Arbuckle, J., L. (2005). Amos 6.0 users guide; SPSS statistical software
-
Arbuckle, J., L. (2005). Amos 6.0 users guide; SPSS statistical software
-
-
-
-
4
-
-
63049129249
-
Goldratt, Eliyahu & Jeff Cox. The goal: A process of ongoing inprovement // review
-
Goldratt, E., & Cox, J. (1992). Goldratt, Eliyahu & Jeff Cox. The goal: A process of ongoing inprovement // review. The Canadian Manager, 17(4), 29.
-
(1992)
The Canadian Manager
, vol.17
, Issue.4
, pp. 29
-
-
Goldratt, E.1
Cox, J.2
-
5
-
-
0032045222
-
Severity diagnosis of productivity problems - A reliability analysis
-
Kaming, P. F., Holt, G. D., Kometa, S. T., & OIomolaiye, P. O. (1998). Severity diagnosis of productivity problems - A reliability analysis. International Journal of Project Management, 16(2), 107.
-
(1998)
International Journal of Project Management
, vol.16
, Issue.2
, pp. 107
-
-
Kaming, P.F.1
Holt, G.D.2
Kometa, S.T.3
OIomolaiye, P.O.4
-
6
-
-
32644453240
-
Critical chain: A new project management paradigm or old wine in new bottles?
-
Lechler, T. G., Ronen, B., & Stohr, E. A. (2005). Critical chain: A new project management paradigm or old wine in new bottles? Engineering Management Journal, 17(4), 45.
-
(2005)
Engineering Management Journal
, vol.17
, Issue.4
, pp. 45
-
-
Lechler, T.G.1
Ronen, B.2
Stohr, E.A.3
-
7
-
-
19844369721
-
Evaluation of the Bayesian and maximum likelihood approaches in analyzing structural equation models with small sample sizes
-
Lee, S. Y., & Song, X. Y. (2004) Evaluation of the Bayesian and maximum likelihood approaches in analyzing structural equation models with small sample sizes. Multivariate behavioural research, 39(4), 653-686.
-
(2004)
Multivariate behavioural research
, vol.39
, Issue.4
, pp. 653-686
-
-
Lee, S.Y.1
Song, X.Y.2
-
9
-
-
0032722695
-
Construction resource/method factors influencing productivity for high rise concrete construction
-
Proverbs, D. G., Holt, G. D., & Olomolaiye, P. O. (1999). Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), 577.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.5
, pp. 577
-
-
Proverbs, D.G.1
Holt, G.D.2
Olomolaiye, P.O.3
-
10
-
-
63049113215
-
-
Rad, P. F. (1980). Analysis of working space congestion from scheduling data. American Association of Cost Engineers.Transactions of the AACEI, F.4.1.
-
Rad, P. F. (1980). Analysis of working space congestion from scheduling data. American Association of Cost Engineers.Transactions of the AACEI, F.4.1.
-
-
-
-
11
-
-
33847656977
-
Process planning methodology: Dynamic short-term planning for off-site construction in Slovenia
-
Radosavljevic, M., & Horner, M. (2007). Process planning methodology: Dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(2), 143.
-
(2007)
Construction Management and Economics
, vol.25
, Issue.2
, pp. 143
-
-
Radosavljevic, M.1
Horner, M.2
-
12
-
-
63049124032
-
-
U.S. Army. (1979). Modification impact evaluation guide No. Dept. of the Army, Office of the Chief Engineers EP-415-1-3)
-
U.S. Army. (1979). Modification impact evaluation guide No. Dept. of the Army, Office of the Chief Engineers EP-415-1-3)
-
-
-
-
13
-
-
33646196837
-
Critical space analysis
-
Winch, M. G., & North, S. (2006). Critical space analysis. Journal of Construction Engineering and Management, 132(5), 473-481.
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.5
, pp. 473-481
-
-
Winch, M.G.1
North, S.2
|