메뉴 건너뛰기




Volumn , Issue , 2009, Pages 57-65

Profinet IO IRT message scheduling

Author keywords

[No Author keywords available]

Indexed keywords

COMMERCIAL TOOLS; COMMUNICATION CYCLE; COMPUTATIONAL TIME; END TO END DELAY; INDUSTRIAL ETHERNETS; MESSAGE SCHEDULING; PROFINET; RESOURCE CONSTRAINED PROJECT SCHEDULING; SCHEDULING PROBLEM; TEMPORAL CONSTRAINTS; TIME CONSTRAINTS; TIME SCHEDULES;

EID: 70449631615     PISSN: 10683070     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ECRTS.2009.18     Document Type: Conference Paper
Times cited : (29)

References (36)
  • 1
    • 0033339383 scopus 로고    scopus 로고
    • Real-time fieldbus communications using Profibus networks
    • DOI 10.1109/41.808018
    • E. Tovar and F. Vasques, "Real-time fieldbus communications using profibus networks," IEEE Transactions on Industrial Electronics, vol.Vol. 46, No.6, pp. pp. 1241-1251, 1999. (Pubitemid 30527862)
    • (1999) IEEE Transactions on Industrial Electronics , vol.46 , Issue.6 , pp. 1241-1251
    • Tovar, E.1    Vasques, F.2
  • 3
    • 67650220948 scopus 로고    scopus 로고
    • Composability in the time-triggered system-on-chip architecture
    • H. Kopetz, C. E. Salloum, B. Huber, R. Obermaisser, and C. Paukovits, "Composability in the time-triggered system-on-chip architecture," in SoCC, 2008, pp. 87-90.
    • (2008) SoCC , pp. 87-90
    • Kopetz, H.1    Salloum, C.E.2    Huber, B.3    Obermaisser, R.4    Paukovits, C.5
  • 4
    • 19644394449 scopus 로고    scopus 로고
    • Building models of real-time systems from application software
    • J. Sifakis, S. Tripakis, and S. Yovine, "Building models of real-time systems from application software," Proceedings of the IEEE, vol.91, no.1, pp. 100-111, 2003.
    • (2003) Proceedings of the IEEE , vol.91 , Issue.1 , pp. 100-111
    • Sifakis, J.1    Tripakis, S.2    Yovine, S.3
  • 5
    • 0141684229 scopus 로고    scopus 로고
    • The time-triggered architecture
    • H. Kopetz and G. Bauer, "The time-triggered architecture," Proceedings of the IEEE, vol.91, no.1, pp. 112-126, 2003.
    • (2003) Proceedings of the IEEE , vol.91 , Issue.1 , pp. 112-126
    • Kopetz, H.1    Bauer, G.2
  • 8
    • 40149112316 scopus 로고    scopus 로고
    • Timing analysis of the FlexRay communication protocol
    • T. Pop, P. Pop, P. Eles, Z. Peng, and A. Andrei, "Timing analysis of the FlexRay communication protocol," Real-Time Systems, vol.39, no.1-3, pp. 205-235, 2008.
    • (2008) Real-Time Systems , vol.39 , Issue.1-3 , pp. 205-235
    • Pop, T.1    Pop, P.2    Eles, P.3    Peng, Z.4    Andrei, A.5
  • 9
    • 21644475498 scopus 로고    scopus 로고
    • Real-time ethernet - Industry prospective
    • M. Felser, "Real-time ethernet - industry prospective," Proceedings of the IEEE, vol.93, 2005.
    • (2005) Proceedings of the IEEE , vol.93
    • Felser, M.1
  • 18
    • 70449634851 scopus 로고    scopus 로고
    • Simatic manager
    • Siemens
    • Siemens, "Simatic manager," Technical documentation, 2008.
    • (2008) Technical Documentation
  • 19
    • 24944471617 scopus 로고    scopus 로고
    • An extremely fast, exact algorithm for finding shortest paths in static networks with geographical background
    • U. Lauther, "An extremely fast, exact algorithm for finding shortest paths in static networks with geographical background," GI-Tage, vol.22, p. 219-230, 2004.
    • (2004) GI-Tage , vol.22 , pp. 219-230
    • Lauther, U.1
  • 24
  • 32
    • 0028413052 scopus 로고
    • A theory of timed automata
    • R. Alur and D. Dill, "A theory of timed automata," J. Theoret. Comput. Sci., vol.126, p. 183-235, 1994.
    • (1994) J. Theoret. Comput. Sci. , vol.126 , pp. 183-235
    • Alur, R.1    Dill, D.2
  • 33
    • 41549163260 scopus 로고    scopus 로고
    • Deadline constrained cyclic scheduling on pipelined dedicated processors considering multiprocessor tasks and changeover times
    • May, springer
    • P. š ůcha and Z. Hanzálek, "Deadline constrained cyclic scheduling on pipelined dedicated processors considering multiprocessor tasks and changeover times," Mathematical and Computer Modelling, vol.47, no.9-10, pp. 925-942, May 2008, springer.
    • (2008) Mathematical and Computer Modelling , vol.47 , Issue.9-10 , pp. 925-942
    • Ůcha, P.Š.1    Hanzálek, Z.2
  • 34
    • 0032042933 scopus 로고    scopus 로고
    • Resourceconstrained project scheduling : AA survey of recent developments
    • elsevier
    • W. Herroelen, B. D. Reyck, and E. Demeulemeester, " Resourceconstrained project scheduling : A survey of recent developments," Computers and operations research, vol.25, no.4, pp. 279-302, 1998, elsevier.
    • (1998) Computers and Operations Research , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    Reyck, B.D.2    Demeulemeester, E.3
  • 35
    • 0012442701 scopus 로고    scopus 로고
    • Truncated branch-andbound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling
    • B. Franck, K. Neumann, and C. Schwindt, "Truncated branch-andbound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling," OR Spektrum, vol.23, pp. 297-324, 2001.
    • (2001) OR Spektrum , vol.23 , pp. 297-324
    • Franck, B.1    Neumann, K.2    Schwindt, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.