메뉴 건너뛰기




Volumn 12, Issue 5, 1996, Pages 789-799

Scheduling flexible manufacturing systems for apparel production

Author keywords

[No Author keywords available]

Indexed keywords

GARMENT MANUFACTURE; LAGRANGE MULTIPLIERS; PRODUCTION; SCHEDULING; SIMULATION;

EID: 0030262527     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/70.538983     Document Type: Article
Times cited : (20)

References (29)
  • 2
    • 0012708009 scopus 로고
    • Hierarchical production planning: Scheduling in the apparel industry
    • M. R. Bowers and A. Agarwal, "Hierarchical production planning: Scheduling in the apparel industry," Int. J. Clothing Sci. Tech., vol. 5, no. 3/4, pp. 36-43, 1993.
    • (1993) Int. J. Clothing Sci. Tech. , vol.5 , Issue.3-4 , pp. 36-43
    • Bowers, M.R.1    Agarwal, A.2
  • 6
    • 0024112269 scopus 로고
    • A recent survey of production scheduling
    • F. A. Rodammer and K. P. White, "A recent survey of production scheduling," IEEE Trans. Syst., Man, Cybern., vol. 18, no. 6, pp. 841-851, 1988.
    • (1988) IEEE Trans. Syst., Man, Cybern. , vol.18 , Issue.6 , pp. 841-851
    • Rodammer, F.A.1    White, K.P.2
  • 7
    • 0024714899 scopus 로고
    • Aggregate scheduling in a flexible machining and assembly system
    • A. Kusiak, "Aggregate scheduling in a flexible machining and assembly system," IEEE Trans. Robot. Automat., vol. 5, no. 4, pp. 451-459, 1989.
    • (1989) IEEE Trans. Robot. Automat. , vol.5 , Issue.4 , pp. 451-459
    • Kusiak, A.1
  • 8
    • 0027599646 scopus 로고
    • Decomposition for scheduling flexible manufacturing systems
    • R. R. Inman and P. C. Jones. "Decomposition for scheduling flexible manufacturing systems," Oper. Res., vol. 41, no. 3, pp. 608-617, 1993.
    • (1993) Oper. Res. , vol.41 , Issue.3 , pp. 608-617
    • Inman, R.R.1    Jones, P.C.2
  • 9
    • 0027595170 scopus 로고
    • Giffler and Thompson's algorithm for job shop scheduling is still good for flexible manufacturing systems
    • M. A. Nascimento, "Giffler and Thompson's algorithm for job shop scheduling is still good for flexible manufacturing systems," J. Oper. Res. Soc., vol. 44, no. 5, pp. 521-524, 1993.
    • (1993) J. Oper. Res. Soc. , vol.44 , Issue.5 , pp. 521-524
    • Nascimento, M.A.1
  • 10
    • 0028255406 scopus 로고
    • A method of flexible scheduling for flexible manufacturing systems
    • J. Choi and K. Hitomi, "A method of flexible scheduling for flexible manufacturing systems," Int. J. Prod. Econ., vol. 33, no. 1-3, pp. 247-255, 1994.
    • (1994) Int. J. Prod. Econ. , vol.33 , Issue.1-3 , pp. 247-255
    • Choi, J.1    Hitomi, K.2
  • 11
    • 0024701172 scopus 로고
    • Simultaneous resource scheduling to minimize weighted flow times
    • G. Dobson and U. S. Karmarkar, "Simultaneous resource scheduling to minimize weighted flow times," Oper. Res., vol. 37, pp. 592-600, 1989.
    • (1989) Oper. Res. , vol.37 , pp. 592-600
    • Dobson, G.1    Karmarkar, U.S.2
  • 12
    • 0026904594 scopus 로고
    • Routing flexibility and production scheduling in a flexible manufacturing system
    • S. Ghosh and C. Gaimon, "Routing flexibility and production scheduling in a flexible manufacturing system," Eur. J. Oper. Res., vol. 60, no. 3, pp. 344-364, 1992.
    • (1992) Eur. J. Oper. Res. , vol.60 , Issue.3 , pp. 344-364
    • Ghosh, S.1    Gaimon, C.2
  • 13
    • 0028766755 scopus 로고
    • Scheduling with resource management in manufacturing systems
    • J. Blazewicz and G. Finke, "Scheduling with resource management in manufacturing systems," Eur. J. Oper. Res., vol. 76, no. 1, pp. 1-14, 1994.
    • (1994) Eur. J. Oper. Res. , vol.76 , Issue.1 , pp. 1-14
    • Blazewicz, J.1    Finke, G.2
  • 14
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using petri nets and heuristic search
    • D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using petri nets and heuristic search," IEEE Trans. Robot. Automat., vol. 10, no. 2, pp. 123-132, 1994.
    • (1994) IEEE Trans. Robot. Automat. , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    Dicesare, F.2
  • 15
    • 0019055358 scopus 로고
    • Two single-machine sequencing problems involving controllable job processing times
    • R. G. Vickson, "Two single-machine sequencing problems involving controllable job processing times," AIEE Trans., vol. 12, pp. 258-262, 1980a.
    • (1980) AIEE Trans. , vol.12 , pp. 258-262
    • Vickson, R.G.1
  • 16
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
    • _, "Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine," Oper. Res., vol. 28, pp. 1155-1167, 1980b.
    • (1980) Oper. Res. , vol.28 , pp. 1155-1167
  • 17
    • 0020177273 scopus 로고
    • A Bicriterion approach to time cost trade-offs in sequencing
    • L. N. Van Wassenhove and K. R. Baker, "A Bicriterion approach to time cost trade-offs in sequencing," Eur. J. Oper. Res., vol. 11, pp. 48-54, 1982.
    • (1982) Eur. J. Oper. Res. , vol.11 , pp. 48-54
    • Van Wassenhove, L.N.1    Baker, K.R.2
  • 18
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • R. L. Daniels and R. K. Sarin, "Single machine scheduling with controllable processing times and number of jobs tardy," Oper. Res., vol. 37, pp. 981-984, 1989.
    • (1989) Oper. Res. , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 19
    • 0025478981 scopus 로고
    • A multi-objective approach to resource allocation in single machine scheduling
    • R. L. Daniels, "A multi-objective approach to resource allocation in single machine scheduling," Eur. J. Oper. Res., vol. 48, pp. 226-241, 1990.
    • (1990) Eur. J. Oper. Res. , vol.48 , pp. 226-241
    • Daniels, R.L.1
  • 20
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • R. L. Daniels and J. B. Mazzola, "Flow shop scheduling with resource flexibility," Oper. Res., vol. 42, no. 3, pp. 504-522, 1994.
    • (1994) Oper. Res. , vol.42 , Issue.3 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 22
    • 0028413489 scopus 로고
    • Scheduling products with bills of materials using an improved lagrangian relaxation technique
    • C. Czerwinski and P. B. Luh, "Scheduling products with bills of materials using an improved lagrangian relaxation technique," IEEE Trans. Robot. Automat., vol. 10, pp. 99-111, 1994.
    • (1994) IEEE Trans. Robot. Automat. , vol.10 , pp. 99-111
    • Czerwinski, C.1    Luh, P.B.2
  • 24
    • 49849127729 scopus 로고
    • Minimization of unsmooth functionals
    • B. T. Polyak, "Minimization of unsmooth functionals," USSR Comput. Math. Phys., vol. 9, pp. 14-29, 1969.
    • (1969) USSR Comput. Math. Phys. , vol.9 , pp. 14-29
    • Polyak, B.T.1
  • 26
    • 0001796318 scopus 로고
    • Bundle methods in nonsmooth optimization
    • Non-smooth Optimization, C. Lemarechal and R. Mifflin, Eds., London: Pergamon
    • C. Lemarechal, "Bundle methods in nonsmooth optimization," in Non-smooth Optimization, C. Lemarechal and R. Mifflin, Eds., Proc. of a IIASA Workshop, London: Pergamon, 1978.
    • (1978) Proc. of a IIASA Workshop
    • Lemarechal, C.1
  • 29
    • 0028419491 scopus 로고
    • Scheduling flexible flow shops with no setup effects
    • S.-C. Chang and D.-Y. Liao, "Scheduling flexible flow shops with no setup effects," IEEE Trans. Robot. Automat., vol. 10, pp. 112-122, 1994.
    • (1994) IEEE Trans. Robot. Automat. , vol.10 , pp. 112-122
    • Chang, S.-C.1    Liao, D.-Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.