메뉴 건너뛰기




Volumn 14, Issue 2, 2009, Pages 81-89

Modular assembly with postponement to improve health, safety, and productivity in construction

Author keywords

Construction industry; Labor; Lean construction; Prefabrication; Productivity; Safety

Indexed keywords

ASSEMBLY TASKS; CHAIN COMPONENTS; CONSTRUCTION SYSTEMS; DESIGN AND DEVELOPMENT; INNOVATIVE METHODS; LABOR; LEAN CONSTRUCTION; MOBILE WORKS; MODULAR ASSEMBLIES; MODULARIZATION; OFF-SITE MANUFACTURING; PREFABRICATION; SAFETY;

EID: 65249125244     PISSN: 10840680     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)1084-0680(2009)14:2(81)     Document Type: Article
Times cited : (35)

References (29)
  • 8
    • 0030558641 scopus 로고    scopus 로고
    • Work organization in lean production and traditional plants - What are the differences?
    • Forza, C. (1996). " Work organisation in lean production and traditional plants-What are the differences? " Int. J. Operat. Product. Manage., 16 (2), 42-62. (Pubitemid 126813946)
    • (1996) International Journal of Operations and Production Management , vol.16 , Issue.2 , pp. 42-62
    • Forza, C.1
  • 9
    • 33644669141 scopus 로고    scopus 로고
    • Mechanisms and rationales for the coordination of a modular assembly system-The case of Volvo cars
    • Fredriksson, P. (2006). " Mechanisms and rationales for the coordination of a modular assembly system-The case of Volvo cars.." Int. J. Operat. Product. Manage., 26 (4), 350-370.
    • (2006) Int. J. Operat. Product. Manage. , vol.26 , Issue.4 , pp. 350-370
    • Fredriksson, P.1
  • 10
    • 65249157586 scopus 로고    scopus 로고
    • Occupational health: Slow accidents need solutions fast
    • D. Fang, R. M. Choudry, and J. W. Hinze, eds., Tsinghua Univ. Press, Beijing.
    • Gibb, A. G. F. (2006). " Occupational health: Slow accidents need solutions fast.." Global Unity for Safety and Health in Construction, Proc., CIBW99 Int. Conf., D. Fang, R. M. Choudry, and, J. W. Hinze, eds., Tsinghua Univ. Press, Beijing, 22-33.
    • (2006) Global Unity for Safety and Health in Construction, Proc., CIBW99 Int. Conf. , pp. 22-33
    • Gibb, A.G.F.1
  • 13
    • 0003814014 scopus 로고    scopus 로고
    • Improving M&E site productivity
    • Building Services Research and Information Association, Bracknell, U.K.
    • Hawkins, G. (1997). " Improving M&E site productivity.." BSRIA Technical Note No. TN 14/97, Building Services Research and Information Association, Bracknell, U.K.
    • (1997) BSRIA Technical Note No. TN 14/97
    • Hawkins, G.1
  • 14
    • 65249189904 scopus 로고    scopus 로고
    • Site productivity-2002: A guide to the uptake of improvements
    • Building Services Research and Information Association, Bracknell, U.K.
    • Hawkins, G. (2002). " Site productivity-2002: A guide to the uptake of improvements.." BSRIA Technical Note No. TN 13/2002, Building Services Research and Information Association, Bracknell, U.K.
    • (2002) BSRIA Technical Note No. TN 13/2002
    • Hawkins, G.1
  • 16
    • 65249083105 scopus 로고    scopus 로고
    • Health and Safety Executive (HSE).. "." 〈〉 (Mar. 4, 2007).
    • Health and Safety Executive (HSE). (2007a). " Better backs in construction.." 〈 http://www.hse.gov.uk/construction/backs/index.htm 〉 (Mar. 4, 2007).
    • (2007) Better Backs in Construction
  • 17
    • 65249157585 scopus 로고    scopus 로고
    • Health and Safety Executive (HSE).. "." 〈〉 (Mar. 4, 2007).
    • Health and Safety Executive (HSE). (2007b). " Health and safety in the construction industry.." 〈 http://www.hse.gov.uk/construction/ index.htm 〉 (Mar. 4, 2007).
    • (2007) Health and Safety in the Construction Industry
  • 18
    • 65249150506 scopus 로고    scopus 로고
    • Health and Safety Executive (HSE).. "." 〈〉 (Mar. 4, 2007).
    • Health and Safety Executive (HSE). (2007c). " Musculoskeletal disorders-HSE and MSD's.." 〈 http://www.hse.gov.uk/msd/hsemsd.htm 〉 (Mar. 4, 2007).
    • (2007) Musculoskeletal Disorders-HSE and MSD's
  • 19
    • 62749118031 scopus 로고    scopus 로고
    • The MRP crusade
    • 2nd Ed., Irwin/McGraw-Hill, New York.
    • Hopp, W. J., and Spearman, M. L. (2001). " The MRP crusade.." Factory physics, 2nd Ed., Irwin/McGraw-Hill, New York, 109-150.
    • (2001) Factory Physics , pp. 109-150
    • Hopp, W.J.1    Spearman, M.L.2
  • 20
    • 33645149003 scopus 로고    scopus 로고
    • Sequence planning for electrical construction
    • Horman, M. J., Orosz, M. P., and Riley, D. R. (2006). " Sequence planning for electrical construction.." J. Constr. Eng. Manage., 132 (4), 363-372.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.4 , pp. 363-372
    • Horman, M.J.1    Orosz, M.P.2    Riley, D.R.3
  • 24
    • 2442716659 scopus 로고    scopus 로고
    • Implications of form postponement to manufacturing: A case study
    • Skipworth, H., and Harrison, A. (2004). " Implications of form postponement to manufacturing: A case study.." Int. J. Prod. Res., 42 (10), 2063-2081.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.10 , pp. 2063-2081
    • Skipworth, H.1    Harrison, A.2
  • 25
  • 26
    • 65249083104 scopus 로고    scopus 로고
    • Product architecture
    • 3rd Ed., McGraw-Hill, New York.
    • Ulrich, K. T., and Eppinger, S. D. (2004). " Product architecture.." Product design and development, 3rd Ed., McGraw-Hill, New York, 163-186.
    • (2004) Product Design and Development , pp. 163-186
    • Ulrich, K.T.1    Eppinger, S.D.2
  • 27
    • 84866070642 scopus 로고    scopus 로고
    • Innovative M&E installation
    • Building Services Research and Information Association, Bracknell, U.K.
    • Wilson, D. (2000). " Innovative M&E installation.." BSRIA ACT No. 9/2000, Building Services Research and Information Association, Bracknell, U.K.
    • (2000) BSRIA ACT No. 9/2000
    • Wilson, D.1
  • 28
    • 33646196837 scopus 로고    scopus 로고
    • Critical space analysis
    • Winch, G. M., and North, S. (2006). " Critical space analysis.." J. Constr. Eng. Manage., 132 (5), 473-481.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 473-481
    • Winch, G.M.1    North, S.2
  • 29
    • 0242364640 scopus 로고    scopus 로고
    • Implications of postponement for the supply chain
    • Yang, B., and Burns, N. (2003). " Implications of postponement for the supply chain.." Int. J. Prod. Res., 41 (9), 2075-2090.
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.9 , pp. 2075-2090
    • Yang, B.1    Burns, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.