메뉴 건너뛰기




Volumn 1, Issue , 1999, Pages 635-640

Resource allocation model for a fast-tracked project

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; MANUFACTURE;

EID: 0008120570     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IPMM.1999.792562     Document Type: Conference Paper
Times cited : (5)

References (3)
  • 1
    • 85040020097 scopus 로고
    • M. A. Sc. Thesis, University of British Columbia, Civil Engineering
    • Sproule, J. A. , 1992. M. A. Sc. Thesis, University of British Columbia, Civil Engineering.
    • (1992)
    • Sproule, J.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.