메뉴 건너뛰기




Volumn 17, Issue 5, 1999, Pages 577-587

Construction resource/method factors influencing productivity for high rise concrete construction

Author keywords

Construction methods; High rise construction; In situ concrete work; Productivity rates; Resource utilization

Indexed keywords

CONCRETE PLACING; CONTRACTORS; PRODUCTIVITY;

EID: 0032722695     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/014461999371196     Document Type: Article
Times cited : (22)

References (44)
  • 1
    • 0007787079 scopus 로고
    • The shame and the sham
    • 5937
    • d'Arcy, J. (1993) The shame and the sham, in Contract Journal, 396 (5937), 12-13.
    • (1993) Contract Journal , vol.396 , pp. 12-13
    • Arcy, J.1
  • 7
    • 85038135151 scopus 로고    scopus 로고
    • Bouygues wins first big UK contract
    • 14 March
    • Builder Group, The (1997) Bouygues wins first big UK contract, Building, 14 March, 9.
    • (1997) Building , pp. 9
  • 8
    • 0041185219 scopus 로고
    • Construction Industry Cost Effectiveness Task Force Report C-2, Business Roundtable, New York.
    • Business Roundtable (1991) Scheduled Overtime Effect on Construction Projects, Construction Industry Cost Effectiveness Task Force Report C-2, Business Roundtable, New York.
    • (1991) Scheduled Overtime Effect on Construction Projects
    • Roundtable, B.1
  • 10
    • 5844358469 scopus 로고
    • Chambre de Commerce Française De Grande-Bretagne in association with The Royal Institution of Chartered Surveyors, London
    • CFCGB (1993) Tlie Business of Building in France, Chambre de Commerce Française De Grande-Bretagne in association with The Royal Institution of Chartered Surveyors, London.
    • (1993) Tlie Business of Building in France
  • 11
    • 5844321229 scopus 로고
    • Chartered Institute of Building, Ascot.
    • Chartered Builder (1993) A Manager's Guide to French Construction, pp. 5, 7-9, 10, Chartered Institute of Building, Ascot.
    • (1993) A Manager's Guide to French Construction , vol.5 , pp. 7-9
  • 13
    • 0004224788 scopus 로고
    • Construction Industry Research and Information Association, London.
    • CIRIA (1983) Buildability: An Assessment, Construction Industry Research and Information Association, London.
    • (1983) Buildability: An Assessment
  • 14
    • 85038141258 scopus 로고    scopus 로고
    • Construction Industry Research and Information Association, London.
    • CIRIA (1997) Standardisation and Pre-assembly Snapshot, Construction Industry Research and Information Association, London.
    • (1997) Standardisation and Pre-assembly Snapshot
  • 16
    • 33847514173 scopus 로고
    • Concrete mixing and placing, Contract Journal
    • Contract Journal (1982) Concrete mixing and placing, Contract Journal, 309 (5172), 29-51.
    • (1982) Contract Journal , vol.309 , pp. 29-51
  • 18
    • 0003820162 scopus 로고    scopus 로고
    • European Construction Industry Federation, Brussels.
    • ECIF (1996) Annual Report, European Construction Industry Federation, Brussels.
    • (1996) Annual Report
  • 20
    • 0028481406 scopus 로고
    • Factors affecting construction productivity: Newfoundland versus rest of Canada
    • Hanna, A.S. and Heale, D.G. (1994) Factors affecting construction productivity: Newfoundland versus rest of Canada, Canadian Journal of Civil Engineering, 21(4), 663-73.
    • (1994) Canadian Journal of Civil Engineering , vol.21 , Issue.4 , pp. 663-673
    • Hanna, A.S.1    Heale, D.G.2
  • 21
    • 0002209085 scopus 로고
    • Research of factors influencing construction productivity
    • Herbsman, Z. and Ellis, R. (1990) Research of factors influencing construction productivity, Construction Management and Economics, 8(1), 49-61.
    • (1990) Construction Management and Economics , vol.8 , Issue.1 , pp. 49-61
    • Herbsman, Z.1    Ellis, R.2
  • 25
    • 0003267827 scopus 로고
    • Is construction project planning really doing its job? A critical examination of focus, role and process
    • Laufer, A. and Tucker, R.L. (1987) Is construction project planning really doing its job? A critical examination of focus, role and process, Construction Management and Economics, 5(3), 243-66.
    • (1987) Construction Management and Economics , vol.5 , Issue.3 , pp. 243-266
    • Laufer, A.1    Tucker, R.L.2
  • 28
    • 0002733516 scopus 로고
    • Construction time-influencing factors: The contractor's perspective
    • Nkado, R.N. (1995) Construction time-influencing factors: the contractor's perspective, Construction Management and Economics, 13(1), 81-9.
    • (1995) Construction Management and Economics , vol.13 , Issue.1 , pp. 81-89
    • Nkado, R.N.1
  • 29
  • 32
    • 0002412850 scopus 로고    scopus 로고
    • Reinforcement fabrication for high rise concrete construction: French, German and UK practice
    • ISBN 0 903 497 26 3.
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1998b) Reinforcement fabrication for high rise concrete construction: French, German and UK practice. Technical paper by the Faculty of Building, ISBN 0 903 497 26 3.
    • (1998) Technical Paper by the Faculty of Building
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 33
    • 84992979789 scopus 로고    scopus 로고
    • A comparative evaluation of concrete placing productivity rates, amongst French, German and UK construction contractors
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1998c) A comparative evaluation of concrete placing productivity rates, amongst French, German and UK construction contractors, Engineering, Construction and Architectural Management, 5(2), 174-81.
    • (1998) Engineering, Construction and Architectural Management , vol.5 , Issue.2 , pp. 174-181
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 34
    • 0032121841 scopus 로고    scopus 로고
    • A comparative evaluation of planning engineers' formwork productivity rates in European construction
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1998d) A comparative evaluation of planning engineers' formwork productivity rates in European construction, Building and Environment, 33(4), 181-87.
    • (1998) Building and Environment , vol.33 , Issue.4 , pp. 181-187
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 35
    • 84993087674 scopus 로고    scopus 로고
    • A comparative evaluation of reinforcement fixing productivity rates amongst European construction contractors
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1998e) A comparative evaluation of reinforcement fixing productivity rates amongst European construction contractors, Engineering, Construction and Architectural Management, 5(4), 350-58.
    • (1998) Engineering, Construction and Architectural Management , vol.5 , Issue.4 , pp. 350-358
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 36
    • 0001876237 scopus 로고    scopus 로고
    • Productivity rates and construction methods for high-rise concrete construction: A comparative evaluation of UK, German and French contractors
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1999a) Productivity rates and construction methods for high-rise concrete construction: a comparative evaluation of UK, German and French contractors, Construction Management and Economics, 17(1), 45-52.
    • (1999) Construction Management and Economics , vol.17 , Issue.1 , pp. 45-52
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 37
    • 0000461860 scopus 로고    scopus 로고
    • European construction contractors: A productivity appraisal of in situ concrete operations
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1999b) European construction contractors: a productivity appraisal of in situ concrete operations, Construction Management and Economics, 17(2), 221-30.
    • (1999) Construction Management and Economics , vol.17 , Issue.2 , pp. 221-230
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 38
    • 33847492687 scopus 로고    scopus 로고
    • The logistics of materials management in high rise construction: Factors determining the selection of in-situ concrete materials handling methods
    • under review.
    • Proverbs, D.G., Holt, G.D. and Love, P.E.D. (1999c) The logistics of materials management in high rise construction: factors determining the selection of in-situ concrete materials handling methods, Journal of Physical Distribution and Logistics Management, under review.
    • (1999) Journal of Physical Distribution and Logistics Management
    • Proverbs, D.G.1    Holt, G.D.2    Love, P.E.D.3
  • 40
    • 0033150103 scopus 로고    scopus 로고
    • The management of labour on high rise construction projects: An international investigation
    • Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1999e) The management of labour on high rise construction projects: an international investigation, International Journal of Project Management, 17(3), 195-204.
    • (1999) International Journal of Project Management , vol.17 , Issue.3 , pp. 195-204
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 41
    • 5844405448 scopus 로고
    • Temporary structures in construction an overview
    • Ratay, R. (ed), American Society of Civil Engineers, New York
    • Ratay, R.T. (1987) Temporary structures in construction an overview, in Temporary Structures in Construction Operations, Ratay, R. (ed), American Society of Civil Engineers, New York, pp. 1-8.
    • (1987) Temporary Structures in Construction Operations , pp. 1-8
    • Ratay, R.T.1
  • 44
    • 0015648968 scopus 로고
    • Analysis of transportation methods in construction
    • Warszawski, A. (1973) Analysis of transportation methods in construction, Journal of the Construction Division ASCE, 99(CO1), 191-202.
    • (1973) Journal of the Construction Division ASCE , vol.99 , Issue.CO1 , pp. 191-202
    • Warszawski, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.