메뉴 건너뛰기




Volumn 135, Issue 10, 2009, Pages 965-978

Determination of key performance indicators with enterprise resource planning systems in engineering construction firms

Author keywords

Construction management; Information management; Information Technology (IT)

Indexed keywords

BUSINESS PROCESS; CONSTRUCTION FIRMS; CONSTRUCTION MANAGEMENT; ENGINEERING AND CONSTRUCTION FIRMS; ENTERPRISE MANAGEMENT SYSTEM; ENTERPRISE RESOURCE PLANNING SYSTEMS; ERP SYSTEM; ERP SYSTEMS IMPLEMENTATIONS; KEY PERFORMANCE INDICATORS; QUALITATIVE ASPECTS; TIME SENSITIVITY; TWO-DIMENSION; UNIFIED APPROACH;

EID: 70349337781     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:10(965)     Document Type: Article
Times cited : (90)

References (44)
  • 1
    • 14744304229 scopus 로고    scopus 로고
    • Performance measurement in construction
    • DOI 10.1061/(ASCE)0742-597X(2004)20:2(42)
    • Bassioni, H. A., Price, A. D. F., and Hassan, T. M. (2004). " Performance measurement in construction.." J. Manage. Eng. 0742-597X, 20 (2), 42-50. 10.1061/(ASCE)0742-597X(2004)20:2(42) (Pubitemid 40329300)
    • (2004) Journal of Management in Engineering , vol.20 , Issue.2 , pp. 42-50
    • Bassioni, H.A.1    Price, A.D.F.2    Hassan, T.M.3
  • 2
    • 20744455983 scopus 로고    scopus 로고
    • KPIs: A critical appraisal of their use in construction
    • DOI 10.1108/14635770410520320
    • Beatham, S., Anumba, C. J., Thorpe, T., and Hedges, I. (2004). " KPIs-A critical appraisal of their use in construction.." Benchmarking, Int. J. 1463-5771, 11 (1), 93-117. 10.1108/14635770410520320 (Pubitemid 41137109)
    • (2004) Benchmarking , vol.11 , Issue.1 , pp. 93-117
    • Beatham, S.1    Anumba, C.2    Thorpe, T.3    Hedges, I.4
  • 5
    • 0002028129 scopus 로고    scopus 로고
    • Information specificity andenvironment scanning: An economic perspective
    • 0276-7783, (),. 10.2307/249741
    • Choudhury, V., and Sampler, J. (1997). " Information specificity andenvironment scanning: An economic perspective.." MIS Q. 0276-7783, 21 (1), 25-53. 10.2307/249741
    • (1997) MIS Q. , vol.21 , Issue.1 , pp. 25-53
    • Choudhury, V.1    Sampler, J.2
  • 6
    • 60449103357 scopus 로고    scopus 로고
    • Developing ERP systems success model for the construction industry
    • ", (),. 10.1061/(ASCE)0733-9364(2009)135:3(207)
    • Chung, B. Y., Skibniewski, M. J., and Kwak, Y. H. (2009). " Developing ERP systems success model for the construction industry.." J. Constr. Eng. Manage., 135 (3), 207-216. 10.1061/(ASCE)0733-9364(2009)135:3(207)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 207-216
    • Chung, B.Y.1    Skibniewski, M.J.2    Kwak, Y.H.3
  • 7
    • 54249095612 scopus 로고    scopus 로고
    • Analyzing enterprise resource planning system implementation factors inthe engineering-construction industry
    • ", (),. 10.1061/(ASCE)0887-3801(2008)22:6(373)
    • Chung, B. Y., Skibniewski, M. J., and Lucas, H. C. (2008). " Analyzing enterprise resource planning system implementation factors inthe engineering-construction industry.." J. Comput. Civ. Eng., 22 (6), 373-382. 10.1061/(ASCE)0887-3801(2008)22:6(373)
    • (2008) J. Comput. Civ. Eng. , vol.22 , Issue.6 , pp. 373-382
    • Chung, B.Y.1    Skibniewski, M.J.2    Lucas, H.C.3
  • 8
    • 70349361767 scopus 로고    scopus 로고
    • Construction Best Practice Program-Key Performance Indicators.. Construction best practice program key performance indicators, 〈〉 (Apr. 2006).
    • Construction Best Practice Program-Key Performance Indicators. (2004). Construction best practice program key performance indicators, 〈 http://www.constructingexcelleance.org.uk 〉 (Apr. 2006).
    • (2004)
  • 10
    • 30344473967 scopus 로고    scopus 로고
    • Completing for analytics
    • 0017-8012.
    • Davenport, T. (2006). " Completing for analytics.." Harvard Bus. Rev. 0017-8012, 84 (1), 98-107.
    • (2006) Harvard Bus. Rev. , vol.84 , Issue.1 , pp. 98-107
    • Davenport, T.1
  • 12
    • 33744813232 scopus 로고    scopus 로고
    • Getting the most from your ERP system
    • Drayer, R., and Wight, R. (2002). " Getting the most from your ERP system.." Supply Chain Manage. Rev., 6 (3), 44-53.
    • (2002) Supply Chain Manage. Rev. , vol.6 , Issue.3 , pp. 44-53
    • Drayer, R.1    Wight, R.2
  • 13
    • 0002658073 scopus 로고
    • The information executives truly need
    • 0017-8012.
    • Drucker, P. (1995). " The information executives truly need.." Harvard Bus. Rev. 0017-8012, 73 (1), 54-62.
    • (1995) Harvard Bus. Rev. , vol.73 , Issue.1 , pp. 54-62
    • Drucker, P.1
  • 14
    • 0033679504 scopus 로고    scopus 로고
    • Extending the balanced scorecard for technology development
    • ", IEEE Engineering Management Society, Oxford, U.K.
    • Durrani, T. S., Forbes, S., and Carrie, A. (2000). " Extending the balanced scorecard for technology development.." Proc., Int. Engineering Management Conf. 2000, IEEE Engineering Management Society, Oxford, U.K.
    • (2000) Proc., Int. Engineering Management Conf. 2000
    • Durrani, T.S.1    Forbes, S.2    Carrie, A.3
  • 15
    • 70349344450 scopus 로고    scopus 로고
    • Using a multimethod approach to research enterprise systems implementations
    • 1477-7029.
    • Esteves, J., and Pastor, J. (2004). " Using a multimethod approach to research enterprise systems implementations.." Electron. J. Business Res. Meth. 1477-7029, 2 (2), 69-82.
    • (2004) Electron. J. Business Res. Meth. , vol.2 , Issue.2 , pp. 69-82
    • Esteves, J.1    Pastor, J.2
  • 16
    • 2342604196 scopus 로고    scopus 로고
    • Knowledge management metrics via a balanced scorecard methodology
    • Vol., Univ. of Hawaii.
    • Fairchild, A. M. (2002) " Knowledge management metrics via a balanced scorecard methodology.." Proc., 35th Hawaii Int. Conf. on System Sciences, Vol. 8, Univ. of Hawaii, 243.
    • (2002) Proc., 35th Hawaii Int. Conf. on System Sciences , vol.8 , pp. 243
    • Fairchild, A.M.1
  • 17
    • 0036442145 scopus 로고    scopus 로고
    • Challenges on a global implementation of ERP software
    • Vol., IEMC.
    • Ghosh, S. (2002). " Challenges on a global implementation of ERP software.." Proc., Engineering Management Conf. 2002, Vol. 1, IEMC, 101-106.
    • (2002) Proc., Engineering Management Conf. 2002 , vol.1 , pp. 101-106
    • Ghosh, S.1
  • 18
    • 0033939810 scopus 로고    scopus 로고
    • Identifying software productivity improvement approaches and risks: Construction industry case study
    • DOI 10.1109/52.819968
    • Hantos, P., and Gisberg, M. (2000). " Identifying software productivity improvement approaches and risks: Construction industry case study.." IEEE Software, 17 (1), 48-56. 10.1109/52.819968 (Pubitemid 30527448)
    • (2000) IEEE Software , vol.17 , Issue.1 , pp. 48-56
    • Hantos, P.1    Gisbert, M.2
  • 19
    • 0037876286 scopus 로고    scopus 로고
    • Performance management in construction: A conceptual framework
    • " 0144-6193, (),. 10.1080/01446190010003425
    • Kagioglou, M., Cooper, R., and Aound, G. (2001). " Performance management in construction: A conceptual framework.." Constr. Manage. Econom. 0144-6193, 19 (1), 85-95. 10.1080/01446190010003425
    • (2001) Constr. Manage. Econom. , vol.19 , Issue.1 , pp. 85-95
    • Kagioglou, M.1    Cooper, R.2    Aound, G.3
  • 20
    • 84984729624 scopus 로고
    • Knowledge of the firm and the evolutionary theory of the multinational corporation
    • Kogut, B., and Zander, U. (1993). " Knowledge of the firm and the evolutionary theory of the multinational corporation.." J. Int. Business Stud., 24, 625-645.
    • (1993) J. Int. Business Stud. , vol.24 , pp. 625-645
    • Kogut, B.1    Zander, U.2
  • 21
    • 3042834693 scopus 로고    scopus 로고
    • Quantified benefit of implementing enterprise resource planning through process simulation
    • DOI 10.1139/l03-100
    • Lee, S., Arif, A. U., and Jang, H. (2004) " Quantified benefit of implementing enterprise resource planning through process simulation.." Can. J. Civ. Eng. 0315-1468, 31 (2), 263-271. 10.1139/l03-100 (Pubitemid 38861280)
    • (2004) Canadian Journal of Civil Engineering , vol.31 , Issue.2 , pp. 263-271
    • Lee, S.1    Arif, A.U.2    Jang, H.3
  • 22
    • 21944457055 scopus 로고    scopus 로고
    • Turning great strategy into great performance
    • 0017-8012.
    • Mankins, M. C., and Steele, R. (2005). " Turning great strategy into great performance.." Harvard Bus. Rev. 0017-8012, 83 (1), 64-72.
    • (2005) Harvard Bus. Rev. , vol.83 , Issue.1 , pp. 64-72
    • Mankins, M.C.1    Steele, R.2
  • 23
  • 24
    • 13244258166 scopus 로고    scopus 로고
    • Web-based technology in support of construction supply chain networks
    • Vol., Emerald GrouPublishing.
    • Mohamed, S. (2003). " Web-based technology in support of construction supply chain networks.." Work study, Vol. 52, Emerald Group Publishing, 13-19.
    • (2003) Work Study , vol.52 , pp. 13-19
    • Mohamed, S.1
  • 25
    • 0000610842 scopus 로고
    • Determinants of performance in the traditional building process
    • 0144-6193, (),. 10.1080/01446199200000030
    • Mohsini, R. A., and Davidson, C. H. (1992). " Determinants of performance in the traditional building process.." Constr. Manage. Econom. 0144-6193, 10 (4), 343-359. 10.1080/01446199200000030
    • (1992) Constr. Manage. Econom. , vol.10 , Issue.4 , pp. 343-359
    • Mohsini, R.A.1    Davidson, C.H.2
  • 26
    • 0037332784 scopus 로고    scopus 로고
    • Monitoring labor inputs: Automated-data-collection model and enabling technologies
    • 0926-5805, (),. 10.1016/S0926-5805(02)00043-2
    • Navon, R., and Goldschmidt, E. (2002). " Monitoring labor inputs: Automated-data-collection model and enabling technologies.." Autom. Constr. 0926-5805, 12 (2), 185-199. 10.1016/S0926-5805(02)00043-2
    • (2002) Autom. Constr. , vol.12 , Issue.2 , pp. 185-199
    • Navon, R.1    Goldschmidt, E.2
  • 27
    • 0000671970 scopus 로고
    • Managing the crises in data processing
    • 0017-8012, March-April.
    • Nolan, R. (1979). " Managing the crises in data processing.." Harvard Bus. Rev. 0017-8012, March-April.
    • (1979) Harvard Bus. Rev.
    • Nolan, R.1
  • 28
    • 0033689604 scopus 로고    scopus 로고
    • Achieving integration on capital projects with enterprise resource planning systems
    • DOI 10.1016/S0926-5805(00)00062-5
    • O'Connor, J. T., and Dodd, S. C. (2000). " Achieving integration on capital projects with enterprise resource planning system.." Autom. Constr. 0926-5805, 9 (5), 515-524. 10.1016/S0926-5805(00)00062-5 (Pubitemid 30890173)
    • (2000) Automation in construction , vol.9 , Issue.5 , pp. 515-524
    • O'Connor, J.T.1    Dodd, S.C.2
  • 29
  • 31
    • 85008016945 scopus 로고    scopus 로고
    • Surprising facts about implementing ERP
    • 1520-9202, (),. 10.1109/6294.781626
    • Ross, J. W. (1999). " Surprising facts about implementing ERP.." IT Prof. 1520-9202, 1 (4), 65-68. 10.1109/6294.781626
    • (1999) IT Prof. , vol.1 , Issue.4 , pp. 65-68
    • Ross, J.W.1
  • 33
    • 13944263240 scopus 로고    scopus 로고
    • Enterprise resource planning for construction business management
    • DOI 10.1061/(ASCE)0733-9364(2003)129:2(214)
    • Shi, J. J., and Halpin, D. W. (2003). " Enterprise resource planning for construction business management.." J. Constr. Eng. Manage. 0733-9364, 129 (2), 214-221. 10.1061/(ASCE)0733-9364(2003)129:2(214) (Pubitemid 40265491)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.2 , pp. 214-221
    • Shi, J.J.1    Halpin, D.W.2
  • 34
    • 0344255739 scopus 로고    scopus 로고
    • The usefulness of ERP systems for effective management
    • 10.1108/02635570310506098
    • Spathis, C., and Constantinides, S. (2003). " The usefulness of ERP systems for effective management.." Int. Manage. Data Syst., 103 (9), 677-685. 10.1108/02635570310506098
    • (2003) Int. Manage. Data Syst. , vol.103 , Issue.9 , pp. 677-685
    • Spathis, C.1    Constantinides, S.2
  • 35
    • 0038043480 scopus 로고    scopus 로고
    • Identifying high performance ERP projects
    • 0098-5589, (),. 10.1109/TSE.2003.1199070
    • Stensrud, E., and Myrtveit, I. (2003). " Identifying high performance ERP projects.." IEEE Trans. Software Eng. 0098-5589, 29 (5), 398-416. 10.1109/TSE.2003.1199070
    • (2003) IEEE Trans. Software Eng. , vol.29 , Issue.5 , pp. 398-416
    • Stensrud, E.1    Myrtveit, I.2
  • 36
    • 33847184279 scopus 로고    scopus 로고
    • IT enhanced project information management in construction: Pathways to improved performance and strategic competitiveness
    • DOI 10.1016/j.autcon.2006.09.001, PII S0926580506000860
    • Stewart, R. A. (2007). " IT enhanced project information management in construction: Pathways to improved performance and strategic competitiveness.." Autom. Constr. 0926-5805, 16 (4), 511-517. 10.1016/j.autcon.2006.09.001 (Pubitemid 46304220)
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 511-517
    • Stewart, R.A.1
  • 37
    • 84986170559 scopus 로고    scopus 로고
    • Current state of construction enterprise information systems: Survey research
    • " 1471-4175, (),. 10.1108/14714170710780075
    • Tatari, O., Castro-Lacouture, D., and Skibniewski, M. (2006). " Current state of construction enterprise information systems: Survey research.." Constr. Innovation 1471-4175, 7 (4), 310-319. 10.1108/14714170710780075
    • (2006) Constr. Innovation , vol.7 , Issue.4 , pp. 310-319
    • Tatari, O.1    Castro-Lacouture, D.2    Skibniewski, M.3
  • 38
    • 51849111867 scopus 로고    scopus 로고
    • Performance evaluation of construction enterprise resource planning systems.
    • ", (),. 10.1061/(ASCE)0742-597X(2008)24:4(198)
    • Tatari, O., Castro-Lacouture, D., and Skibniewski, M. J. (2008). " Performance evaluation of construction enterprise resource planning systems..." J. Manage. Eng., 24 (4), 198-206. 10.1061/(ASCE)0742-597X(2008) 24:4(198)
    • (2008) J. Manage. Eng. , vol.24 , Issue.4 , pp. 198-206
    • Tatari, O.1    Castro-Lacouture, D.2    Skibniewski, M.J.3
  • 39
    • 34248588207 scopus 로고    scopus 로고
    • When should leaders share information with their subordinates?
    • 10.1111/j.1530-9134.2007.00139.x 1058-6407
    • Vidal, J. B., and Möller, M. (2007). " When should leaders share information with their subordinates? " J. Econ. Manage. Strategy, 16 (2), 251-283. 10.1111/j.1530-9134.2007.00139.x 1058-6407
    • (2007) J. Econ. Manage. Strategy , vol.16 , Issue.2 , pp. 251-283
    • Vidal, J.B.1    Möller, M.2
  • 40
    • 0042123816 scopus 로고    scopus 로고
    • Enterprise resource planning in a large construction firm: Implementation analysis
    • DOI 10.1080/0144619032000072155
    • Voordijk, H., Leuven, A. V., and Laan, A. (2003). " Enterprise resource planning in a large construction firm: Implementation analysis.." Constr. Manage. Econom. 0144-6193, 21 (5), 511-521. 10.1080/0144619032000072155 (Pubitemid 36967873)
    • (2003) Construction Management and Economics , vol.21 , Issue.5 , pp. 511-521
    • Voordijk, H.1    Van Leuven, A.2    Laan, A.3
  • 41
    • 0037912278 scopus 로고
    • Objectives and performance in construction projects
    • " 0144-6193, (),. 10.1080/01446199100000027
    • Ward, S. C., Curtis, B., and Chapman, C. B. (1991). " Objectives and performance in construction projects.." Constr. Manage. Econom. 0144-6193, 9 (4), 343-353. 10.1080/01446199100000027
    • (1991) Constr. Manage. Econom. , vol.9 , Issue.4 , pp. 343-353
    • Ward, S.C.1    Curtis, B.2    Chapman, C.B.3
  • 43
    • 0002123922 scopus 로고    scopus 로고
    • Enterprise resource planning: The role of the CIO and its function in ERP
    • 10.1145/332051.332065
    • Willcocks, L., and Sykes, R. (2002). " Enterprise resource planning: The role of the CIO and its function in ERP.." Comm. ACM, 43 (4), 32-38. 10.1145/332051.332065
    • (2002) Comm. ACM , vol.43 , Issue.4 , pp. 32-38
    • Willcocks, L.1    Sykes, R.2
  • 44
    • 34249724520 scopus 로고    scopus 로고
    • Selection of an ERP system for a construction firm in Taiwan: A case study
    • DOI 10.1016/j.autcon.2007.02.001, PII S0926580507000209
    • Yang, J. -B., Wu, C. -T., and Tsai, C. -H. (2007). " Selection of an ERP system for a construction firm in Taiwan: A case study.." Autom. Constr. 0926-5805, 16 (6), 787-796. 10.1016/j.autcon.2007.02.001 (Pubitemid 46839174)
    • (2007) Automation in Construction , vol.16 , Issue.6 , pp. 787-796
    • Yang, J.-B.1    Wu, C.-T.2    Tsai, C.-H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.