Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis
-
eds. R. Slowinski and J. Wȩglarz Elsevier, The Netherlands
-
A. Alvarez-Valdes and J.M. Tamarit, Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis, in: Advances in Project Scheduling, eds. R. Slowinski and J. Wȩglarz (Elsevier, The Netherlands, 1989) pp. 113-134.
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Alvarez-Valdes, A.1
Tamarit, J.M.2
-
2
-
-
84873006043
-
Measuring the impact of re-use on software quality and productivity
-
Department of Computer Science, University of Maryland
-
V.R. Basili, L.C. Briand and W.L. Melo, Measuring the impact of re-use on software quality and productivity, Technical Report, CS-TR-3395, Department of Computer Science, University of Maryland (1995).
-
(1995)
Technical Report, CS-TR-3395
-
-
Basili, V.R.1
Briand, L.C.2
Melo, W.L.3
-
3
-
-
0002719908
-
Fuzzy models - What are they, and why?
-
February
-
J. Bezdek, Fuzzy models - What are they, and why?, IEEE Transactions on Fuzzy Systems 1(1) (February 1993).
-
(1993)
IEEE Transactions on Fuzzy Systems
, vol.1
, Issue.1
-
-
Bezdek, J.1
-
4
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
F.F. Boctor, Heuristics for scheduling projects with resource restrictions and several resource-duration modes, International Journal of Production Research 31 (1993) 2547-2558.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2547-2558
-
-
Boctor, F.F.1
-
6
-
-
0043114388
-
Property based software engineering measurement
-
Department of Computer Science, University of Maryland
-
L.C. Briand, S. Morasca and V.R. Basili, Property based software engineering measurement, Technical Report, CS-TR-3368, Department of Computer Science, University of Maryland (1994).
-
(1994)
Technical Report, CS-TR-3368
-
-
Briand, L.C.1
Morasca, S.2
Basili, V.R.3
-
7
-
-
0031146156
-
A methodology of human factor analysis for systems engineering: Theory and applications
-
P.C. Cacciabue, A methodology of human factor analysis for systems engineering: Theory and applications, IEEE Transactions on Systems, Man and Cybernetics 27 (1997) 325-339.
-
(1997)
IEEE Transactions on Systems, Man and Cybernetics
, vol.27
, pp. 325-339
-
-
Cacciabue, P.C.1
-
9
-
-
0016498438
-
A comparison of heuristics and optimum solutions in resource con-strained project scheduling
-
E.W. Davis and J.H. Patterson, A comparison of heuristics and optimum solutions in resource con-strained project scheduling, Management Science 21 (1975) 944-955.
-
(1975)
Management Science
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
11
-
-
0000463458
-
Minimizing resource availability in time-limited project networks
-
E. Demeulemeester, Minimizing resource availability in time-limited project networks, Management Science 41 (1995) 1590-1598.
-
(1995)
Management Science
, vol.41
, pp. 1590-1598
-
-
Demeulemeester, E.1
-
13
-
-
0023435695
-
Vertex method for computing functions of fuzzy variables
-
W. Dong and H. Shah, Vertex method for computing functions of fuzzy variables, Fuzzy Sets and Systems 24 (1987) 65-78.
-
(1987)
Fuzzy Sets and Systems
, vol.24
, pp. 65-78
-
-
Dong, W.1
Shah, H.2
-
14
-
-
0022189338
-
Fuzzy computations in risk and decision analysis
-
W. Dong, H. Shah and F. Wong, Fuzzy computations in risk and decision analysis, Civil Engineering Systems 2 (1985) 201-208.
-
(1985)
Civil Engineering Systems
, vol.2
, pp. 201-208
-
-
Dong, W.1
Shah, H.2
Wong, F.3
-
15
-
-
0027666457
-
Non-preemptive multi-mode resource constrained project scheduling
-
A. Drexl and J. Grünewald, Non-preemptive multi-mode resource constrained project scheduling, IIE Transactions 25 (1993) 74-81.
-
(1993)
IIE Transactions
, vol.25
, pp. 74-81
-
-
Drexl, A.1
Grünewald, J.2
-
16
-
-
0003987687
-
-
Masson, Paris, France
-
D. Dubois and H. Prade, Theories des Possibilites: Application a la Representation des Connaissances en Informatique, 2nd ed. (Masson, Paris, France, 1987).
-
(1987)
Theories des Possibilites: Application a la Representation des Connaissances en Informatique, 2nd Ed.
-
-
Dubois, D.1
Prade, H.2
-
17
-
-
0026818081
-
In a multi-resource environment how much is enough?
-
J. Dumond, In a multi-resource environment how much is enough?, International Journal of Production Research 30 (1992) 411-443.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 411-443
-
-
Dumond, J.1
-
20
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
P. Fortemps, Jobshop scheduling with imprecise durations: A fuzzy approach, IEEE Transactions on Fuzzy Systems 5 (1997) 557-569.
-
(1997)
IEEE Transactions on Fuzzy Systems
, vol.5
, pp. 557-569
-
-
Fortemps, P.1
-
21
-
-
0026170795
-
Why is software late? An empirical study of reasons for delay in software development
-
M. Genuchten, Why is software late? An empirical study of reasons for delay in software development, IEEE Transactions on Software Engineering 17 (1991) 582-589.
-
(1991)
IEEE Transactions on Software Engineering
, vol.17
, pp. 582-589
-
-
Genuchten, M.1
-
23
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
M. Hapke and R. Slowinski, Fuzzy priority heuristics for project scheduling, Fuzzy Sets and Systems 83 (1996) 291-299.
-
(1996)
Fuzzy Sets and Systems
, vol.83
, pp. 291-299
-
-
Hapke, M.1
Slowinski, R.2
-
26
-
-
0027569485
-
Multi-project scheduling with explicit lateness costs
-
S.Y. Kim and R.C. Leachman, Multi-project scheduling with explicit lateness costs, IIE Transactions 25 (1993) 34-44.
-
(1993)
IIE Transactions
, vol.25
, pp. 34-44
-
-
Kim, S.Y.1
Leachman, R.C.2
-
28
-
-
0031276875
-
Local search for non-preemptive multi-mode resource constrained project scheduling
-
R. Kolisch and A. Drexl, Local search for non-preemptive multi-mode resource constrained project scheduling, IIE Transactions 29 (1997) 987-999.
-
(1997)
IIE Transactions
, vol.29
, pp. 987-999
-
-
Kolisch, R.1
Drexl, A.2
-
29
-
-
0000698758
-
Characterization and generation of a general class of resource constrained project scheduling problems
-
R. Kolisch, A. Sprecher and A. Drexl, Characterization and generation of a general class of resource constrained project scheduling problems, Management Science 41 (1995) 1693-1703.
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
30
-
-
0027306874
-
Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
-
S.R. Lawrence and T.E. Morton, Resource-constrained multi-project scheduling with tardy costs: comparing myopic, bottleneck, and resource pricing heuristics, European Journal of Operational Research 64 (1993) 168-187.
-
(1993)
European Journal of Operational Research
, vol.64
, pp. 168-187
-
-
Lawrence, S.R.1
Morton, T.E.2
-
31
-
-
0025399333
-
Resource-constrained scheduling of projects with variable-intensity activities
-
R.C. Leachman, A. Dinçerler and S. Kim, Resource-constrained scheduling of projects with variable-intensity activities, IIE Transactions 22 (1990) 31-40.
-
(1990)
IIE Transactions
, vol.22
, pp. 31-40
-
-
Leachman, R.C.1
Dinçerler, A.2
Kim, S.3
-
32
-
-
0025404409
-
Fuzzy logic in control systems: Fuzzy logic controller, Parts I and II
-
C. Lee, Fuzzy logic in control systems: fuzzy logic controller, Parts I and II, IEEE Transactions on Systems, Man and Cybernetics 20 (1990) 404-435.
-
(1990)
IEEE Transactions on Systems, Man and Cybernetics
, vol.20
, pp. 404-435
-
-
Lee, C.1
-
38
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
M. Mori and C.C. Tseng, A genetic algorithm for multi-mode resource constrained project scheduling problem, European Journal of Operational Research 100 (1997) 134-141.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
39
-
-
0002614325
-
A genetic algorithm approach to a general category project scheduling problem
-
L. Özdamar, A genetic algorithm approach to a general category project scheduling problem, IEEE Transactions on Systems, Man and Cybernetics 29 (1999) 44-59.
-
(1999)
IEEE Transactions on Systems, Man and Cybernetics
, vol.29
, pp. 44-59
-
-
Özdamar, L.1
-
40
-
-
0031342989
-
A project management aid for a general model with multi-mode activities and probabilistic cash flows
-
L. Özdamar and H. Dündar, A project management aid for a general model with multi-mode activities and probabilistic cash flows, Computers and Operations Research 24 (1997) 1187-1200.
-
(1997)
Computers and Operations Research
, vol.24
, pp. 1187-1200
-
-
Özdamar, L.1
Dündar, H.2
-
41
-
-
0009627197
-
A local constraint based analysis approach to project scheduling under general resource constraints
-
L. Özdamar and G. Ulusoy, A local constraint based analysis approach to project scheduling under general resource constraints, European Journal of Operational Research 79 (1994) 287-298.
-
(1994)
European Journal of Operational Research
, vol.79
, pp. 287-298
-
-
Özdamar, L.1
Ulusoy, G.2
-
42
-
-
0042613448
-
Concurrent engineering of real time systems through heterogeneous prototypes
-
eds. W.A. Malang and A.D. Stoyenko, NATO ASI Series F. 127 Springer-Verlag, Berlin
-
P. Pulli, Concurrent engineering of real time systems through heterogeneous prototypes, in: Real Time Computing, eds. W.A. Malang and A.D. Stoyenko, NATO ASI Series F. 127 (Springer-Verlag, Berlin, 1994) p. 514.
-
(1994)
Real Time Computing
, pp. 514
-
-
Pulli, P.1
-
43
-
-
0040345519
-
FULPAL: An interactive method for solving (multi-objective) fuzzy linear programming problems
-
eds. R. Slowinski and J. Teghem Kluwer Academic, Dordrecht, The Neherlands
-
Rommelfanger, FULPAL: An interactive method for solving (multi-objective) fuzzy linear programming problems, in: Stochastic versus Fuzzy Approaches to Mult-Objective Mathematical Programming under Uncertainty, eds. R. Slowinski and J. Teghem (Kluwer Academic, Dordrecht, The Neherlands, 1990) pp. 279-299.
-
(1990)
Stochastic Versus Fuzzy Approaches to Mult-Objective Mathematical Programming under Uncertainty
, pp. 279-299
-
-
Rommelfanger1
-
46
-
-
0030125352
-
A fuzzy logic approach for determining expected values: A project management application
-
M.F. Shipley, A.D. Korvin and K. Ömer, A fuzzy logic approach for determining expected values: A project management application, Journal of the Operational Research Society 47 (1996) 562-569.
-
(1996)
Journal of the Operational Research Society
, vol.47
, pp. 562-569
-
-
Shipley, M.F.1
Korvin, A.D.2
Ömer, K.3
-
47
-
-
0028195949
-
Reliable software and communication, II: Controlling the software development process
-
R. Siddhartha, S.R. Dalal, J.R. Horgan and J.R. Kettenrig, Reliable software and communication, II: Controlling the software development process, IEEE Journal on Selected Areas in Communications 12 (1994) 33-39.
-
(1994)
IEEE Journal on Selected Areas in Communications
, vol.12
, pp. 33-39
-
-
Siddhartha, R.1
Dalal, S.R.2
Horgan, J.R.3
Kettenrig, J.R.4
-
50
-
-
0022098324
-
An introductory survey of fuzzy control
-
M. Sugeno, An introductory survey of fuzzy control, Information Science 36 (1985) 59-83.
-
(1985)
Information Science
, vol.36
, pp. 59-83
-
-
Sugeno, M.1
-
51
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
F.B. Talbot, Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case, Management Science 28 (1982) 1197-1210.
-
(1982)
Management Science
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
52
-
-
84974870375
-
Heuristic performance and network/resource characteristics in resource constrained project scheduling
-
G. Ulusoy and L. Özdamar, Heuristic performance and network/resource characteristics in resource constrained project scheduling, Journal of the Operational Research Society 40 (1989) 1145-1152.
-
(1989)
Journal of the Operational Research Society
, vol.40
, pp. 1145-1152
-
-
Ulusoy, G.1
Özdamar, L.2
-
53
-
-
0022012701
-
Evaluating software development by analysis of changes: Some data from the software engineering laboratory
-
D.W. Weiss and V.R. Basili, Evaluating software development by analysis of changes: Some data from the software engineering laboratory, IEEE Transactions on Software Engineering SE-11 (1985) 157-168.
-
(1985)
IEEE Transactions on Software Engineering SE-11
, pp. 157-168
-
-
Weiss, D.W.1
Basili, V.R.2
|