메뉴 건너뛰기




Volumn 35, Issue 2, 2007, Pages 143-151

Scheduling in an assembly-type production chain with batch transfer

Author keywords

Batch scheduling; Heuristics; Makespan; NP hardness; Two stage flowshop

Indexed keywords

ASSEMBLY; HARDNESS; JOB SHOP SCHEDULING; POLYNOMIAL APPROXIMATION; SCHEDULING ALGORITHMS; SUPPLY CHAIN MANAGEMENT;

EID: 33748265082     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2005.04.004     Document Type: Article
Times cited : (35)

References (24)
  • 1
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson S.M. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1 (1954) 61-67
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-67
    • Johnson, S.M.1
  • 3
    • 0031212608 scopus 로고    scopus 로고
    • Flowshop scheduling/sequencing research: a statistical review of the literature, 1952-1994
    • Reisman A., Kumar A., and Motwani J. Flowshop scheduling/sequencing research: a statistical review of the literature, 1952-1994. IEEE Transactions on Engineering Management 44 (1997) 316-329
    • (1997) IEEE Transactions on Engineering Management , vol.44 , pp. 316-329
    • Reisman, A.1    Kumar, A.2    Motwani, J.3
  • 4
    • 0027590319 scopus 로고
    • Minimizing makespan in the 3-machine assembly-type flowshop scheduling problem
    • Lee C.Y., Cheng T.C.E., and Lin B.M.T. Minimizing makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science 39 (1993) 616-625
    • (1993) Management Science , vol.39 , pp. 616-625
    • Lee, C.Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 7
    • 0037402009 scopus 로고    scopus 로고
    • Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
    • Sun X., Morizawa K., and Nagasawa H. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling. European Journal of Operational Research 146 (2003) 498-516
    • (2003) European Journal of Operational Research , vol.146 , pp. 498-516
    • Sun, X.1    Morizawa, K.2    Nagasawa, H.3
  • 8
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing a review of algorithms and complexity
    • Potts C.N., and van Wassenhove L.N. Integrating scheduling with batching and lot-sizing a review of algorithms and complexity. Journal of the Operational Research Society 43 (1992) 95-406
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 95-406
    • Potts, C.N.1    van Wassenhove, L.N.2
  • 9
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • Webster S., and Baker K.R. Scheduling groups of jobs on a single machine. Operations Research 43 (1995) 692-703
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 10
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi T., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup considerations. Omega 27 (1999) 219-239
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, T.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 13
    • 0026898494 scopus 로고
    • Efficient algorithms for scheduling semiconductor burn-in operations
    • Lee C.Y., Uzsoy R., and Martin-Vega L.A. Efficient algorithms for scheduling semiconductor burn-in operations. Operations Research 40 (1992) 764-775
    • (1992) Operations Research , vol.40 , pp. 764-775
    • Lee, C.Y.1    Uzsoy, R.2    Martin-Vega, L.A.3
  • 14
    • 0001507294 scopus 로고
    • Batching and scheduling jobs on batch and discrete processors
    • Ahmadi J.H., Ahmadi R.H., Dasu S., and Tang C.S. Batching and scheduling jobs on batch and discrete processors. Operations Research 39 (1992) 750-763
    • (1992) Operations Research , vol.39 , pp. 750-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 15
    • 40849105768 scopus 로고
    • The complexity of one-machine batching problems
    • Albers S., and Brucker P. The complexity of one-machine batching problems. Discrete Applied Mathematics 47 (1993) 87-107
    • (1993) Discrete Applied Mathematics , vol.47 , pp. 87-107
    • Albers, S.1    Brucker, P.2
  • 17
    • 0022132659 scopus 로고
    • Batching in single operation manufacturing systems
    • Santos C.A., and Magazine M.J. Batching in single operation manufacturing systems. Operations Research Letters 4 (1985) 99-103
    • (1985) Operations Research Letters , vol.4 , pp. 99-103
    • Santos, C.A.1    Magazine, M.J.2
  • 18
    • 0032069909 scopus 로고    scopus 로고
    • Batching and scheduling to minimize the makespan in the two-machine flowshop
    • Cheng T.C.E., and Wang Q. Batching and scheduling to minimize the makespan in the two-machine flowshop. IIE Transactions 30 (1998) 447-453
    • (1998) IIE Transactions , vol.30 , pp. 447-453
    • Cheng, T.C.E.1    Wang, Q.2
  • 19
    • 0034159731 scopus 로고    scopus 로고
    • Makespan minimization in the two-machine flowshop batch scheduling problem
    • Cheng T.C.E., Lin B.M.T., and Toker A. Makespan minimization in the two-machine flowshop batch scheduling problem. Naval Research Logistics 47 (2001) 128-144
    • (2001) Naval Research Logistics , vol.47 , pp. 128-144
    • Cheng, T.C.E.1    Lin, B.M.T.2    Toker, A.3
  • 20
    • 0346452841 scopus 로고    scopus 로고
    • Scheduling batches with sequential job processing for two-machine flow and open shops
    • Glass C.A., Potts C.N., and Strusevich V.A. Scheduling batches with sequential job processing for two-machine flow and open shops. INFORMS Journal on Computing 13 (2001) 120-137
    • (2001) INFORMS Journal on Computing , vol.13 , pp. 120-137
    • Glass, C.A.1    Potts, C.N.2    Strusevich, V.A.3
  • 24
    • 2342637118 scopus 로고    scopus 로고
    • Lot streaming with supplier-manufacturer coordination
    • Li C.-L., and Xiao W.-Q. Lot streaming with supplier-manufacturer coordination. Naval Research Logistics 51 (2004) 467-631
    • (2004) Naval Research Logistics , vol.51 , pp. 467-631
    • Li, C.-L.1    Xiao, W.-Q.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.