  • 7
    • 0037355373 scopus 로고    scopus 로고
    • Scheduling and platforming trains at busy complex stations
    • Carey M., and Carville S. Scheduling and platforming trains at busy complex stations. Transportation Research Part A 37 3 (2003) 195-224
    • (2003) Transportation Research Part A , vol.37 , Issue.3 , pp. 195-224
    • Carey, M.1    Carville, S.2
  • 8
    • 33748683746 scopus 로고    scopus 로고
    • Scheduling trains on a network of busy complex stations
    • Carey M., and Crawford I. Scheduling trains on a network of busy complex stations. Transportation Research Part B 41 2 (2007) 159-178
    • (2007) Transportation Research Part B , vol.41 , Issue.2 , pp. 159-178
    • Carey, M.1    Crawford, I.2
  • 10
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • D'Ariano A., Pacciarelli D., and Pranzo M. Assessment of flexible timetables in real-time traffic management of a railway bottleneck. Transportation Research Part C 16 2 (2008) 232-245
    • (2008) Transportation Research Part C , vol.16 , Issue.2 , pp. 232-245
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 11
    • 30544435688 scopus 로고    scopus 로고
    • An exact solution procedure for determining the optimal dispatching times for complex rail networks
    • Dessouky M., Lu Q., Zhao J., and Leachman R. An exact solution procedure for determining the optimal dispatching times for complex rail networks. IIE Transactions 38 2 (2006) 141-152
    • (2006) IIE Transactions , vol.38 , Issue.2 , pp. 141-152
    • Dessouky, M.1    Lu, Q.2    Zhao, J.3    Leachman, R.4
  • 12
    • 33748691351 scopus 로고    scopus 로고
    • Railway timetable stability analysis using max-plus system theory
    • Goverde R. Railway timetable stability analysis using max-plus system theory. Transportation Research Part B 41 2 (2007) 179-201
    • (2007) Transportation Research Part B , vol.41 , Issue.2 , pp. 179-201
    • Goverde, R.1
  • 13
    • 19744366708 scopus 로고    scopus 로고
    • Rescheduling for new orders
    • Hall N.G., and Potts C.N. Rescheduling for new orders. Operations Research 52 3 (2004) 440-453
    • (2004) Operations Research , vol.52 , Issue.3 , pp. 440-453
    • Hall, N.G.1    Potts, C.N.2
  • 14
    • 0010844051 scopus 로고    scopus 로고
    • An exchange heuristic imbedded with simulated annealing for due dates job shop scheduling
    • He Z., Yang T., and Tiger A. An exchange heuristic imbedded with simulated annealing for due dates job shop scheduling. European Journal of Operational Research 91 1 (1996) 99-117
    • (1996) European Journal of Operational Research , vol.91 , Issue.1 , pp. 99-117
    • He, Z.1    Yang, T.2    Tiger, A.3
  • 15
    • 33646466321 scopus 로고    scopus 로고
    • Efficient neighbourhood search for the one machine earliness-tardiness scheduling problem
    • Hendel Y., and Sourd F. Efficient neighbourhood search for the one machine earliness-tardiness scheduling problem. European Journal of Operational Research 173 1 (2006) 108-119
    • (2006) European Journal of Operational Research , vol.173 , Issue.1 , pp. 108-119
    • Hendel, Y.1    Sourd, F.2
  • 17
  • 18
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • Mazzarello M., and Ottaviani E. A traffic management system for real-time traffic optimisation in railways. Transportation Research Part B 41 2 (2007) 246-274
    • (2007) Transportation Research Part B , vol.41 , Issue.2 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 19
    • 33748695294 scopus 로고    scopus 로고
    • A constraint programming model for real time train scheduling at junctions
    • Rodriguez J. A constraint programming model for real time train scheduling at junctions. Transportation Research Part B 41 2 (2007) 231-245
    • (2007) Transportation Research Part B , vol.41 , Issue.2 , pp. 231-245
    • Rodriguez, J.1
  • 20
    • 0343963100 scopus 로고    scopus 로고
    • Scheduling with limited machine availability
    • Schmidt G. Scheduling with limited machine availability. European Journal of Operational Research 121 1 (2000) 1-15
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 1-15
    • Schmidt, G.1
  • 21
    • 13544272574 scopus 로고    scopus 로고
    • Punctuality and idleness in just in time scheduling
    • Sourd F. Punctuality and idleness in just in time scheduling. European Journal of Operational Research 167 3 (2005) 739-751
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 739-751
    • Sourd, F.1
  • 22
    • 12344252827 scopus 로고    scopus 로고
    • Optimal timing of a sequence of tasks with general completion costs
    • Sourd F. Optimal timing of a sequence of tasks with general completion costs. European Journal of Operational Research 165 1 (2005) 82-96
    • (2005) European Journal of Operational Research , vol.165 , Issue.1 , pp. 82-96
    • Sourd, F.1
  • 24
    • 26444441957 scopus 로고    scopus 로고
    • Hierarchical minimisation of completion time variance and makespan in jobshops
    • Viswanath K.G., Appa I.S., and Srinivasan G. Hierarchical minimisation of completion time variance and makespan in jobshops. Computers and Operations Research 33 5 (2006) 1345-1367
    • (2006) Computers and Operations Research , vol.33 , Issue.5 , pp. 1345-1367
    • Viswanath, K.G.1    Appa, I.S.2    Srinivasan, G.3
  • 25
    • 13544267417 scopus 로고    scopus 로고
    • Bicriteria train scheduling for high speed passenger railroad planning applications
    • Zhou X., and Zhong M. Bicriteria train scheduling for high speed passenger railroad planning applications. European Journal of Operational Research 167 3 (2005) 752-771
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 752-771
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.