-
1
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
2
-
-
0026130973
-
Sequencing knowledge for construction scheduling
-
Echeverry, D., Ibbs, C. W., and Kim, S. (1991). "Sequencing knowledge for construction scheduling." J. Constr. Eng. Manage., 117(1), 118-130.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.1
, pp. 118-130
-
-
Echeverry, D.1
Ibbs, C.W.2
Kim, S.3
-
3
-
-
33645165174
-
Foreman-level sequence planning
-
Penn State University, State College, Pa
-
Horman, M. J., and Salyards, D. (2002). "Foreman-level sequence planning." Proc., 10th Annual PACE Research Seminar, Penn State University, State College, Pa.
-
(2002)
Proc., 10th Annual PACE Research Seminar
-
-
Horman, M.J.1
Salyards, D.2
-
4
-
-
13944280292
-
Knowledge and reasoning for MEP coordination
-
Korman, T. M., Fischer, M. A., and Tatum, C. B. (2003). "Knowledge and reasoning for MEP coordination." J. Constr. Eng. Manage., 129(6), 627-634.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.6
, pp. 627-634
-
-
Korman, T.M.1
Fischer, M.A.2
Tatum, C.B.3
-
5
-
-
13944263588
-
Comparison of linear scheduling model and repetitive scheduling method
-
Matilla, K. G., and Park, A. (2003). "Comparison of linear scheduling model and repetitive scheduling method." J. Constr. Eng. Manage., 129(1), 56-64.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.1
, pp. 56-64
-
-
Matilla, K.G.1
Park, A.2
-
6
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
Riley, D. R., and Sanvido, V. E. (1995). "Patterns of construction-space use in multistory buildings." J. Constr. Eng. Manage., 121(4), 464-473.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
7
-
-
33645132644
-
-
Electrical Contractors Foundation, Bethesda, Md
-
Riley, D. R., Sanvido, V., and Mace, B. (2002). Sequence guidelines for mechanical/electrical contractors, Electrical Contractors Foundation, Bethesda, Md.
-
(2002)
Sequence Guidelines for Mechanical/electrical Contractors
-
-
Riley, D.R.1
Sanvido, V.2
Mace, B.3
-
9
-
-
0034225578
-
Schedule acceleration, work flow, and labor productivity
-
Thomas, H. R. (2000b). "Schedule acceleration, work flow, and labor productivity." J. Constr. Eng. Manage., 126(4), 261-267.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 261-267
-
-
Thomas, H.R.1
-
10
-
-
33645145445
-
Fundamental principles of workforce management
-
Thomas, H. R., and Horman, M. J. (2006). "Fundamental principles of workforce management." J. Constr. Eng. Manage., 132(1), 97-104.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.1
, pp. 97-104
-
-
Thomas, H.R.1
Horman, M.J.2
-
11
-
-
0034271740
-
Role of the fabricator in labor productivity
-
Thomas, H. R., and Sanvido, V. E. (2000). "Role of the fabricator in labor productivity." J. Constr. Eng. Manage., 126(5), 358-365.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.5
, pp. 358-365
-
-
Thomas, H.R.1
Sanvido, V.E.2
-
12
-
-
13944249179
-
Symbiotic crew relationships and labor flow
-
Thomas, H. R., Herman, M. J., and de Souza, U. E. L., (2005). "Symbiotic crew relationships and labor flow." J. Constr. Eng. Manage., 130(6), 908-917.
-
(2005)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 908-917
-
-
Thomas, H.R.1
Herman, M.J.2
De Souza, U.E.L.3
|