-
2
-
-
21844511173
-
LL Bean improves callcenter forecasting
-
Andrews, B. H., S. M. Cunningham. 1995. LL Bean improves callcenter forecasting. Interfaces 25 1-13.
-
(1995)
Interfaces
, vol.25
, pp. 1-13
-
-
Andrews, B.H.1
Cunningham, S.M.2
-
6
-
-
0040691456
-
Improving forecasting for telemarketing centers by ARIMA modelling with intervention
-
Bianchi, L., J. Jarrett, R. C. Hanumara. 1998. Improving forecasting for telemarketing centers by ARIMA modelling with intervention. Internat. J. Forecasting 14 497-504.
-
(1998)
Internat. J. Forecasting
, vol.14
, pp. 497-504
-
-
Bianchi, L.1
Jarrett, J.2
Hanumara, R.C.3
-
7
-
-
0003410292
-
-
3rd ed. Prentice Hall, Upper Saddle River, NJ
-
Box, G. E. P., G. M. Jenkins, G. C. Reinsel. 1994. Time Series Analysis: Forecasting and Control, 3rd ed. Prentice Hall, Upper Saddle River, NJ.
-
(1994)
Time Series Analysis: Forecasting and Control
-
-
Box, G.E.P.1
Jenkins, G.M.2
Reinsel, G.C.3
-
8
-
-
14944380366
-
Statistical analysis of a telephone call center: A queueing-science perspective
-
Brown, L. D., N. Gans, A. Mandelbaum, A. Sakov, H. Shen, S. Zeltyn, L. Zhao. 2005. Statistical analysis of a telephone call center: A queueing-science perspective. J. Amer. Statist. Assoc. 100 36-50.
-
(2005)
J. Amer. Statist. Assoc
, vol.100
, pp. 36-50
-
-
Brown, L.D.1
Gans, N.2
Mandelbaum, A.3
Sakov, A.4
Shen, H.5
Zeltyn, S.6
Zhao, L.7
-
10
-
-
1142301701
-
Bayesian modeling and forecasting of intraday electricity load
-
Cottet, R., M. Smith. 2003. Bayesian modeling and forecasting of intraday electricity load. J. Amer. Statist. Assoc. 98 839-849.
-
(2003)
J. Amer. Statist. Assoc
, vol.98
, pp. 839-849
-
-
Cottet, R.1
Smith, M.2
-
11
-
-
31344448314
-
Forecasting the term structure of government bond yields
-
Diebold, F. X., C. Li. 2006. Forecasting the term structure of government bond yields. J. Econometrics 130 337-364.
-
(2006)
J. Econometrics
, vol.130
, pp. 337-364
-
-
Diebold, F.X.1
Li, C.2
-
12
-
-
27844577252
-
Schedule recovery: Unplanned absences in service operations
-
Easton, F. F., J. Goodale. 2005. Schedule recovery: Unplanned absences in service operations. Decision Sci. 36 459-488.
-
(2005)
Decision Sci
, vol.36
, pp. 459-488
-
-
Easton, F.F.1
Goodale, J.2
-
13
-
-
0000802374
-
The approximation of one matrix by another of lower rank
-
Eckart, C., G. Young. 1936. The approximation of one matrix by another of lower rank. Psychometrika 1 211-218.
-
(1936)
Psychometrika
, vol.1
, pp. 211-218
-
-
Eckart, C.1
Young, G.2
-
14
-
-
0003991665
-
-
Chapman & Hall/CRC, Toronto, ON, Canada
-
Efron, B., R. J. Tibshirani. 1994. An Introduction to the Bootstrap. Chapman & Hall/CRC, Toronto, ON, Canada.
-
(1994)
An Introduction to the Bootstrap
-
-
Efron, B.1
Tibshirani, R.J.2
-
15
-
-
0345117077
-
Telephone call centers: Tutorial, review, and research prospects
-
Gans, N., G. M. Koole, A. Mandelbaum. 2003. Telephone call centers: Tutorial, review, and research prospects. Manufacturing Service Oper. Management 5 79-141.
-
(2003)
Manufacturing Service Oper. Management
, vol.5
, pp. 79-141
-
-
Gans, N.1
Koole, G.M.2
Mandelbaum, A.3
-
16
-
-
0031152626
-
Forecasting a cumulative variable based on its partially accumulated data
-
Guerrero, V. M., J. A. Elizondo. 1997. Forecasting a cumulative variable based on its partially accumulated data. Management Sci. 43 879-889.
-
(1997)
Management Sci
, vol.43
, pp. 879-889
-
-
Guerrero, V.M.1
Elizondo, J.A.2
-
18
-
-
84942484786
-
Ridge regression: Biased estimation for nonorthogonal problems
-
Hoerl, A. E., R. W. Kennard. 1970a. Ridge regression: Biased estimation for nonorthogonal problems. Technometrics 12 55-67.
-
(1970)
Technometrics
, vol.12
, pp. 55-67
-
-
Hoerl, A.E.1
Kennard, R.W.2
-
19
-
-
84942487147
-
Ridge regression: Application to nonorthogonal problems
-
Hoerl, A. E., R. W. Kennard. 1970b. Ridge regression: Application to nonorthogonal problems. Technometrics 12 69-82.
-
(1970)
Technometrics
, vol.12
, pp. 69-82
-
-
Hoerl, A.E.1
Kennard, R.W.2
-
20
-
-
1642482506
-
A comparative evaluation of forecast monitoring systems in service organizations
-
San Diego, CA
-
Hur, D. 2002. A comparative evaluation of forecast monitoring systems in service organizations. 33rd Annual Meeting Decision Sci. Inst., San Diego, CA.
-
(2002)
33rd Annual Meeting Decision Sci. Inst
-
-
Hur, D.1
-
21
-
-
14544292436
-
Real-time work schedule adjustment decisions: An investigation and evaluation
-
Hur, D., V. A. Mabert, K. M. Bretthauer. 2004. Real-time work schedule adjustment decisions: An investigation and evaluation. Production Oper. Management 13 322-339.
-
(2004)
Production Oper. Management
, vol.13
, pp. 322-339
-
-
Hur, D.1
Mabert, V.A.2
Bretthauer, K.M.3
-
23
-
-
0035492339
-
Managing uncertainty in call centers using Poisson mixtures
-
Jongbloed, G., G. M. Koole. 2001. Managing uncertainty in call centers using Poisson mixtures. Appl. Stochastic Models Bus. Indust. 17 307-318.
-
(2001)
Appl. Stochastic Models Bus. Indust
, vol.17
, pp. 307-318
-
-
Jongbloed, G.1
Koole, G.M.2
-
25
-
-
39449118709
-
Intelligent procedures for intra-day updating of call center agent schedules
-
Technical Report, Department of Decision Sciences, San Francisco State University
-
Mehrotra, V., O. Ozluk, R. Saltzman. 2006. Intelligent procedures for intra-day updating of call center agent schedules. Technical Report, Department of Decision Sciences, San Francisco State University.
-
(2006)
-
-
Mehrotra, V.1
Ozluk, O.2
Saltzman, R.3
-
27
-
-
21244452429
-
Analysis of call centre arrival data using singular value decomposition
-
Shen, H., J. Z. Huang. 2005. Analysis of call centre arrival data using singular value decomposition. Appl. Stochastic Models Bus. Indust. 21 251-263.
-
(2005)
Appl. Stochastic Models Bus. Indust
, vol.21
, pp. 251-263
-
-
Shen, H.1
Huang, J.Z.2
-
28
-
-
33846691621
-
Service system planning in the presence of a random arrival rate
-
Technical report, Cornell University, Ithaca, NY
-
Steckley, S. G., S. G. Henderson, V. Mehrotra. 2004. Service system planning in the presence of a random arrival rate. Technical report, Cornell University, Ithaca, NY.
-
(2004)
-
-
Steckley, S.G.1
Henderson, S.G.2
Mehrotra, V.3
-
29
-
-
41549150214
-
A comparison of univariate time series methods for forecasting intraday arrivals at a call center
-
Taylor, J. W 2008. A comparison of univariate time series methods for forecasting intraday arrivals at a call center. Management Sci. 54(2) 253-265.
-
(2008)
Management Sci
, vol.54
, Issue.2
, pp. 253-265
-
-
Taylor, J.W.1
-
31
-
-
28244455337
-
A staffing algorithm for call centers with skill-based routing
-
Wallace, R. B., W. Whitt. 2005. A staffing algorithm for call centers with skill-based routing. Manufacturing Service Oper. Management 7 276-294.
-
(2005)
Manufacturing Service Oper. Management
, vol.7
, pp. 276-294
-
-
Wallace, R.B.1
Whitt, W.2
-
32
-
-
38349052063
-
Bayesian forecasting of an inhomogeneous Poisson process with applications to call center data
-
Forthcoming
-
Weinberg, J., L. D. Brown, J. R. Stroud. 2007. Bayesian forecasting of an inhomogeneous Poisson process with applications to call center data. J. Amer. Statist. Assoc. Forthcoming.
-
(2007)
J. Amer. Statist. Assoc
-
-
Weinberg, J.1
Brown, L.D.2
Stroud, J.R.3
|