메뉴 건너뛰기




Volumn 55, Issue 8, 2009, Pages 2122-2137

Scheduling multistage batch plants with sequence-dependent changeovers

Author keywords

Continuous time; Mathematical modeling; Mixed integer programming; Optimization; Unit specific

Indexed keywords

BATCH PLANTS; CONTINUOUS-TIME; CONTINUOUS-TIME FORMULATION; EVENT POINTS; GLOBAL OPTIMAL SOLUTIONS; INTERMEDIATE STORAGE; MASS BALANCE; MATERIAL TRANSFERS; MATHEMATICAL MODELING; MIXED INTEGER PROGRAMMING; NUMBER AND SIZE; OPTIMAL SELECTION; PROCESSING UNITS; RESEARCH GROUPS; RESOURCE-TASK NETWORKS; SEQUENCE-DEPENDENT; SHORT-TERM SCHEDULING; TIMING CONSTRAINTS; UNIT-SPECIFIC;

EID: 68049118830     PISSN: 00011541     EISSN: 15475905     Source Type: Journal    
DOI: 10.1002/aic.11799     Document Type: Article
Times cited : (19)

References (27)
  • 1
    • 0442264226 scopus 로고    scopus 로고
    • Planning and scheduling in the process industry
    • Kallrath J. Planning and scheduling in the process industry. OR Spectrum. 2002;24:219-250.
    • (2002) OR Spectrum , vol.24 , pp. 219-250
    • Kallrath, J.1
  • 2
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas CA, Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput Chem Eng. 2004;28:2109-2129.
    • (2004) Comput Chem Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 3
    • 33748102266 scopus 로고    scopus 로고
    • Stateof-the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez, CerdáJ, Grossmann IE, Harjunkoski I, Fahl M. Stateof-the-art review of optimization methods for short-term scheduling of batch processes. Comput Chem Eng. 2006;30:913.
    • (2006) Comput Chem Eng. , vol.30 , pp. 913
    • Méndez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 4
    • 0027545176 scopus 로고
    • A general algorithm for shortterm scheduling of batch operations I. MILP formulation
    • Kondili E, Pantelides CC, Sargent R. A general algorithm for shortterm scheduling of batch operations. I. MILP formulation. Comput Chem Eng. 1993;17:211.
    • (1993) Comput Chem Eng. , vol.17 , pp. 211
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.3
  • 6
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling I. Multipurpose batch plants
    • Ierapetritou MG, Floudas CA. Effective continuous-time formulation for short-term scheduling. I. Multipurpose batch plants. Ind Eng Chem Res. 1998;37:4341-4359.
    • (1998) Ind Eng Chem Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 0036568989 scopus 로고    scopus 로고
    • A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes
    • Giannelos NF, Georgiadis MC. A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes. Ind Eng Chem Res. 2002;41:2178-2184.
    • (2002) Ind Eng Chem Res. , vol.41 , pp. 2178-2184
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 8
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time statetask network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias CT, Grossmann IE. New general continuous-time statetask network formulation for short-term scheduling of multipurpose batch plants. Ind Eng Chem Res. 2003;42:3056-3074.
    • (2003) Ind Eng Chem Res. , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 9
    • 0346101524 scopus 로고    scopus 로고
    • Simple continuous-time formulation for short-term scheduling of batch and continuous processes
    • Castro PM, Barbosa-Póvoa AP, Matos HA, Novais AQ. Simple continuous-time formulation for short-term scheduling of batch and continuous processes. Ind Eng Chem Res. 2004;43:105-118.
    • (2004) Ind Eng Chem Res. , vol.43 , pp. 105-118
    • Castro, P.M.1    Barbosa-Póvoa, A.P.2    Matos, H.A.3    Novais, A.Q.4
  • 10
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak SL, Lin X, Floudas CA. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind Eng Chem Res. 2004;43:2516-2533.
    • (2004) Ind Eng Chem Res. , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 11
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A, Karimi IA. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chem Eng Sci. 2005;60:2679-2702.
    • (2005) Chem Eng Sci. , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 12
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework
    • Shaik MA, Floudas CA. Unit-specific event-based continuous-time approach for short-term scheduling of batch plants using RTN framework. Comput Chem Eng. 2008;32:260-274.
    • (2008) Comput Chem Eng. , vol.32 , pp. 260-274
    • Shaik, M.A.1    Floudas, C.A.2
  • 13
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource constrained multistage flowshop batch facilities
    • Méndez CA, Henning GP, CerdáJ. An MILP continuous-time approach to short-term scheduling of resource constrained multistage flowshop batch facilities. Comput Chem Eng. 2001;25:701-711.
    • (2001) Comput Chem Eng. , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 14
    • 0037111002 scopus 로고    scopus 로고
    • Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods
    • Harjunkoski I, Grossmann I. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods. Comput Chem Eng. 2002;26:1533-1552.
    • (2002) Comput Chem Eng. , vol.26 , pp. 1533-1552
    • Harjunkoski, I.1    Grossmann, I.2
  • 16
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for shortterm scheduling of multipurpose batch plants: A comparative study
    • Shaik M, Janak S, Floudas C. Continuous-time models for shortterm scheduling of multipurpose batch plants: a comparative study. Ind Eng Chem Res. 2006;45:6190.
    • (2006) Ind Eng Chem Res. , vol.45 , pp. 6190
    • Shaik, M.1    Janak, S.2    Floudas, C.3
  • 17
    • 29144514680 scopus 로고    scopus 로고
    • New continuous-time MILP model for the short-term scheduling of multistage batch plants
    • Castro PM, Grossmann IE. New continuous-time MILP model for the short-term scheduling of multistage batch plants. Ind Eng Chem Res. 2005;44:9175-9190.
    • (2005) Ind Eng Chem Res. , vol.44 , pp. 9175-9190
    • Castro, P.M.1    Grossmann, I.E.2
  • 18
    • 33846785064 scopus 로고    scopus 로고
    • A scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage
    • Liu Y, Karimi I. A scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage. Chem Eng Sci. 2007;62:1549-1566.
    • (2007) Chem Eng Sci. , vol.62 , pp. 1549-1566
    • Liu, Y.1    Karimi, I.2
  • 19
    • 33748805201 scopus 로고    scopus 로고
    • Two new continuous-time models for the scheduling of multistage batch plants with sequence dependent changeovers
    • Castro PM, Grossmann IE, Novais AQ. Two new continuous-time models for the scheduling of multistage batch plants with sequence dependent changeovers. Ind Eng Chem Res. 2006;45: 6210-6226.
    • (2006) Ind Eng Chem Res. , vol.45 , pp. 6210-6226
    • Castro, P.M.1    Grossmann, I.E.2    Novais, A.Q.3
  • 20
    • 41149128843 scopus 로고    scopus 로고
    • Batch selection, assignment and sequencing in multi-stage, multi-product processes
    • Prasad P, Maravelias CT. Batch selection, assignment and sequencing in multi-stage, multi-product processes. Comput Chem Eng. 2008;32:1114-1127.
    • (2008) Comput Chem Eng. , vol.32 , pp. 1114-1127
    • Prasad, P.1    Maravelias, C.T.2
  • 21
    • 0037419775 scopus 로고    scopus 로고
    • Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage
    • Gupta S, Karimi IA. Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage. Ind Eng Chem Res. 2003;42:490-508.
    • (2003) Ind Eng Chem Res. , vol.42 , pp. 490-508
    • Gupta, S.1    Karimi, I.A.2
  • 22
    • 41749109623 scopus 로고    scopus 로고
    • Simultaneous batching and scheduling in multistage multiproduct processes
    • Sundaramoorthy A, Maravelias CT. Simultaneous batching and scheduling in multistage multiproduct processes. Ind Eng Chem Res. 2008;47:1546-1555.
    • (2008) Ind Eng Chem Res. , vol.47 , pp. 1546-1555
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 23
    • 38149039321 scopus 로고    scopus 로고
    • Simultaneous batching and scheduling of single stage batch plants with parallel units
    • Castro PM, Erdirik-Dogan M, Grossmann IE. Simultaneous batching and scheduling of single stage batch plants with parallel units. AIChE J. 2008;54:183-193.
    • (2008) AIChE J. , vol.54 , pp. 183-193
    • Castro, P.M.1    Erdirik-Dogan, M.2    Grossmann, I.E.3
  • 24
    • 50849099125 scopus 로고    scopus 로고
    • Short-term scheduling of multistage batch plants with unlimited intermediate storage
    • Castro PM, Novais AQ. Short-term scheduling of multistage batch plants with unlimited intermediate storage. Ind Eng Chem Res. 2008;47:6126-6139.
    • (2008) Ind Eng Chem Res. , vol.47 , pp. 6126-6139
    • Castro, P.M.1    Novais, A.Q.2
  • 25
    • 40449111439 scopus 로고    scopus 로고
    • Slot-based formulation for the short-term scheduling of multistage batch plants with sequence-dependent changeovers
    • Erdirik-Dogan M, Grossmann IE. Slot-based formulation for the short-term scheduling of multistage batch plants with sequence-dependent changeovers. Ind Eng Chem Res. 2008;47:1159-1183.
    • (2008) Ind Eng Chem Res. , vol.47 , pp. 1159-1183
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 26
    • 34548483161 scopus 로고    scopus 로고
    • Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units
    • DOI 10.1016/j.compchemeng.2007.02.001, PII S0098135407000294
    • Liu Y, Karimi IA. Novel continuous-time formulations for scheduling multistage batch plants with identical parallel units. Comput Chem Eng. 2007;31:1671-1693. (Pubitemid 47379839)
    • (2007) Computers and Chemical Engineering , vol.31 , Issue.12 , pp. 1671-1693
    • Liu, Y.1    Karimi, I.A.2
  • 27
    • 33846049584 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling
    • DOI 10.1021/ie0600588
    • Janak SL, Floudas CA, Kallrath J, Vormbrock N. Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling. Ind Eng Chem Res. 2006;45:8234-8252. (Pubitemid 46057376)
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , Issue.25 , pp. 8234-8252
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.