Multi-objective optimization of resource scheduling in construction projects

Author keywords

[No Author keywords available]

Indexed keywords

APPLICATION EXAMPLES; CONSTRUCTION PRODUCTIVITY; CONSTRUCTION PROJECTS; MULTI-OBJECTIVE OPTIMIZATION MODELS; NEGATIVE IMPACTS; OPTIMAL TRADEOFFS; PROJECT DURATION; RESOURCE AVAILABILITY; RESOURCE LEVELING; RESOURCE UTILIZATIONS; RESOURCE-SCHEDULING;

EID: 69949101074     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41020(339)82     Document Type: Conference Paper
Times cited : (6)

References (11)
  • 1
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • ASCE
    • Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., ASCE, 122(2), 125- 132.
    • (1996) J. Constr. Eng. Manage , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.T.1    Chua, D.K.H.2    Kannan, G.3
  • 2
    • 0345615422 scopus 로고    scopus 로고
    • Scheduling with co-evolving resource availability profiles
    • Chua D. K. H., Chan W. T., and Govindan K. (1996). "Scheduling with Co-evolving Resource Availability Profiles", J. Civil Eng. Systems, 13(4), 311-329.
    • (1996) J. Civil Eng. Systems , vol.13 , Issue.4 , pp. 311-329
    • Chua, D.K.H.1    Chan, W.T.2    Govindan, K.3
  • 5
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • ASCE
    • Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., ASCE, 125(3), 167-175.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 6
    • 0002866635 scopus 로고
    • in: J.F. Muth and G. L. Thompson (Eds.), Industrial Scheduling, Prentice-Hall, New Jersey
    • Kelly, J. E. (1963). "The Critical-path Method: Resource Planning and Scheduling", in: J.F. Muth and G. L. Thompson (Eds.), Industrial Scheduling, Prentice-Hall, New Jersey, 347-365.
    • (1963) The Critical-path Method: Resource Planning and Scheduling , pp. 347-365
    • Kelly, J.E.1
  • 7
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • ASCE
    • Leu, S. S., and Yang, C. H. (1999). "GA-based multicriteria optimal model for construction scheduling." J. Constr. Eng. Manage., ASCE, 125(6), 420-427.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.S.1    Yang, C.H.2
  • 9
    • 0026219084 scopus 로고
    • Time-constrained resource leveling
    • ASCE
    • Seibert, J., and Evans, G. (1991) "Time-constrained resource leveling" J. Constr. Eng. Manage., ASCE, 117(3), 503-520.
    • (1991) J. Constr. Eng. Manage , vol.117 , Issue.3 , pp. 503-520
    • Seibert, J.1    Evans, G.2
  • 10
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • ASCE
    • Senouci, A. B., and Eldin, N. N. (2004) "Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., ASCE, 130(6), 869- 877.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.