-
1
-
-
0003727195
-
-
John Wiley and Sons, New York, NY
-
Ahuja, H.N., Dozzi, S.P. and AbouRizk, S.M. (1994), Project Management: Techniques in Planning and Controlling Construction Projects, 2nd ed., John Wiley and Sons, New York, NY.
-
(1994)
Project Management: Techniques in Planning and Controlling Construction Projects, 2nd Ed.
-
-
Ahuja, H.N.1
Dozzi, S.P.2
Abourizk, S.M.3
-
2
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
Akinci, B., Fischer, M. and Kunz, J. (2002), "Automated generation of work spaces required by construction activities", Journal of Construction Engineering and Management, Vol.128 No.4, pp. 306-315
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
3
-
-
0004278233
-
-
McGraw-Hill International, Singapore
-
Callahan, M.T., Quackenbush, D.G. and Rowings, J.E. (1992), Construction Project Scheduling, McGraw-Hill International, Singapore.
-
(1992)
Construction Project Scheduling
-
-
Callahan, M.T.1
Quackenbush, D.G.2
Rowings, J.E.3
-
4
-
-
84993029182
-
4DCAD-Safety: Visualizing project scheduling and safety planning
-
Chantawit, D., Hadikusumo, B.H.W., Charoenngam, C. and Rowlinson, S. (2005), "4DCAD-Safety: Visualizing project scheduling and safety planning", Construction Innovation, Vol.5 No.2, pp. 99-114.
-
(2005)
Construction Innovation
, vol.5
, Issue.2
, pp. 99-114
-
-
Chantawit, D.1
Hadikusumo, B.H.W.2
Charoenngam, C.3
Rowlinson, S.4
-
5
-
-
14544269170
-
4D dynamic construction management and visualization software: 1. Development
-
DOI 10.1016/j.autcon.2004.11.002, PII S0926580504001293, 20th International Symposium on Automation and Robotics in Construction: The Future Site
-
Chau, K.W., Anson, M. and Zhang, J.P. (2005), "4D dynamic construction management and visualization software: 1. Development", Automation in Construction, Vol.14 No.4, pp. 512-524 (Pubitemid 40307840)
-
(2005)
Automation in Construction
, vol.14
, Issue.4
, pp. 512-524
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
7
-
-
0037332742
-
Development of an integrated information resource base for 4D/VR construction processes simulation
-
Dawood, N., Sriprasert, E., Mallasi, Z. and Hobbs, B. (2002), "Development of an integrated information resource base for 4D/VR construction processes simulation", Automation in Construction, Vol.12 No.2, pp. 123-131
-
(2002)
Automation in Construction
, vol.12
, Issue.2
, pp. 123-131
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
8
-
-
1842831514
-
-
Prentice Hall, Englewood Cliffs, NJ
-
Hinze, J.W. (2003), Construction Planning and Scheduling, 2nd ed., Prentice Hall, Englewood Cliffs, NJ.
-
(2003)
Construction Planning and Scheduling, 2nd Ed.
-
-
Hinze, J.W.1
-
9
-
-
34147115212
-
A Virtual prototyping system for simulating construction processes
-
Huang, T., Kong, C.W., Guo, H.L., Baldwin, A. and Li, H. (2007), "A Virtual prototyping system for simulating construction processes", Automation in Construction, Vol.16 No.5, pp. 576-585
-
(2007)
Automation in Construction
, vol.16
, Issue.5
, pp. 576-585
-
-
Huang, T.1
Kong, C.W.2
Guo, H.L.3
Baldwin, A.4
Li, H.5
-
10
-
-
33846023352
-
A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
-
Jongeling, R. and Olofsson, T. (2007), "A method for planning of work-flow by combined use of location-based scheduling and 4D CAD", Automation in Construction, Vol.16 No.2, pp. 189-198
-
(2007)
Automation in Construction
, vol.16
, Issue.2
, pp. 189-198
-
-
Jongeling, R.1
Olofsson, T.2
-
11
-
-
0035482195
-
Visualizing simulated construction operations in 3D
-
Kamat, V.R. and Martinez, J.C. (2001), "Visualizing simulated construction operations in 3D", Journal of Computing in Civil Engineering, Vol.15 No.4, pp. 329-337
-
(2001)
Journal of Computing in Civil Engineering
, vol.15
, Issue.4
, pp. 329-337
-
-
Kamat, V.R.1
Martinez, J.C.2
-
12
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
Koo, B. and Fischer, M. (2000), "Feasibility study of 4D CAD in commercial construction", Journal of Construction Engineering and Management, Vol.126 No.4, pp. 251-260
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
13
-
-
45949103855
-
Integrating design and construction through virtual prototyping
-
Li, H., Huang, T., Kong, C.W., Guo, H.L., Baldwin, A., Chan, N. and Wong, J. (2008), "Integrating design and construction through virtual prototyping", Automation in Construction, Vol.17 No.8, pp. 915-922
-
(2008)
Automation in Construction
, vol.17
, Issue.8
, pp. 915-922
-
-
Li, H.1
Huang, T.2
Kong, C.W.3
Guo, H.L.4
Baldwin, A.5
Chan, N.6
Wong, J.7
-
14
-
-
0032165225
-
Generating, evaluating and visualizing construction schedules with CAD tools
-
McKinney, K. and Fischer, M. (1998), "Generating, evaluating and visualizing construction schedules with CAD tools", Automation in Construction, Vol.7 No.6, pp. 433-447
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
15
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
Ma, Z., Shen, Q. and Zhang, J. (2005), "Application of 4D for dynamic site layout and management of construction projects", Automation in Construction, Vol.14 No.3, pp. 369-381
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 369-381
-
-
Ma, Z.1
Shen, Q.2
Zhang, J.3
-
16
-
-
84898273611
-
Next generation of construction planning and control system: The LEWIS approach
-
Sriprasert, E. and Dawood, N. (2002), "Next generation of construction planning and control system: the LEWIS approach", Proceedings of the 10th Annual Conference of the International Group of Lean Construction, August 6-8, Gramado, Brazil.
-
(2002)
Proceedings of the 10th Annual Conference of the International Group of Lean Construction, August 6-8, Gramado, Brazil
-
-
Sriprasert, E.1
Dawood, N.2
-
18
-
-
3142565144
-
4D Dynamic management for construction planning and resource utilization
-
Wang, H.J., Zhang, J.P., Chau, K.W. and Anson, M. (2004), "4D Dynamic management for construction planning and resource utilization", Automation in Construction, Vol.13 No.5, pp. 575-589
-
(2004)
Automation in Construction
, vol.13
, Issue.5
, pp. 575-589
-
-
Wang, H.J.1
Zhang, J.P.2
Chau, K.W.3
Anson, M.4
|