-
1
-
-
84866135994
-
Championship-prefabrication and assembly
-
Elsinore, Denmark, 2004
-
Ballard, G. and Matthews, O., (2004). "Championship-Prefabrication and Assembly". Proceedings of the 12th annual conference of the International Group for Lean Construction, Elsinore, Denmark, 2004.
-
(2004)
Proceedings of the 12th Annual Conference of the International Group for Lean Construction
-
-
Ballard, G.1
Matthews, O.2
-
2
-
-
84866123168
-
Critical flow-towards a construction flow theory
-
Santiago, Chile, 2006
-
Bertelsen, S., Koskela, L., Henrich, G., and Rooke, J., (2006). "Critical Flow-Towards a Construction Flow Theory". Proceedings of the 14th annual conference of the International Group for Lean Construction, Santiago, Chile, 2006.
-
(2006)
Proceedings of the 14th Annual Conference of the International Group for Lean Construction
-
-
Bertelsen, S.1
Koskela, L.2
Henrich, G.3
Rooke, J.4
-
4
-
-
65249141961
-
Lean as an antidote to labour cost escalation on complex mechanical and electrical projects
-
Sydney, Australia, 2005
-
Court, P., Pasquire, C., Gibb, A.G.F., and Bower, D., (2005). "Lean as an Antidote to Labour Cost Escalation on Complex Mechanical and Electrical Projects". Proceedings of the 13th annual conference of the International Group for Lean Construction, Sydney, Australia, 2005.
-
(2005)
Proceedings of the 13th Annual Conference of the International Group for Lean Construction
-
-
Court, P.1
Pasquire, C.2
Gibb, A.G.F.3
Bower, D.4
-
5
-
-
84866120254
-
Design of a lean and agile construction system for a large and complex mechanical and electrical project
-
Santiago, Chile, 2006
-
Court, P., Pasquire, C., Gibb, A.G.F., and Bower, D., (2006). "Design of a Lean and Agile Construction System for a Large and Complex Mechanical and Electrical Project". Proceedings of the 14th annual conference of the International Group for Lean Construction, Santiago, Chile, 2006.
-
(2006)
Proceedings of the 14th Annual Conference of the International Group for Lean Construction
-
-
Court, P.1
Pasquire, C.2
Gibb, A.G.F.3
Bower, D.4
-
6
-
-
33644669141
-
Mechanisms and rationales for the coordination of a modular assembly system-The case of volvo cars
-
Fredriksson, P., (2006). "Mechanisms and Rationales for the Coordination of a Modular Assembly System-The case of Volvo cars". International Journal of Operations and production Management, Vol 26 No. 4 pp 350-370.
-
(2006)
International Journal of Operations and Production Management
, vol.26
, Issue.4
, pp. 350-370
-
-
Fredriksson, P.1
-
7
-
-
0030558641
-
Work organisation in lean production and traditional plants-what are the differences?
-
1996
-
Forza, C., (1996). "Work Organisation in Lean Production and Traditional Plants-What are the differences?" International Journal of Operations Management. Vol. 16. No. 2, 1996. pp 42-62.
-
(1996)
International Journal of Operations Management
, vol.16
, Issue.2
, pp. 42-62
-
-
Forza, C.1
-
8
-
-
0004244246
-
-
Gower Publishing Limited, England
-
Goldratt, E., M., and Cox, J., (2004). The Goal, Gower Publishing Limited, England.
-
(2004)
The Goal
-
-
Goldratt, E.M.1
Cox, J.2
-
11
-
-
13944249179
-
Symbiotic crew relationships and labour flow
-
Thomas, H. R., Horman, M. J., and de Souza, U. E. L., (2005). "Symbiotic crew relationships and labour flow". J. Constr. Eng. Manage., 130(6), 908-917.
-
(2005)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 908-917
-
-
Thomas, H.R.1
Horman, M.J.2
De Souza, U.E.L.3
-
12
-
-
33646196837
-
Critical space analysis
-
Winch, G. M., and North, S., (2006). "Critical space analysis." J. Constr. Eng. Manage., 132(5), 473-481.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 473-481
-
-
Winch, G.M.1
North, S.2
-
13
-
-
0004012172
-
-
Simon and Schuster, UK
-
Womack, J.P. and Jones, D.T., (1996). Lean Thinking, Banish Waste and Create Wealth in your Organisation, Simon and Schuster, UK.
-
(1996)
Lean Thinking, Banish Waste and Create Wealth in Your Organisation
-
-
Womack, J.P.1
Jones, D.T.2
|