An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling

Author keywords

Heuristics; Iron and steel industry; Material handling; Slab stack shuffling

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; HOT ROLLING; IRON AND STEEL INDUSTRY; OPTIMIZATION; SLAB MILLS; STEELMAKING;

EID: 0035494053     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601143     Document Type: Article
Times cited : (36)

References (9)
  • 1
    • 0023843528 scopus 로고
    • A scheduling model for LTV steel’s Cleveland works twin-strand continuous slab caster
    • Box RE and Herbe DG (1988). A scheduling model for LTV steel’s Cleveland works twin-strand continuous slab caster. Inter¬face 18: 42-56.
    • (1988) Interface , vol.18 , pp. 42-56
    • Box, R.E.1    Herbe, D.G.2
  • 2
    • 0030102183 scopus 로고    scopus 로고
    • Primary production scheduling at steelmaking industries
    • Lee HS, Murthy SS, Haider SW and Morse DW (1996). Primary production scheduling at steelmaking industries. IBM J Res Dev 40: 231-252.
    • (1996) IBM J Res Dev , vol.40 , pp. 231-252
    • Lee, H.S.1    Murthy, S.S.2    Haider, S.W.3    Morse, D.W.4
  • 3
    • 0033892353 scopus 로고    scopus 로고
    • A mathematical programming model for scheduling steelmaking—continuous casting production
    • Tang L, Liu J, Rong A and Yang Z (2000). A mathematical programming model for scheduling steelmaking—continuous casting production. Eur J Opl Res 120: 423-435.
    • (2000) Eur J Opl Res , vol.120 , pp. 423-435
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 4
    • 0024169130 scopus 로고
    • Optimal inter-process steel production scheduling
    • Jacobs TL and Wright JR (1988). Optimal inter-process steel production scheduling. Comp Opns Res 15: 497-507.
    • (1988) Comp Opns Res , vol.15 , pp. 497-507
    • Jacobs, T.L.1    Wright, J.R.2
  • 5
    • 0026880377 scopus 로고
    • Discrete event sequencing as a traveling salesman problem
    • Kosiba ED and Wright JR (1992). Discrete event sequencing as a traveling salesman problem. Comp Indust 19: 317-327.
    • (1992) Comp Indust , vol.19 , pp. 317-327
    • Kosiba, E.D.1    Wright, J.R.2
  • 6
    • 0033741404 scopus 로고    scopus 로고
    • A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron and Steel Complex
    • Tang L, Liu J, Rong A and Yang Z (2000). A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron and Steel Complex. Eur J Opl Res 124: 267-282.
    • (2000) Eur J Opl Res , vol.124 , pp. 267-282
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 7
    • 0033123629 scopus 로고    scopus 로고
    • Computer optimized control of reheating furnace for hot strip mill
    • Chen H et al (1999). Computer optimized control of reheating furnace for hot strip mill. Iron Steel 34: 33, 57-60.
    • (1999) Iron Steel , vol.34 , Issue.33 , pp. 57-60
    • Chen, H.1
  • 8
    • 0032131634 scopus 로고    scopus 로고
    • Application of neural network to the supervisory control of a reheating furnace in the steel industry
    • Kim YI et al (1998). Application of neural network to the supervisory control of a reheating furnace in the steel industry. Control Engng Prac 6: 1009-1014.
    • (1998) Control Engng Prac , vol.6 , pp. 1009-1014
    • Kim, Y.I.1
  • 9
    • 0031078123 scopus 로고    scopus 로고
    • Steel scheduling schedule generation
    • Assaf I, Chen M and Katzberg J (1997). Steel scheduling schedule generation. Int J Prod Res 35: 467-477.
    • (1997) Int J Prod Res , vol.35 , pp. 467-477
    • Assaf, I.1    Chen, M.2    Katzberg, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.