메뉴 건너뛰기




Volumn , Issue , 2006, Pages 1796-1803

A simulation-ga based model for production planning in precast plant

Author keywords

[No Author keywords available]

Indexed keywords

BIOELECTRIC PHENOMENA; BISMUTH PLATING; GENETIC ALGORITHMS; HEURISTIC PROGRAMMING; INDUSTRIAL MANAGEMENT; PRODUCTION CONTROL; RESOURCE ALLOCATION;

EID: 46149093035     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2006.322957     Document Type: Conference Paper
Times cited : (15)

References (10)
  • 1
    • 0030151598 scopus 로고    scopus 로고
    • Integration of Machine Requirements Planning and Aggregate Production Planning
    • Behnezhad, A. R., and B. Khoshnevis. 1996, Integration of Machine Requirements Planning and Aggregate Production Planning, Production Planning and Control, Vol. 7, No. 3, pp. 292-298.
    • (1996) Production Planning and Control , vol.7 , Issue.3 , pp. 292-298
    • Behnezhad, A.R.1    Khoshnevis, B.2
  • 2
    • 0012234280 scopus 로고    scopus 로고
    • Production Scheduling for Precast Plants Using a Flow Shop Sequencing Model
    • Chan, W. T., and H. Hu. 2002. Production Scheduling for Precast Plants Using a Flow Shop Sequencing Model, Journal of Computing in Civil Engineering, Vol. 16. No. 3, pp. 165-174.
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.3 , pp. 165-174
    • Chan, W.T.1    Hu, H.2
  • 3
    • 0004809828 scopus 로고
    • An Integrated Knowledge-Based/Simulation Approach to Production Planning: An Application to the Precast Industry
    • Dawood, N. D. 1995. An Integrated Knowledge-Based/Simulation Approach to Production Planning: an Application to the Precast Industry, Construction Management and Economics, Vol. 13, No. 1, pp. 53-64.
    • (1995) Construction Management and Economics , vol.13 , Issue.1 , pp. 53-64
    • Dawood, N.D.1
  • 4
    • 0028338155 scopus 로고
    • An Introduction to Simulated Evolutionary Optimization
    • Fogel, D. B. 1994, An Introduction to Simulated Evolutionary Optimization, IEEE Trans Neural Networks, Vol. 5, No. 1, pp. 3-14.
    • (1994) IEEE Trans Neural Networks , vol.5 , Issue.1 , pp. 3-14
    • Fogel, D.B.1
  • 7
    • 0035391119 scopus 로고    scopus 로고
    • Optimal Repetitive Scheduling Model with Shareable Resource Constraint
    • Leu, S. S., and S. T. Hwang. 2001, Optimal Repetitive Scheduling Model with Shareable Resource Constraint, Journal of Construction Engineering and Management, Vol. 127, No. 4, pp. 270-280.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.S.1    Hwang, S.T.2
  • 8
    • 0026928408 scopus 로고
    • Aggregate production planning - A Survey of Models and Methodologies
    • Nam, S. J., and R. Logendran. 1992, Aggregate production planning - A Survey of Models and Methodologies, European Journal of Operational Research, Vol. 61, No. 3, pp. 255-272.
    • (1992) European Journal of Operational Research , vol.61 , Issue.3 , pp. 255-272
    • Nam, S.J.1    Logendran, R.2
  • 9
    • 0021295608 scopus 로고
    • Production Planning in Prefabrication Plant
    • Warszawski, A. 1984, Production Planning in Prefabrication Plant, Building and Environment, Vol. 19, No. 2, pp. 139-148.
    • (1984) Building and Environment , vol.19 , Issue.2 , pp. 139-148
    • Warszawski, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.