메뉴 건너뛰기




Volumn 37, Issue 2, 2010, Pages 368-375

Modelling and a segmented dynamic programming-based heuristic approach for the slab stack shuffling problem

Author keywords

Crane workload; Heuristic; Segmented dynamic programming; Slab stack shuffling

Indexed keywords

HEURISTIC; HEURISTIC APPROACH; INTEGER PROGRAMMING MODELS; LOCAL SIMILARITY; LOGISTICS PROBLEMS; NEW POSITION; OPTIMAL SOLUTIONS; OPTIMIZERS; SEGMENTED DYNAMIC PROGRAMMING; SLAB STACK SHUFFLING; SLAB YARD; SOLUTION QUALITY; SPEED-UPS; STEEL INDUSTRY; STORAGE AREA; SUB-PROBLEMS;

EID: 69549095832     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2009.05.011     Document Type: Article
Times cited : (47)

References (14)
  • 1
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research 133 (2001) 1-20
    • (2001) European Journal of Operational Research , vol.133 , pp. 1-20
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 3
    • 0001110087 scopus 로고    scopus 로고
    • Integration of continuous caster and hot strip mill planning for steel production
    • Cowling P., and Rezig W. Integration of continuous caster and hot strip mill planning for steel production. Journal of Scheduling 3 (2000) 185-208
    • (2000) Journal of Scheduling , vol.3 , pp. 185-208
    • Cowling, P.1    Rezig, W.2
  • 4
    • 0035494053 scopus 로고    scopus 로고
    • An effective heuristic algorithm to minimise stack shuffle in selecting steel slabs from the slab yard for heating and rolling
    • Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. An effective heuristic algorithm to minimise stack shuffle in selecting steel slabs from the slab yard for heating and rolling. Journal of Operational Research Society 52 (2001) 1091-1097
    • (2001) Journal of Operational Research Society , vol.52 , pp. 1091-1097
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 5
    • 0037053021 scopus 로고    scopus 로고
    • Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules
    • Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules. International Journal of Production Research 40 7 (2002) 1083-1095
    • (2002) International Journal of Production Research , vol.40 , Issue.7 , pp. 1083-1095
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 6
    • 4043079775 scopus 로고    scopus 로고
    • Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved Parallel Genetic Algorithms
    • Singh K.A., Srinivas, and Tiwari M.K. Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved Parallel Genetic Algorithms. International Journal of Production Economics 91 (2004) 135-147
    • (2004) International Journal of Production Economics , vol.91 , pp. 135-147
    • Singh, K.A.1    Srinivas2    Tiwari, M.K.3
  • 8
    • 33748748716 scopus 로고    scopus 로고
    • Warehouse sequencing in the steel supply chain as a generalized job shop model
    • Zäpfel G., and Wasner M. Warehouse sequencing in the steel supply chain as a generalized job shop model. International Journal of Production Economics 104 (2006) 482-501
    • (2006) International Journal of Production Economics , vol.104 , pp. 482-501
    • Zäpfel, G.1    Wasner, M.2
  • 9
    • 58149234206 scopus 로고    scopus 로고
    • A neighborhood search heuristic for pre-marshalling export containers
    • Lee Y., and Chao S.L. A neighborhood search heuristic for pre-marshalling export containers. European Journal of Operational Research 196 (2009) 468-475
    • (2009) European Journal of Operational Research , vol.196 , pp. 468-475
    • Lee, Y.1    Chao, S.L.2
  • 11
    • 27744472696 scopus 로고    scopus 로고
    • An effective optimization-based algorithm for job shop scheduling with fixed-size transfer lots
    • Jin B., Luh P.B., and Thakur L.S. An effective optimization-based algorithm for job shop scheduling with fixed-size transfer lots. Journal of Manufacturing Systems 18 4 (1999) 284-300
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 284-300
    • Jin, B.1    Luh, P.B.2    Thakur, L.S.3
  • 12
    • 33846569020 scopus 로고    scopus 로고
    • Hybrid backward and forward dynamic programming based Lagrangian relaxation for single machine scheduling
    • Tang L.X., Xuan H., and Liu J.Y. Hybrid backward and forward dynamic programming based Lagrangian relaxation for single machine scheduling. Computers & Operations Research 34 9 (2007) 2625-2636
    • (2007) Computers & Operations Research , vol.34 , Issue.9 , pp. 2625-2636
    • Tang, L.X.1    Xuan, H.2    Liu, J.Y.3
  • 13
    • 55149094562 scopus 로고    scopus 로고
    • A dynamic programming based heuristic for the assembly line balancing problem
    • Bautista J., and Pereira J. A dynamic programming based heuristic for the assembly line balancing problem. European Journal of Operational Research 194 3 (2009) 787-794
    • (2009) European Journal of Operational Research , vol.194 , Issue.3 , pp. 787-794
    • Bautista, J.1    Pereira, J.2
  • 14
    • 10444233579 scopus 로고    scopus 로고
    • Crane scheduling in container yards with inter-crane interference
    • NG W.C. Crane scheduling in container yards with inter-crane interference. European Journal of Operational Research 164 (2005) 64-78
    • (2005) European Journal of Operational Research , vol.164 , pp. 64-78
    • NG, W.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.