메뉴 건너뛰기




Volumn 36, Issue 10, 2009, Pages 12095-12103

A GA methodology for the scheduling of yarn-dyed textile production

Author keywords

Genetic algorithm; Group delivery; Multi stage; Scheduling; Sequence dependent setup; Textile

Indexed keywords

CUSTOMER ORDERS; EARLIEST DUE DATES; GROUP-DELIVERY; HIERARCHICAL PRODUCT; MIXED INTEGER PROGRAMMING MODEL; MULTI-STAGE; NUMERICAL EXPERIMENTS; PROBLEM COMPLEXITY; SCHEDULING METHODS; SCHEDULING PROBLEM; SEQUENCE-DEPENDENT SETUP; SEQUENCE-DEPENDENT SETUP TIME; SUB-PROBLEMS; TEXTILE MANUFACTURING; TEXTILE PRODUCTION; TOTAL TARDINESS;

EID: 69249229616     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2009.04.075     Document Type: Article
Times cited : (36)

References (22)
  • 3
    • 13844298234 scopus 로고    scopus 로고
    • Scheduling injection modeling operations with multiple resource constraints and sequence dependent setup times and costs
    • Dastidar S.G., and Nagi R. Scheduling injection modeling operations with multiple resource constraints and sequence dependent setup times and costs. Computer and Operations Research 32 (2005) 2987-3005
    • (2005) Computer and Operations Research , vol.32 , pp. 2987-3005
    • Dastidar, S.G.1    Nagi, R.2
  • 4
    • 0029546059 scopus 로고
    • Expert system support in the textile industry: End product production planning decision
    • Ford F.N., and Rager J. Expert system support in the textile industry: End product production planning decision. Expert Systems With Applications 9 2 (1995) 237-246
    • (1995) Expert Systems With Applications , vol.9 , Issue.2 , pp. 237-246
    • Ford, F.N.1    Rager, J.2
  • 6
    • 33747786647 scopus 로고    scopus 로고
    • Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry
    • Guo Z.X., Wong W.K., Leung S.Y.S., Fan J.T., and Chan S.F. Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry. Computer and Industrial Engineering 50 (2006) 202-219
    • (2006) Computer and Industrial Engineering , vol.50 , pp. 202-219
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4    Chan, S.F.5
  • 7
    • 0030245882 scopus 로고    scopus 로고
    • Production planning and control in textile industry: A case study
    • Karacapilidis N.I., and Pappis C.P. Production planning and control in textile industry: A case study. Computers in Industry 30 (1996) 127-144
    • (1996) Computers in Industry , vol.30 , pp. 127-144
    • Karacapilidis, N.I.1    Pappis, C.P.2
  • 8
    • 0346937284 scopus 로고    scopus 로고
    • Job scheduling with dual criteria and sequence-dependent setup: Mathematical versus genetic programming
    • Lee S.M., and Asllani A.A. Job scheduling with dual criteria and sequence-dependent setup: Mathematical versus genetic programming. Omega 32 (2004) 145-153
    • (2004) Omega , vol.32 , pp. 145-153
    • Lee, S.M.1    Asllani, A.A.2
  • 9
    • 0030385516 scopus 로고    scopus 로고
    • Scheduling flexible flow shops with sequence-dependent setup effect, decision and control
    • Liu, C.-Y. (1996). Scheduling flexible flow shops with sequence-dependent setup effect, decision and control. In Proceedings of the 35th IEEE conference (Vol. 2, pp. 1757-1762).
    • (1996) Proceedings of the 35th IEEE conference , vol.2 , pp. 1757-1762
    • Liu, C.-Y.1
  • 10
    • 33845466214 scopus 로고    scopus 로고
    • A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness
    • Luo X., and Chu F. A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness. Applied Mathematics and Computation 183 (2006) 575-588
    • (2006) Applied Mathematics and Computation , vol.183 , pp. 575-588
    • Luo, X.1    Chu, F.2
  • 11
    • 33644772056 scopus 로고    scopus 로고
    • Genetic algorithms for the optimal common due date assignment and optimal scheduling policy in parallel machine earliness/tardiness scheduling problems
    • Min L., and Cheng W. Genetic algorithms for the optimal common due date assignment and optimal scheduling policy in parallel machine earliness/tardiness scheduling problems. Robotics and Computer-Integrated Manufacturing 22 (2006) 279-287
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , pp. 279-287
    • Min, L.1    Cheng, W.2
  • 12
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup time and machines and machine eligibility
    • Ruiz R., and Maroto C. A genetic algorithm for hybrid flowshops with sequence dependent setup time and machines and machine eligibility. European Journal of Operation Research 169 (2006) 781-800
    • (2006) European Journal of Operation Research , vol.169 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 13
    • 12344285964 scopus 로고    scopus 로고
    • Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
    • Ruiz R., Maroto C., and Alcaraz J. Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. European Journal of Operation Research 165 (2005) 34-54
    • (2005) European Journal of Operation Research , vol.165 , pp. 34-54
    • Ruiz, R.1    Maroto, C.2    Alcaraz, J.3
  • 15
    • 0032293326 scopus 로고    scopus 로고
    • Shiroma, P. J., & Niemeyer, G. (1998). Production scheduling in the textile industry: A practical approach using evolutionary algorithms with domain-dependent information. In Proceedings of the 24th annual conference of the IEEE (1, p. 269), Industrial Electronics Society, IECON'98.
    • Shiroma, P. J., & Niemeyer, G. (1998). Production scheduling in the textile industry: A practical approach using evolutionary algorithms with domain-dependent information. In Proceedings of the 24th annual conference of the IEEE (Vol. 1, p. 269), Industrial Electronics Society, IECON'98.
  • 16
    • 0026390491 scopus 로고
    • Computer simulation of textile facilities
    • Sun J., and Chisman J.A. Computer simulation of textile facilities. Systems Engineering (1991) 450-452
    • (1991) Systems Engineering , pp. 450-452
    • Sun, J.1    Chisman, J.A.2
  • 19
    • 0031348249 scopus 로고    scopus 로고
    • A hybrid algorithm for earliness-tardiness scheduling problem with sequence dependent setup time, decision and control
    • Wang, L., & Wang, M. (1997). A hybrid algorithm for earliness-tardiness scheduling problem with sequence dependent setup time, decision and control. In Proceedings of the 36th IEEE conference (Vol. 2, pp. 1219-1222).
    • (1997) Proceedings of the 36th IEEE conference , vol.2 , pp. 1219-1222
    • Wang, L.1    Wang, M.2
  • 20
    • 0034246181 scopus 로고    scopus 로고
    • Optimization of spreading and cutting sequencing model in garment manufacturing
    • Wong W.K., Chan C.K., and Ip W.H. Optimization of spreading and cutting sequencing model in garment manufacturing. Computer in Industry 43 (2000) 1-10
    • (2000) Computer in Industry , vol.43 , pp. 1-10
    • Wong, W.K.1    Chan, C.K.2    Ip, W.H.3
  • 22
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • Zandieh M., Ghomi S.M.T.F., and Husseini S.M.M. An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation 180 (2006) 111-127
    • (2006) Applied Mathematics and Computation , vol.180 , pp. 111-127
    • Zandieh, M.1    Ghomi, S.M.T.F.2    Husseini, S.M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.