Improved crossover and mutation operators for genetic- algorithm project scheduling

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COSTS; CROSSOVER AND MUTATION; CROSSOVER OPERATOR; EXACT SOLUTION; MUTATION OPERATORS; OPTIMAL SOLUTIONS; PROJECT SCHEDULING; SCHEDULING PROBLEM;

EID: 70449922668     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CEC.2009.4983168     Document Type: Conference Paper
Times cited : (9)

References (17)
  • 1
    • 33744773216 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms for electric Power dispatch problems
    • M. A. Abido, " Multiobjective Evolutionary Algorithms for Electric Power Dispatch Problems, " IEEE trans for evolutionary computations, vol.10 (3), pp. 315-329, 2006.
    • (2006) IEEE Trans for Evolutionary Computations , vol.10 , Issue.3 , pp. 315-329
    • Abido, M.A.1
  • 2
    • 0002755938 scopus 로고
    • Schedule optimization using genetic algorithms
    • L. Davis, ed. Van Nostrand Reinhold, New York, N.Y.
    • G. Syswerda, " Schedule optimization using genetic algorithms, " Handbook of genetic algorithms, L. Davis, ed., Van Nostrand Reinhold, New York, N.Y., 1991.
    • (1991) Handbook of Genetic Algorithms
    • Syswerda, G.1
  • 3
    • 2042428623 scopus 로고
    • Genetics and random keys for sequencing and optimization
    • An Arbor, Michigan
    • J. C. Bean, " Genetics and random keys for sequencing and optimization." Tech. Rep. 92-43, Univ. of Michigan, An Arbor, Michigan, 1992.
    • (1992) Tech. Rep. 92-43, Univ. of Michigan
    • Bean, J.C.1
  • 5
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • H. Li, and P. Love, " Using improved genetic algorithms to facilitate time-cost optimization, " Journal of Construction Enginering and Management, vol. 123(3), pp. 233-237, 1997.
    • (1997) Journal of Construction Enginering and Management , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 6
    • 0032638332 scopus 로고    scopus 로고
    • Using machine tearning and ga to solve time-cost trade-off problems
    • H. Li, J.-N. Cao, and P.E. Love, " Using machine tearning and GA to solve time-cost trade-off problems, " Journal of Construction Enginering and Management, Vol 125(5), pp. 347-353. (1999).
    • (1999) Journal of Construction Enginering and Management , vol.125 , Issue.5 , pp. 347-353
    • Li, H.1    Cao, J.-N.2    Love, P.E.3
  • 9
    • 0035612930 scopus 로고    scopus 로고
    • Project Scheduling with Multiple Modes: A Genetic Algorithm
    • DOI 10.1023/A:1010902015091
    • S. Hartmann, " Project Scheduling with Multiple Modes: A Genetic Algorithm" Annals of Operations Research, Vol. 112, pp. 111-135, 2001. (Pubitemid 33634389)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 111-135
    • Hartmann, S.1
  • 11
    • 15844369427 scopus 로고    scopus 로고
    • Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling
    • DOI 10.1016/S1568-4946(02)00065-0, PII S1568494602000650
    • K. W. Kim, M. Gen, and G. Yamazaki, "Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling, " Applied Soft Computing, 2/3F, pp. 174-188. (2003). (Pubitemid 40421585)
    • (2003) Applied Soft Computing Journal , vol.2 , Issue.3 , pp. 174-188
    • Kim, K.W.1    Gen, M.2    Yamazaki, G.3
  • 12
    • 33847297058 scopus 로고    scopus 로고
    • A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
    • S. Shadrokh, and F. Kianfar, " A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty, " European Journal of Operational research, 181, pp. 86-101, 2007.
    • (2007) European Journal of Operational Research , vol.181 , pp. 86-101
    • Shadrokh, S.1    Kianfar, F.2
  • 13
    • 0032188522 scopus 로고    scopus 로고
    • Acompetitive genetic algorithm for resourceconstrained project scheduling
    • Naval
    • S. Hartmann, " Acompetitive genetic algorithm for resourceconstrained project scheduling, " Naval Research Logistics, vol. 45, pp. 733-750, 1998.
    • (1998) Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 14
    • 33845784358 scopus 로고    scopus 로고
    • , " A genetic algorithm for resource investment problem with discounted Cash flows
    • A. A. Najafi, and S. T. Niaki, " A genetic algorithm for resource investment problem with discounted cash flows, " Applied Mathematics and Computation, 183, pp. 1057-1070, 2006.
    • (2006) Applied Mathematics and Computation , vol.183 , pp. 1057-1070
    • Najafi, A.A.1    Niaki, S.T.2
  • 15
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • A. Elazouni, and F. Metwally, " Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms, " Journal of Construction Engineering and Management, vol. 131(4), pp. 400-412, 2005.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.1    Metwally, F.2
  • 16
    • 13944269539 scopus 로고    scopus 로고
    • Finance-based scheduling of construction projects using integer programming
    • A. Elazouni, and A. Gab-Allah, " Finance-based scheduling of construction projects using integer programming, " Journal of Construction Engineering and Management, vol. 130(1), pp. 15-24, 2004.
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 15-24
    • Elazouni, A.1    Gab-Allah, A.2
  • 17
    • 0003977901 scopus 로고    scopus 로고
    • Lingo, Lindo Systems Inc. Chicago, Illinois, USA
    • Lingo, User's Guide. Lindo Systems Inc., Chicago, Illinois, USA, 2006.
    • (2006) User's Guide


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.