메뉴 건너뛰기




Volumn , Issue , 2008, Pages 2370-2376

A dynamic crashing method for project management using simulation-based optimization

Author keywords

[No Author keywords available]

Indexed keywords

CRASHING COSTS; DYNAMIC SIMULATIONS; PROJECT COMPLETIONS; PROJECT COSTS; PROJECT NETWORKS; SIMULATION-BASED OPTIMIZATIONS; TOTAL COSTS;

EID: 60749109798     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2008.4736344     Document Type: Conference Paper
Times cited : (14)

References (16)
  • 4
    • 60749128543 scopus 로고    scopus 로고
    • Ph.D. Dissertation, University of Northern Colorado, Colorado
    • Haga, W. A. 1998. Crashing PERT networks. Ph.D. Dissertation, University of Northern Colorado, Colorado.
    • (1998) Crashing PERT networks
    • Haga, W.A.1
  • 5
    • 60749118499 scopus 로고    scopus 로고
    • A simulation approach to the PERT CPM time-cost trade-off problem
    • Haga, W. A., and K. A. Marold. 2004. A simulation approach to the PERT CPM time-cost trade-off problem. Project Management Journal, 35(2): 31-37.
    • (2004) Project Management Journal , vol.35 , Issue.2 , pp. 31-37
    • Haga, W.A.1    Marold, K.A.2
  • 6
    • 60749091369 scopus 로고    scopus 로고
    • Monitoring and control of PERT networks
    • Haga, W. A., and K. A. Marold. 2005. Monitoring and control of PERT networks. The Business Review, 3(2): 240-245.
    • (2005) The Business Review , vol.3 , Issue.2 , pp. 240-245
    • Haga, W.A.1    Marold, K.A.2
  • 9
    • 14544303228 scopus 로고    scopus 로고
    • Probability of project completion using stochastic project scheduling simulation
    • Lee, D. 2005. Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3): 310-318.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 310-318
    • Lee, D.1
  • 10
    • 32944482015 scopus 로고    scopus 로고
    • Automated statistical analysis in stochastic project scheduling simulation
    • Lee, D., and D. Arditi. 2006. Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3): 268-277.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 268-277
    • Lee, D.1    Arditi, D.2
  • 12
    • 33644525898 scopus 로고    scopus 로고
    • Discrete optimization via simulation using COMPASS
    • Nelson, L.J. and B. L. Nelson. 2006. Discrete optimization via simulation using COMPASS. Operations Research, 54:115-129.
    • (2006) Operations Research , vol.54 , pp. 115-129
    • Nelson, L.J.1    Nelson, B.L.2
  • 15
    • 0036923423 scopus 로고    scopus 로고
    • Project management - critical path method (CPM) and PERT simulated with Process Model
    • Dec 8-11
    • Simmons, L. F. 2002. Project management - critical path method (CPM) and PERT simulated with Process Model. Proceedings of the 2002 Winter Simulation Conference, Dec 8-11 2002: 1786-1788.
    • (2002) Proceedings of the 2002 Winter Simulation Conference , pp. 1786-1788
    • Simmons, L.F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.