메뉴 건너뛰기




Volumn 132, Issue 4, 2006, Pages 363-372

Sequence planning for electrical construction

Author keywords

Construction management; Contractors; Electrical systems; Managers; Planning

Indexed keywords

CONSTRUCTION MANAGEMENT; CONTRACTORS; ELECTRICAL SYSTEMS;

EID: 33645149003     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:4(363)     Document Type: Article
Times cited : (17)

References (12)
  • 1
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 2
    • 0026130973 scopus 로고
    • Sequencing knowledge for construction scheduling
    • Echeverry, D., Ibbs, C. W., and Kim, S. (1991). "Sequencing knowledge for construction scheduling." J. Constr. Eng. Manage., 117(1), 118-130.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.1 , pp. 118-130
    • Echeverry, D.1    Ibbs, C.W.2    Kim, S.3
  • 4
    • 13944280292 scopus 로고    scopus 로고
    • Knowledge and reasoning for MEP coordination
    • Korman, T. M., Fischer, M. A., and Tatum, C. B. (2003). "Knowledge and reasoning for MEP coordination." J. Constr. Eng. Manage., 129(6), 627-634.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.6 , pp. 627-634
    • Korman, T.M.1    Fischer, M.A.2    Tatum, C.B.3
  • 5
    • 13944263588 scopus 로고    scopus 로고
    • Comparison of linear scheduling model and repetitive scheduling method
    • Matilla, K. G., and Park, A. (2003). "Comparison of linear scheduling model and repetitive scheduling method." J. Constr. Eng. Manage., 129(1), 56-64.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.1 , pp. 56-64
    • Matilla, K.G.1    Park, A.2
  • 6
    • 0029470095 scopus 로고
    • Patterns of construction-space use in multistory buildings
    • Riley, D. R., and Sanvido, V. E. (1995). "Patterns of construction-space use in multistory buildings." J. Constr. Eng. Manage., 121(4), 464-473.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 9
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labor productivity
    • Thomas, H. R. (2000b). "Schedule acceleration, work flow, and labor productivity." J. Constr. Eng. Manage., 126(4), 261-267.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 261-267
    • Thomas, H.R.1
  • 10
    • 33645145445 scopus 로고    scopus 로고
    • Fundamental principles of workforce management
    • Thomas, H. R., and Horman, M. J. (2006). "Fundamental principles of workforce management." J. Constr. Eng. Manage., 132(1), 97-104.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.1 , pp. 97-104
    • Thomas, H.R.1    Horman, M.J.2
  • 11
    • 0034271740 scopus 로고    scopus 로고
    • Role of the fabricator in labor productivity
    • Thomas, H. R., and Sanvido, V. E. (2000). "Role of the fabricator in labor productivity." J. Constr. Eng. Manage., 126(5), 358-365.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 358-365
    • Thomas, H.R.1    Sanvido, V.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.