메뉴 건너뛰기




Volumn 14, Issue 1, 2009, Pages 107-129

Tracking the evolution of research issues on agility

Author keywords

Agile manufacturing; Agile supply chain; Agility

Indexed keywords


EID: 70349603652     PISSN: 10293132     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (149)
  • 1
    • 33748693686 scopus 로고    scopus 로고
    • Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach
    • Agarwal, A., Shankar, R., Tiwari, M.K. (2006) Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach. European Journal of Operational Research, 173(1), 211-225.
    • (2006) European Journal of Operational Research , vol.173 , Issue.1 , pp. 211-225
    • Agarwal, A.1    Shankar, R.2    Tiwari, M.K.3
  • 4
    • 0038250770 scopus 로고    scopus 로고
    • Strategies for enhancing agility of make-to-order manufacturing systems
    • Babu, A.S. (1999) Strategies for enhancing agility of make-to-order manufacturing systems. International Journal of Agile Management Systems, 1(1), 23-29.
    • (1999) International Journal of Agile Management Systems , vol.1 , Issue.1 , pp. 23-29
    • Babu, A.S.1
  • 5
  • 6
    • 36148991751 scopus 로고    scopus 로고
    • The design and operation of distribution centres within agile supply chains
    • Baker, P. (2008) The design and operation of distribution centres within agile supply chains. International Journal of Production Economics, 111(1), 27-41.
    • (2008) International Journal of Production Economics , vol.111 , Issue.1 , pp. 27-41
    • Baker, P.1
  • 9
    • 0001965293 scopus 로고
    • The service encounter: Diagnosing favorable and unfavorable incidents
    • Bitner, M.J., Booms, B.H., Tetreault, M.S. (1990) The service encounter: Diagnosing favorable and unfavorable incidents. Journal of Marketing, 54(1), 71-84.
    • (1990) Journal of Marketing , vol.54 , Issue.1 , pp. 71-84
    • Bitner, M.J.1    Booms, B.H.2    Tetreault, M.S.3
  • 10
    • 0032181733 scopus 로고    scopus 로고
    • Making agile assembly profitable
    • Bodine, W.E. (1998) Making agile assembly profitable. Manufacturing Engineering, 121(4), 60-68.
    • (1998) Manufacturing Engineering , vol.121 , Issue.4 , pp. 60-68
    • Bodine, W.E.1
  • 11
    • 0042740435 scopus 로고    scopus 로고
    • The manufacturing strategy-capabilities links in mass customisation and agile manufacturing - An exploratory study
    • Brown, S., Bessant, J. (2003) The manufacturing strategy-capabilities links in mass customisation and agile manufacturing - An exploratory study. International Journal of Operations & Production Management, 23(7), 707-730.
    • (2003) International Journal of Operations & Production Management , vol.23 , Issue.7 , pp. 707-730
    • Brown, S.1    Bessant, J.2
  • 12
    • 1442327301 scopus 로고    scopus 로고
    • Lean or agile: A solution for supply chain management in the textiles and clothing industry?
    • Bruce, M., Daly, L., Towers, N. (2004) Lean or agile: A solution for supply chain management in the textiles and clothing industry? International Journal of Operations & Production Management, 24(1/2), 151-170.
    • (2004) International Journal of Operations & Production Management , vol.24 , Issue.1-2 , pp. 151-170
    • Bruce, M.1    Daly, L.2    Towers, N.3
  • 13
    • 3543092561 scopus 로고
    • Making the leap to agility: Defining and achieving agile manufacturing through business process redesign and business network redesign
    • Burgess, T.F. (1994) Making the leap to agility: Defining and achieving agile manufacturing through business process redesign and business network redesign. International Journal of Operations & Production Management, 14(11), 23-34.
    • (1994) International Journal of Operations & Production Management , vol.14 , Issue.11 , pp. 23-34
    • Burgess, T.F.1
  • 15
    • 0030189549 scopus 로고    scopus 로고
    • Enabling technologies of agile manufacturing and its related activities in Korea
    • Cho, H., Jung, M., Kim, M. (1996) Enabling technologies of agile manufacturing and its related activities in Korea. Computers & Industrial Engineering, 30(3), 323-334.
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.3 , pp. 323-334
    • Cho, H.1    Jung, M.2    Kim, M.3
  • 16
    • 0033634601 scopus 로고    scopus 로고
    • The agile supply chain: competing in volatile markets
    • Christopher, M. (2000) The agile supply chain: competing in volatile markets. Industrial Marketing Management, 29(1), 37-44.
    • (2000) Industrial Marketing Management , vol.29 , Issue.1 , pp. 37-44
    • Christopher, M.1
  • 17
    • 0034196806 scopus 로고    scopus 로고
    • Developing strategic partnerships in the supply chain: A practitioner perspective
    • Christopher, M., Juettner, U. (2000) Developing strategic partnerships in the supply chain: A practitioner perspective. European Journal of Purchasing and Supply Management, 6(2), 117-127.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.2 , pp. 117-127
    • Christopher, M.1    Juettner, U.2
  • 18
    • 9444219990 scopus 로고    scopus 로고
    • Don't lean too far - Distinguishing between the lean and agile Paradigms
    • Aston, UK
    • Christopher, M., Towill, D.R. (2000a) Don't lean too far - Distinguishing between the lean and agile Paradigms. Proceedings of the MIM 2000 Conference, Aston, UK, 178-188.
    • (2000) Proceedings of the MIM 2000 Conference , pp. 178-188
    • Christopher, M.1    Towill, D.R.2
  • 25
    • 54949112579 scopus 로고    scopus 로고
    • An agile enterprise reference model with a case study of Remmels engineering
    • Accessed September 28, 2008
    • Dove, R., Hartman, S., Benson, S. (1996) An agile enterprise reference model with a case study of Remmels engineering. The Agile Forum. http://www.parshift.com/docs/aermodA0.htm, Accessed September 28, 2008.
    • (1996) The Agile Forum
    • Dove, R.1    Hartman, S.2    Benson, S.3
  • 28
    • 0001275618 scopus 로고    scopus 로고
    • What is the right supply chain for your product?
    • Fisher, M.L. (1997) What is the right supply chain for your product? Harvard Business Review, 75(2), 105-116.
    • (1997) Harvard Business Review , vol.75 , Issue.2 , pp. 105-116
    • Fisher, M.L.1
  • 29
    • 47949103721 scopus 로고
    • The critical incident technique
    • July
    • Flanagan, J.C. (1954) The critical incident technique. Psychological Bulletin, 51(July), 327-357.
    • (1954) Psychological Bulletin , vol.51 , pp. 327-357
    • Flanagan, J.C.1
  • 31
    • 0042363455 scopus 로고    scopus 로고
    • Analysis of the structural measures of flexibility and agility using a measurement theoretical framework
    • Giachetti, R.E., Martinez, L.D., Saenz, O.A., Chen, C.S. (2003) Analysis of the structural measures of flexibility and agility using a measurement theoretical framework. International Journal of Production Economics, 86(1), 47-62.
    • (2003) International Journal of Production Economics , vol.86 , Issue.1 , pp. 47-62
    • Giachetti, R.E.1    Martinez, L.D.2    Saenz, O.A.3    Chen, C.S.4
  • 33
    • 0002504366 scopus 로고
    • Management, technology and agility: The emergence of a new era in manufacturing
    • Goldman, S.L., Nagel, R.N. (1993) Management, technology and agility: The emergence of a new era in manufacturing. International Journal of Technology Management, 8(1/2), 18-38.
    • (1993) International Journal of Technology Management , vol.8 , Issue.1-2 , pp. 18-38
    • Goldman, S.L.1    Nagel, R.N.2
  • 36
    • 3042772094 scopus 로고    scopus 로고
    • Agile manufacturing practices in the specialty chemical industry: An overview of the trends and results of a specific case study
    • Guisinger, B.G., Ghorashi, B. (2004) Agile manufacturing practices in the specialty chemical industry: An overview of the trends and results of a specific case study. International Journal of Operations & Production Management, 24(6), 625-635.
    • (2004) International Journal of Operations & Production Management , vol.24 , Issue.6 , pp. 625-635
    • Guisinger, B.G.1    Ghorashi, B.2
  • 37
    • 0032070305 scopus 로고    scopus 로고
    • Agile manufacturing: Enablers and an implementation framework
    • Gunasekaran, A. (1998) Agile manufacturing: Enablers and an implementation framework. International Journal of Production Research, 36(5), 1223-1247.
    • (1998) International Journal of Production Research , vol.36 , Issue.5 , pp. 1223-1247
    • Gunasekaran, A.1
  • 38
    • 0032640805 scopus 로고    scopus 로고
    • Agile manufacturing: A framework for research and development
    • Gunasekaran, A. (1999a) Agile manufacturing: A framework for research and development. International Journal of Production Economics, 62(1-2), 87-105.
    • (1999) International Journal of Production Economics , vol.62 , Issue.1-2 , pp. 87-105
    • Gunasekaran, A.1
  • 39
    • 0009455197 scopus 로고    scopus 로고
    • Design and implementation of agile manufacturing systems
    • Gunasekaran, A. (1999b) Design and implementation of agile manufacturing systems. International Journal of Production Economics, 62(1-2), 1-6.
    • (1999) International Journal of Production Economics , vol.62 , Issue.1-2 , pp. 1-6
    • Gunasekaran, A.1
  • 41
    • 0036642583 scopus 로고    scopus 로고
    • An investigation into the application of agile manufacturing in an aerospace company
    • Gunasekaran, A., Tirtiroglu, E., Wolstencroft, V. (2002) An investigation into the application of agile manufacturing in an aerospace company. Technovation, 22(7), 405-415.
    • (2002) Technovation , vol.22 , Issue.7 , pp. 405-415
    • Gunasekaran, A.1    Tirtiroglu, E.2    Wolstencroft, V.3
  • 42
    • 0037091912 scopus 로고    scopus 로고
    • Agile manufacturing: A taxonomy of strategic and technological imperatives
    • Gunasekaran, A., Yusuf, Y.Y. (2002) Agile manufacturing: A taxonomy of strategic and technological imperatives. International Journal of Production Research, 40(6), 1357-1385.
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1357-1385
    • Gunasekaran, A.1    Yusuf, Y.Y.2
  • 44
    • 70349604437 scopus 로고    scopus 로고
    • Agent-based agile manufacturing system scheduling
    • S. D'Amours, A. Guinet (Ed.) Butterworth-Heinemann
    • He, D., Babayan, A. (2003) Agent-based agile manufacturing system scheduling. In S. D'Amours, A. Guinet (Ed.) Intelligent Agent-based Operations Management, Butterworth-Heinemann, 87-108.
    • (2003) Intelligent Agent-based Operations Management , pp. 87-108
    • He, D.1    Babayan, A.2
  • 45
    • 0037065238 scopus 로고    scopus 로고
    • Transshipments: An emerging inventory recourse to achieve supply chain leagility
    • Herer, Y.T., Tzur, M., Yucesan, E. (2002) Transshipments: An emerging inventory recourse to achieve supply chain leagility. International Journal of Production Economics, 80(3) 201-212.
    • (2002) International Journal of Production Economics , vol.80 , Issue.3 , pp. 201-212
    • Herer, Y.T.1    Tzur, M.2    Yucesan, E.3
  • 48
    • 0031362533 scopus 로고    scopus 로고
    • Design of a study to test the statistical significance of five enablers of agile manufacturing organizations
    • Miami Beach, FL
    • Hoyt, J., Hug, F., Liles, D.H. (1997) Design of a study to test the statistical significance of five enablers of agile manufacturing organizations. Proceedings of the Sixth Industrial Engineering Research Conference, Miami Beach, FL, 966-971.
    • (1997) Proceedings of the Sixth Industrial Engineering Research Conference , pp. 966-971
    • Hoyt, J.1    Hug, F.2    Liles, D.H.3
  • 50
    • 70349586627 scopus 로고    scopus 로고
    • Development of a collaborative manufacturing, planning, and scheduling system: Integrating lean and agile manufacturing for the supply chain
    • Jiang, J.-C., Chen, K.-H. (2007) Development of a collaborative manufacturing, planning, and scheduling system: Integrating lean and agile manufacturing for the supply chain. International Journal of Management, 24(2), 331-345.
    • (2007) International Journal of Management , vol.24 , Issue.2 , pp. 331-345
    • Jiang, J.-C.1    Chen, K.-H.2
  • 52
    • 33846201051 scopus 로고    scopus 로고
    • Assessing the measurement of organizational agility
    • Kassim, N.M., Zain, M. (2004) Assessing the measurement of organizational agility. Journal of American Academy of Business, 4(1/2), 174-177.
    • (2004) Journal of American Academy of Business , vol.4 , Issue.1-2 , pp. 174-177
    • Kassim, N.M.1    Zain, M.2
  • 53
    • 0032675021 scopus 로고    scopus 로고
    • Agility, adaptability and leanness: A comparison of concepts and a study of practice
    • 60-61
    • Katayama, H., Bennett, D. (1999) Agility, adaptability and leanness: A comparison of concepts and a study of practice. International Journal of Production Economics, 60-61, 43-51.
    • (1999) International Journal of Production Economics , pp. 43-51
    • Katayama, H.1    Bennett, D.2
  • 55
    • 0030413664 scopus 로고    scopus 로고
    • IEE Colloquium Digest, No. 96/071
    • st century. IEE Colloquium Digest, No. 96/071.
    • (1996) st century
    • Kidd, P.T.1
  • 58
    • 70349589711 scopus 로고    scopus 로고
    • Creating agile supply chains for competitive advantage
    • Lau, R.S.M., Hurley, N.M. (2001) Creating agile supply chains for competitive advantage. South Dakota Business Review, 60(1), 1-5.
    • (2001) South Dakota Business Review , vol.60 , Issue.1 , pp. 1-5
    • Lau, R.S.M.1    Hurley, N.M.2
  • 61
    • 1342265991 scopus 로고    scopus 로고
    • Original equipment manufacturers (OEM) manufacturing strategy for network innovation agility: The case of Taiwanese manufacturing networks
    • Lin, B.W. (2004) Original equipment manufacturers (OEM) manufacturing strategy for network innovation agility: The case of Taiwanese manufacturing networks. International Journal of Production Research, 42(5), 943-957.
    • (2004) International Journal of Production Research , vol.42 , Issue.5 , pp. 943-957
    • Lin, B.W.1
  • 70
    • 84993009244 scopus 로고    scopus 로고
    • Using the information decoupling point to improve supply chain performance
    • Mason-Jones, R., Towill, D.R. (1999b) Using the information decoupling point to improve supply chain performance. International Journal of Logistics Management, 10(2), 13-26.
    • (1999) International Journal of Logistics Management , vol.10 , Issue.2 , pp. 13-26
    • Mason-Jones, R.1    Towill, D.R.2
  • 72
    • 0035206678 scopus 로고    scopus 로고
    • Achieving lean supply through agile manufacturing
    • McCullen, P., Towill, D.R. (2001) Achieving lean supply through agile manufacturing. Integrated Manufacturing Systems, 12(6/7), 524-533.
    • (2001) Integrated Manufacturing Systems , vol.12 , Issue.6-7 , pp. 524-533
    • McCullen, P.1    Towill, D.R.2
  • 74
  • 76
    • 84986099468 scopus 로고    scopus 로고
    • Supply chain management: A case study of an integrated lean and agile model
    • Mistry, J.J. (2005) Supply chain management: A case study of an integrated lean and agile model. Qualitative Research in Accounting & Management, 2(2), 193-215.
    • (2005) Qualitative Research in Accounting & Management , vol.2 , Issue.2 , pp. 193-215
    • Mistry, J.J.1
  • 77
    • 46349112096 scopus 로고    scopus 로고
    • Creating flex-lean-agile value chain by outsourcing: An ISM-based interventional
    • Mohammed, I.R., Shankar, R., Banwet, D.K. (2008) Creating flex-lean-agile value chain by outsourcing: An ISM-based interventional. Business Process Management Journal, 18(3), 338-389.
    • (2008) Business Process Management Journal , vol.18 , Issue.3 , pp. 338-389
    • Mohammed, I.R.1    Shankar, R.2    Banwet, D.K.3
  • 78
    • 0041170343 scopus 로고
    • Agility: The ultimate requirement for world-class manufacturing performance
    • Nagel, R.N., Bhargava, P. (1994) Agility: The ultimate requirement for world-class manufacturing performance. National Productivity Review, 13(3), 331-40.
    • (1994) National Productivity Review , vol.13 , Issue.3 , pp. 331-340
    • Nagel, R.N.1    Bhargava, P.2
  • 79
    • 33747886515 scopus 로고    scopus 로고
    • Disentangling leanness and agility: An empirical investigation
    • Narasimhan, R., Swink, M., Kimb, S.W. (2006) Disentangling leanness and agility: An empirical investigation. Journal of Operations Management, 24(5), 440-457.
    • (2006) Journal of Operations Management , vol.24 , Issue.5 , pp. 440-457
    • Narasimhan, R.1    Swink, M.2    Kimb, S.W.3
  • 80
    • 0344240982 scopus 로고    scopus 로고
    • Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
    • Naylor, J.B., Naim, M.M., Berry, D. (1999) Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain. International Journal of Production Economics, 62(1-2), 107-118.
    • (1999) International Journal of Production Economics , vol.62 , Issue.1-2 , pp. 107-118
    • Naylor, J.B.1    Naim, M.M.2    Berry, D.3
  • 81
    • 0028532893 scopus 로고
    • The search for agile manufacturing
    • Noaker, P.M. (1994) The search for agile manufacturing. Manufacturing Engineering, 113(5), 40-43.
    • (1994) Manufacturing Engineering , vol.113 , Issue.5 , pp. 40-43
    • Noaker, P.M.1
  • 85
    • 0009398320 scopus 로고    scopus 로고
    • Importance of employee involvement in world-class agile management systems
    • Owusu, A.Y. (1999) Importance of employee involvement in world-class agile management systems. International Journal of Agile Management Systems, 1(2), 107-115.
    • (1999) International Journal of Agile Management Systems , vol.1 , Issue.2 , pp. 107-115
    • Owusu, A.Y.1
  • 86
    • 0037775022 scopus 로고    scopus 로고
    • Agile manufacturing in the aerospace industry: An industrial viewpoint
    • Phillips, M. (1999) Agile manufacturing in the aerospace industry: An industrial viewpoint. International Journal of Agile Management Systems, 1(1), 17-22.
    • (1999) International Journal of Agile Management Systems , vol.1 , Issue.1 , pp. 17-22
    • Phillips, M.1
  • 90
    • 0038824825 scopus 로고    scopus 로고
    • Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis
    • Prince, J., Kay, J.M. (2003) Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis. International Journal of Production Economics, 85(3), 308-318.
    • (2003) International Journal of Production Economics , vol.85 , Issue.3 , pp. 308-318
    • Prince, J.1    Kay, J.M.2
  • 91
    • 70349604832 scopus 로고    scopus 로고
    • Agility performance metrics
    • CEST Publications, London
    • Proops, S. (1997) Agility performance metrics. Demand-Driven Agile Manufacturing, CEST Publications, London.
    • (1997) Demand-Driven Agile Manufacturing
    • Proops, S.1
  • 92
    • 0042364765 scopus 로고    scopus 로고
    • Interoperating standards in multiagent agile manufacturing scheduling systems
    • Rabelo, R.J. (2003) Interoperating standards in multiagent agile manufacturing scheduling systems. International Journal of Computer Applications in Technology, 18(1-4), 146-159.
    • (2003) International Journal of Computer Applications in Technology , vol.18 , Issue.1-4 , pp. 146-159
    • Rabelo, R.J.1
  • 94
    • 54349102412 scopus 로고    scopus 로고
    • Agility assessment through qualification and quantification tools: A case study in an Indian pump manufacturing company
    • Ramesh, G., Devadasan, S.R. (2007a) Agility assessment through qualification and quantification tools: A case study in an Indian pump manufacturing company. International Journal of Mass Customisation, 2(1-2), 139-160.
    • (2007) International Journal of Mass Customisation , vol.2 , Issue.1-2 , pp. 139-160
    • Ramesh, G.1    Devadasan, S.R.2
  • 98
    • 0006933878 scopus 로고    scopus 로고
    • Application of lean production and agile manufacturing concepts in a telecommunications environment
    • Robertson, M., Jones, C. (1999) Application of lean production and agile manufacturing concepts in a telecommunications environment. International Journal of Agile Manufacturing Systems, 1(1), 14-17.
    • (1999) International Journal of Agile Manufacturing Systems , vol.1 , Issue.1 , pp. 14-17
    • Robertson, M.1    Jones, C.2
  • 99
    • 0012501451 scopus 로고    scopus 로고
    • Manufacturing competitiveness: Different systems to achieve the same results
    • Sahin, F. (2000) Manufacturing competitiveness: Different systems to achieve the same results. Production & Inventory Management Journal, 41(1), 56-65.
    • (2000) Production & Inventory Management Journal , vol.41 , Issue.1 , pp. 56-65
    • Sahin, F.1
  • 100
    • 0035841889 scopus 로고    scopus 로고
    • A review of agile manufacturing system
    • Sanchez, L.M., Nagi, R. (2001) A review of agile manufacturing system. Journal of Production Research, 39(6), 3561-3600.
    • (2001) Journal of Production Research , vol.39 , Issue.6 , pp. 3561-3600
    • Sanchez, L.M.1    Nagi, R.2
  • 102
    • 1342287282 scopus 로고    scopus 로고
    • Agile production planning and control with advance notification to change schedule
    • Sato, R., Tsai, T.L. (2004) Agile production planning and control with advance notification to change schedule. International Journal of Production Research, 42(2), 321-336.
    • (2004) International Journal of Production Research , vol.42 , Issue.2 , pp. 321-336
    • Sato, R.1    Tsai, T.L.2
  • 104
    • 33750172221 scopus 로고    scopus 로고
    • Achieving agility in supply chain through simultaneous "design of" and "design for" supply chain
    • Sharifi, H., Ismail, H.S., Reid, I. (2006) Achieving agility in supply chain through simultaneous "design of" and "design for" supply chain. Journal of Manufacturing Technology Management, 17(8), 1078-1098.
    • (2006) Journal of Manufacturing Technology Management , vol.17 , Issue.8 , pp. 1078-1098
    • Sharifi, H.1    Ismail, H.S.2    Reid, I.3
  • 105
    • 0041985181 scopus 로고    scopus 로고
    • Enabling practices assisting achievement of agile manufacturing
    • Robotics and Manufacturing, Banff, Canada
    • Sharifi, H., Zhang, Z. (1998) Enabling practices assisting achievement of agile manufacturing. Proceedings of Sixth IASTED International Conference, Robotics and Manufacturing, Banff, Canada, 23-31.
    • (1998) Proceedings of Sixth IASTED International Conference , pp. 23-31
    • Sharifi, H.1    Zhang, Z.2
  • 106
    • 0032630090 scopus 로고    scopus 로고
    • A methodology for achieving agility in manufacturing organizations: An introduction
    • Sharifi, H., Zhang, Z. (1999) A methodology for achieving agility in manufacturing organizations: An introduction. International Journal of Production Economics, 62(1-2), 7-22.
    • (1999) International Journal of Production Economics , vol.62 , Issue.1-2 , pp. 7-22
    • Sharifi, H.1    Zhang, Z.2
  • 109
    • 27844565379 scopus 로고    scopus 로고
    • Supply chain agility: The influence of industry culture on asset capabilities within capital intensive industries
    • Shaw, N.E., Burgess, T.F., de Mattos, C., Stec, L.Z. (2005) Supply chain agility: The influence of industry culture on asset capabilities within capital intensive industries. International Journal of Production Research, 43(16), 3497-3516.
    • (2005) International Journal of Production Research , vol.43 , Issue.16 , pp. 3497-3516
    • Shaw, N.E.1    Burgess, T.F.2    de Mattos, C.3    Stec, L.Z.4
  • 111
    • 0002094466 scopus 로고
    • Agile manufacturing: Stepping beyond lean production
    • Sheridan, J.H. (1993) Agile manufacturing: Stepping beyond lean production. Industry Week, 242(8), 30-46.
    • (1993) Industry Week , vol.242 , Issue.8 , pp. 30-46
    • Sheridan, J.H.1
  • 112
    • 0033733696 scopus 로고    scopus 로고
    • A metric for agility measurement in product development
    • Sieger, D.B., Badiru, A.B., Milatovic, M. (2000) A metric for agility measurement in product development. IIE Transaction, 32, 637-645.
    • (2000) IIE Transaction , vol.32 , pp. 637-645
    • Sieger, D.B.1    Badiru, A.B.2    Milatovic, M.3
  • 115
    • 29144483522 scopus 로고    scopus 로고
    • The antecedents of supply chain agility of a firm: Scale development and model testing
    • Swafford, P.M., Ghosh, S., Murthy, N. (2006a) The antecedents of supply chain agility of a firm: Scale development and model testing. Journal of Operations Management, 24(2), 170-188.
    • (2006) Journal of Operations Management , vol.24 , Issue.2 , pp. 170-188
    • Swafford, P.M.1    Ghosh, S.2    Murthy, N.3
  • 119
    • 23044489202 scopus 로고    scopus 로고
    • The supply chain strategy conundrum: To be lean or agile or to be lean and agile
    • Towill, D.R., Christopher, M. (2002) The supply chain strategy conundrum: To be lean or agile or to be lean and agile. International Journal of Logistics, 5(3), 299-309.
    • (2002) International Journal of Logistics , vol.5 , Issue.3 , pp. 299-309
    • Towill, D.R.1    Christopher, M.2
  • 124
    • 0242301577 scopus 로고    scopus 로고
    • Two-stage simulation optimization for agile manufacturing capacity planning
    • Uribe, A.M., Cochran, J.K., Shunk, D.L. (2003) Two-stage simulation optimization for agile manufacturing capacity planning. International Journal of Production Research, 41(6), 1181-1197.
    • (2003) International Journal of Production Research , vol.41 , Issue.6 , pp. 1181-1197
    • Uribe, A.M.1    Cochran, J.K.2    Shunk, D.L.3
  • 125
    • 3142638722 scopus 로고    scopus 로고
    • Agile-based competence management: The relation between agile manufacturing and time-based competence management
    • Van Assen, M.F. (2000) Agile-based competence management: The relation between agile manufacturing and time-based competence management. International Journal of Agile Management Systems, 2(2), 142-159.
    • (2000) International Journal of Agile Management Systems , vol.2 , Issue.2 , pp. 142-159
    • Van Assen, M.F.1
  • 126
    • 0346196844 scopus 로고    scopus 로고
    • An agile planning and control framework for customer-order driven discrete parts manufacturing environments
    • Van Assen, M.F., Hans, E.W., van de Velde, S.L. (2000) An agile planning and control framework for customer-order driven discrete parts manufacturing environments. International Journal of Agile Management Systems, 2(1), 16-23.
    • (2000) International Journal of Agile Management Systems , vol.2 , Issue.1 , pp. 16-23
    • Van Assen, M.F.1    Hans, E.W.2    van de Velde, S.L.3
  • 129
    • 0002706399 scopus 로고
    • Manufacturing agility: The conference
    • Vasilash, G.S. (1993) Manufacturing agility: The conference. Production, 105(4), 58-63.
    • (1993) Production , vol.105 , Issue.4 , pp. 58-63
    • Vasilash, G.S.1
  • 130
    • 12244277062 scopus 로고
    • Agility & other anguishing exercises in the auto industry
    • Vasilash, G.S. (1994) Agility & other anguishing exercises in the auto industry. Production, 106(10), 50-59.
    • (1994) Production , vol.106 , Issue.10 , pp. 50-59
    • Vasilash, G.S.1
  • 133
    • 33746227586 scopus 로고    scopus 로고
    • Improving agility of supply chains using base stock model and computer based simulations
    • Verma, A.K. (2006) Improving agility of supply chains using base stock model and computer based simulations. International Journal of Physical Distribution & Logistics Management, 36(6), 445-454.
    • (2006) International Journal of Physical Distribution & Logistics Management , vol.36 , Issue.6 , pp. 445-454
    • Verma, A.K.1
  • 136
    • 0012630329 scopus 로고
    • The critical incidents technique: Philosophical foundations and methodological implications
    • American Marketing Association, Chicago
    • Walker, S.J., Truly, E. (1992) The critical incidents technique: Philosophical foundations and methodological implications. AMA Winter Educators' Conference Proceedings: Marketing Theory and Applications, Vol. 3, American Marketing Association, Chicago, 270-275.
    • (1992) AMA Winter Educators' Conference Proceedings: Marketing Theory and Applications , vol.3 , pp. 270-275
    • Walker, S.J.1    Truly, E.2
  • 137
    • 0345086631 scopus 로고
    • What is agility?
    • Ward, C. (1994) What is agility? Industrial Engineering, 26(11), 14-16.
    • (1994) Industrial Engineering , vol.26 , Issue.11 , pp. 14-16
    • Ward, C.1
  • 139
    • 2942582990 scopus 로고    scopus 로고
    • Constructing a virtuous cycle of manufacturing agility: Concurrent roles of modularity in improving agility and reducing lead time
    • Watanabe, C., Ane, B.K. (2004) Constructing a virtuous cycle of manufacturing agility: Concurrent roles of modularity in improving agility and reducing lead time. Technovation, 24(7), 573-583.
    • (2004) Technovation , vol.24 , Issue.7 , pp. 573-583
    • Watanabe, C.1    Ane, B.K.2
  • 141
    • 23844517727 scopus 로고    scopus 로고
    • The role of emergent information technologies and systems in enabling supply chain agility
    • White, A., Daniel, E.M., Mohdzain, M. (2005) The role of emergent information technologies and systems in enabling supply chain agility. International Journal of Information Management, 25(5), 396-410.
    • (2005) International Journal of Information Management , vol.25 , Issue.5 , pp. 396-410
    • White, A.1    Daniel, E.M.2    Mohdzain, M.3
  • 142
    • 0242333143 scopus 로고    scopus 로고
    • System for enhancing supply chain agility through exception handling
    • Xu, H.Q., Besant, C.B., Ristic, M. (2003) System for enhancing supply chain agility through exception handling. International Journal of Production Research, 41(6), 1099-1114.
    • (2003) International Journal of Production Research , vol.41 , Issue.6 , pp. 1099-1114
    • Xu, H.Q.1    Besant, C.B.2    Ristic, M.3
  • 144
    • 0002876747 scopus 로고
    • Agile manufacturing: A necessary condition for competing in global markets
    • Youssef, M.A. (1992) Agile manufacturing: A necessary condition for competing in global markets. Industrial Engineering, 24(12), 18-20.
    • (1992) Industrial Engineering , vol.24 , Issue.12 , pp. 18-20
    • Youssef, M.A.1
  • 145
    • 2142732422 scopus 로고    scopus 로고
    • A conceptual framework for agent-based agile manufacturing cells
    • Yu, J., Krishnan, K.K. (2004) A conceptual framework for agent-based agile manufacturing cells. Information Systems Journal, 14(2), 93-109.
    • (2004) Information Systems Journal , vol.14 , Issue.2 , pp. 93-109
    • Yu, J.1    Krishnan, K.K.2
  • 146
    • 0037146416 scopus 로고    scopus 로고
    • A comparative study of lean and agile manufacturing with a related survey of current practices in the UK
    • Yusuf, Y.Y., Adeleye, E.O. (2002) A comparative study of lean and agile manufacturing with a related survey of current practices in the UK. International Journal of Production Research, 40(17), 4545-4562.
    • (2002) International Journal of Production Research , vol.40 , Issue.17 , pp. 4545-4562
    • Yusuf, Y.Y.1    Adeleye, E.O.2
  • 148
    • 0032667865 scopus 로고    scopus 로고
    • Object-oriented modeling of control system for agile manufacturing cells
    • Zhang, J., Gu, J., Li, P., Duan, Z. (1999) Object-oriented modeling of control system for agile manufacturing cells. International Journal of Production Economics, 62(1-2), 145-153.
    • (1999) International Journal of Production Economics , vol.62 , Issue.1-2 , pp. 145-153
    • Zhang, J.1    Gu, J.2    Li, P.3    Duan, Z.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.