1
-
-
33744773216
-
Multiobjective evolutionary algorithms for electric Power dispatch problems
-
M. A. Abido, " Multiobjective Evolutionary Algorithms for Electric Power Dispatch Problems, " IEEE trans for evolutionary computations, vol.10 (3), pp. 315-329, 2006.
-
(2006)
IEEE Trans for Evolutionary Computations
, vol.10
, Issue.3
, pp. 315-329
-
-
Abido, M.A.1
-
2
-
-
0002755938
-
Schedule optimization using genetic algorithms
-
L. Davis, ed. Van Nostrand Reinhold, New York, N.Y.
-
G. Syswerda, " Schedule optimization using genetic algorithms, " Handbook of genetic algorithms, L. Davis, ed., Van Nostrand Reinhold, New York, N.Y., 1991.
-
(1991)
Handbook of Genetic Algorithms
-
-
Syswerda, G.1
-
3
-
-
2042428623
-
Genetics and random keys for sequencing and optimization
-
An Arbor, Michigan
-
J. C. Bean, " Genetics and random keys for sequencing and optimization." Tech. Rep. 92-43, Univ. of Michigan, An Arbor, Michigan, 1992.
-
(1992)
Tech. Rep. 92-43, Univ. of Michigan
-
-
Bean, J.C.1
-
4
-
-
5244287531
-
Optimum resource allocation in construction projects using genetic algorithms
-
in, Edinburgh
-
K. Satyanarayana, S. Rajeev, S. Kalidindi, and V. Kalyanaraman, " Optimum resource allocation in construction projects using genetic algorithms, " in Proc. 3rd International Conference on the Application of AI to Civil and Structural Engineering, Edinburgh, 1993.
-
(1993)
Proc. 3rd International Conference on the Application of ai to Civil and Structural Engineering
-
-
Satyanarayana, K.1
Rajeev, S.2
Kalidindi, S.3
Kalyanaraman, V.4
-
5
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
H. Li, and P. Love, " Using improved genetic algorithms to facilitate time-cost optimization, " Journal of Construction Enginering and Management, vol. 123(3), pp. 233-237, 1997.
-
(1997)
Journal of Construction Enginering and Management
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
6
-
-
0032638332
-
Using machine tearning and ga to solve time-cost trade-off problems
-
H. Li, J.-N. Cao, and P.E. Love, " Using machine tearning and GA to solve time-cost trade-off problems, " Journal of Construction Enginering and Management, Vol 125(5), pp. 347-353. (1999).
-
(1999)
Journal of Construction Enginering and Management
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.-N.2
Love, P.E.3
-
7
-
-
0028368259
-
Genetic algorithms crossover operators for ordering applications, ", " ga-based multicriteria Model for construction scheduling
-
P. W. Poon, and J. N. Carter, " Genetic algorithms crossover operators for ordering applications, " Comp. Ops. Res., vol. 22(1), pp. 135-147, 1995.
-
(1999)
Journal of Construction Enginering and Management, , Comp. Ops. Res.
, vol.22
, Issue.6
, pp. 147
-
-
Poon, P.W.1
Carter, J.N.2
Leu, S.-S.3
Yang, C.-H.4
-
8
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
W.-T. Chan, D. K. Chua, and G. Kannan, " Construction resource scheduling with genetic algorithms, " Journal of Construction Enginering and Management, vol. 122(2), pp. 125-132, 1996.
-
(1996)
Journal of Construction Enginering and Management
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.-T.1
Chua, D.K.2
Kannan, G.3
-
9
-
-
0035612930
-
Project Scheduling with Multiple Modes: A Genetic Algorithm
-
DOI 10.1023/A:1010902015091
-
S. Hartmann, " Project Scheduling with Multiple Modes: A Genetic Algorithm" Annals of Operations Research, Vol. 112, pp. 111-135, 2001. (Pubitemid 33634389)
-
(2001)
Annals of Operations Research
, vol.102
, Issue.1-4
, pp. 111-135
-
-
Hartmann, S.1
-
10
-
-
33847753428
-
Two-dimensional encoding schema and genetic operators
-
article No. CIEF-177.
-
M-W. Tsai, T-P. Hong, and T-K. Liu, " Two-dimensional Encoding Schema and Genetic Operators, " Proceedings of the 9th joint conference on Information Sciences, JCIS 2006, article No. CIEF-177.
-
Proceedings of the 9th Joint Conference on Information Sciences, JCIS 2006
-
-
Tsai, M-W.1
Hong, T-P.2
Liu, T-K.3
-
11
-
-
15844369427
-
Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling
-
DOI 10.1016/S1568-4946(02)00065-0, PII S1568494602000650
-
K. W. Kim, M. Gen, and G. Yamazaki, "Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling, " Applied Soft Computing, 2/3F, pp. 174-188. (2003). (Pubitemid 40421585)
-
(2003)
Applied Soft Computing Journal
, vol.2
, Issue.3
, pp. 174-188
-
-
Kim, K.W.1
Gen, M.2
Yamazaki, G.3
-
12
-
-
33847297058
-
A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
-
S. Shadrokh, and F. Kianfar, " A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty, " European Journal of Operational research, 181, pp. 86-101, 2007.
-
(2007)
European Journal of Operational Research
, vol.181
, pp. 86-101
-
-
Shadrokh, S.1
Kianfar, F.2
-
13
-
-
0032188522
-
Acompetitive genetic algorithm for resourceconstrained project scheduling
-
Naval
-
S. Hartmann, " Acompetitive genetic algorithm for resourceconstrained project scheduling, " Naval Research Logistics, vol. 45, pp. 733-750, 1998.
-
(1998)
Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
14
-
-
33845784358
-
, " A genetic algorithm for resource investment problem with discounted Cash flows
-
A. A. Najafi, and S. T. Niaki, " A genetic algorithm for resource investment problem with discounted cash flows, " Applied Mathematics and Computation, 183, pp. 1057-1070, 2006.
-
(2006)
Applied Mathematics and Computation
, vol.183
, pp. 1057-1070
-
-
Najafi, A.A.1
Niaki, S.T.2
-
15
-
-
15944391749
-
Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
-
A. Elazouni, and F. Metwally, " Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms, " Journal of Construction Engineering and Management, vol. 131(4), pp. 400-412, 2005.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 400-412
-
-
Elazouni, A.1
Metwally, F.2
-
16
-
-
13944269539
-
Finance-based scheduling of construction projects using integer programming
-
A. Elazouni, and A. Gab-Allah, " Finance-based scheduling of construction projects using integer programming, " Journal of Construction Engineering and Management, vol. 130(1), pp. 15-24, 2004.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 15-24
-
-
Elazouni, A.1
Gab-Allah, A.2
-
17
-
-
0003977901
-
-
Lingo, Lindo Systems Inc. Chicago, Illinois, USA
-
Lingo, User's Guide. Lindo Systems Inc., Chicago, Illinois, USA, 2006.
-
(2006)
User's Guide
-
-
|