메뉴 건너뛰기




Volumn 16, Issue 4, 2009, Pages 392-408

Enhancing visualization of 4D CAD model compared to conventional methods

Author keywords

Business planning; Computer aided design; Construction operations; Simulation

Indexed keywords

BUSINESS PLANNING; CAD MODELS; CONSTRUCTION OPERATIONS; CONSTRUCTION PROJECTS; CONSTRUCTION SCHEDULES; CONVENTIONAL METHODS; DESIGN/METHODOLOGY/APPROACH; GANTT CHART; MODEL EVALUATION; SIMULATION; SPATIAL CONSTRAINTS; VISUAL PROPERTIES;

EID: 70249133368     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980910970860     Document Type: Article
Times cited : (18)

References (18)
  • 2
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • Akinci, B., Fischer, M. and Kunz, J. (2002), "Automated generation of work spaces required by construction activities", Journal of Construction Engineering and Management, Vol.128 No.4, pp. 306-315
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 5
    • 14544269170 scopus 로고    scopus 로고
    • 4D dynamic construction management and visualization software: 1. Development
    • DOI 10.1016/j.autcon.2004.11.002, PII S0926580504001293, 20th International Symposium on Automation and Robotics in Construction: The Future Site
    • Chau, K.W., Anson, M. and Zhang, J.P. (2005), "4D dynamic construction management and visualization software: 1. Development", Automation in Construction, Vol.14 No.4, pp. 512-524 (Pubitemid 40307840)
    • (2005) Automation in Construction , vol.14 , Issue.4 , pp. 512-524
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 7
    • 0037332742 scopus 로고    scopus 로고
    • Development of an integrated information resource base for 4D/VR construction processes simulation
    • Dawood, N., Sriprasert, E., Mallasi, Z. and Hobbs, B. (2002), "Development of an integrated information resource base for 4D/VR construction processes simulation", Automation in Construction, Vol.12 No.2, pp. 123-131
    • (2002) Automation in Construction , vol.12 , Issue.2 , pp. 123-131
    • Dawood, N.1    Sriprasert, E.2    Mallasi, Z.3    Hobbs, B.4
  • 9
    • 34147115212 scopus 로고    scopus 로고
    • A Virtual prototyping system for simulating construction processes
    • Huang, T., Kong, C.W., Guo, H.L., Baldwin, A. and Li, H. (2007), "A Virtual prototyping system for simulating construction processes", Automation in Construction, Vol.16 No.5, pp. 576-585
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 10
    • 33846023352 scopus 로고    scopus 로고
    • A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
    • Jongeling, R. and Olofsson, T. (2007), "A method for planning of work-flow by combined use of location-based scheduling and 4D CAD", Automation in Construction, Vol.16 No.2, pp. 189-198
    • (2007) Automation in Construction , vol.16 , Issue.2 , pp. 189-198
    • Jongeling, R.1    Olofsson, T.2
  • 11
  • 12
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • Koo, B. and Fischer, M. (2000), "Feasibility study of 4D CAD in commercial construction", Journal of Construction Engineering and Management, Vol.126 No.4, pp. 251-260
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 14
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with CAD tools
    • McKinney, K. and Fischer, M. (1998), "Generating, evaluating and visualizing construction schedules with CAD tools", Automation in Construction, Vol.7 No.6, pp. 433-447
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 15
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • Ma, Z., Shen, Q. and Zhang, J. (2005), "Application of 4D for dynamic site layout and management of construction projects", Automation in Construction, Vol.14 No.3, pp. 369-381
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 18
    • 3142565144 scopus 로고    scopus 로고
    • 4D Dynamic management for construction planning and resource utilization
    • Wang, H.J., Zhang, J.P., Chau, K.W. and Anson, M. (2004), "4D Dynamic management for construction planning and resource utilization", Automation in Construction, Vol.13 No.5, pp. 575-589
    • (2004) Automation in Construction , vol.13 , Issue.5 , pp. 575-589
    • Wang, H.J.1    Zhang, J.P.2    Chau, K.W.3    Anson, M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.