-
1
-
-
0028464045
-
An AHP framework for prioritizing customer requirements in QFD: An industrialised housing application
-
Armacost R.L., Componation P.J., Mullens M.A., and Swart W.W. An AHP framework for prioritizing customer requirements in QFD: An industrialised housing application. IIE Transactions 26 4 (1994) 72-79
-
(1994)
IIE Transactions
, vol.26
, Issue.4
, pp. 72-79
-
-
Armacost, R.L.1
Componation, P.J.2
Mullens, M.A.3
Swart, W.W.4
-
2
-
-
0242269937
-
Inexact genetic algorithm approach to target values setting of engineering requirements in QFD
-
Bai H., and Kwong C.K. Inexact genetic algorithm approach to target values setting of engineering requirements in QFD. International Journal Production Research 41 16 (2003) 3861-3881
-
(2003)
International Journal Production Research
, vol.41
, Issue.16
, pp. 3861-3881
-
-
Bai, H.1
Kwong, C.K.2
-
3
-
-
0032662402
-
Rating the importance of customer needs in quality function deployment by fuzzy and entropy methods
-
Chan L.K., Kao H.P., Ng A., and Wu M.L. Rating the importance of customer needs in quality function deployment by fuzzy and entropy methods. International Journal Production Research 37 11 (1999) 2499-2518
-
(1999)
International Journal Production Research
, vol.37
, Issue.11
, pp. 2499-2518
-
-
Chan, L.K.1
Kao, H.P.2
Ng, A.3
Wu, M.L.4
-
5
-
-
10144234793
-
A systematic approach to quality function deployment with a full illustrative example
-
Chan L.K., and Wu M.L. A systematic approach to quality function deployment with a full illustrative example. Omega 33 (2005) 119-139
-
(2005)
Omega
, vol.33
, pp. 119-139
-
-
Chan, L.K.1
Wu, M.L.2
-
6
-
-
27844439074
-
Fuzzy expected value modeling approach for determining target values of engineering characteristics in QFD
-
Chen Y.Z., Fung R.Y.K., and Tang J.F. Fuzzy expected value modeling approach for determining target values of engineering characteristics in QFD. International Journal Production Research 43 17 (2005) 3583-3604
-
(2005)
International Journal Production Research
, vol.43
, Issue.17
, pp. 3583-3604
-
-
Chen, Y.Z.1
Fung, R.Y.K.2
Tang, J.F.3
-
7
-
-
33746841078
-
Rating technical attributes in fuzzy QFD by integrating fuzzy weighted average method and fuzzy expected value operator
-
Chen Y.Z., Fung R.Y.K., and Tang J.F. Rating technical attributes in fuzzy QFD by integrating fuzzy weighted average method and fuzzy expected value operator. European Journal Operational Research 174 (2006) 1553-1566
-
(2006)
European Journal Operational Research
, vol.174
, pp. 1553-1566
-
-
Chen, Y.Z.1
Fung, R.Y.K.2
Tang, J.F.3
-
8
-
-
1342308564
-
Fuzzy regression-based mathematical programming model for quality function deployment
-
Chen Y.Z., Tang J.F., Fung R.Y.K., and Ren Z.Y. Fuzzy regression-based mathematical programming model for quality function deployment. International Journal Production Research 42 5 (2004) 1009-1027
-
(2004)
International Journal Production Research
, vol.42
, Issue.5
, pp. 1009-1027
-
-
Chen, Y.Z.1
Tang, J.F.2
Fung, R.Y.K.3
Ren, Z.Y.4
-
9
-
-
27344448848
-
Estimating the functional relationships for quality function deployment under uncertainties
-
Fung R.Y.K., Chen Y.Z., and Tang J.F. Estimating the functional relationships for quality function deployment under uncertainties. Fuzzy Sets and Systems 157 (2006) 98-120
-
(2006)
Fuzzy Sets and Systems
, vol.157
, pp. 98-120
-
-
Fung, R.Y.K.1
Chen, Y.Z.2
Tang, J.F.3
-
11
-
-
0037085108
-
Product design resource optimization using a non-linear fuzzy quality function deployment model
-
Fung R.Y.K., Tang J.F., Tu Y.L., and Wang D. Product design resource optimization using a non-linear fuzzy quality function deployment model. International Journal Production Research 40 3 (2002) 585-599
-
(2002)
International Journal Production Research
, vol.40
, Issue.3
, pp. 585-599
-
-
Fung, R.Y.K.1
Tang, J.F.2
Tu, Y.L.3
Wang, D.4
-
13
-
-
58349085008
-
Integrated analytic hierarchy process and its applications - A literature review
-
Ho W. Integrated analytic hierarchy process and its applications - A literature review. European Journal Operational Research 174 (2008) 1553-1566
-
(2008)
European Journal Operational Research
, vol.174
, pp. 1553-1566
-
-
Ho, W.1
-
14
-
-
0032623584
-
An integrated group decision-making approach to quality function deployment
-
Ho E.S.S.A., Lai Y.J., and Chang S.I. An integrated group decision-making approach to quality function deployment. IIE Transactions 31 (1999) 553-567
-
(1999)
IIE Transactions
, vol.31
, pp. 553-567
-
-
Ho, E.S.S.A.1
Lai, Y.J.2
Chang, S.I.3
-
15
-
-
28244480436
-
A fuzzy optimization model for QFD planning process using analytic network approach
-
Kahraman C., Ertay T., and Buyukozkan G. A fuzzy optimization model for QFD planning process using analytic network approach. European Journal Operational Research 171 (2006) 390-411
-
(2006)
European Journal Operational Research
, vol.171
, pp. 390-411
-
-
Kahraman, C.1
Ertay, T.2
Buyukozkan, G.3
-
16
-
-
0002098535
-
Attribute quality and must-be quality
-
Kano N., Seraku N., Takashi F., and Tsuji S. Attribute quality and must-be quality. The Journal of the Japanese Society for Quality Control 14 1 (1984) 39-48
-
(1984)
The Journal of the Japanese Society for Quality Control
, vol.14
, Issue.1
, pp. 39-48
-
-
Kano, N.1
Seraku, N.2
Takashi, F.3
Tsuji, S.4
-
17
-
-
4944222244
-
Fuzzy multiple objective decision making approach to prioritize design requirements in quality function deployment
-
Karsak E.E. Fuzzy multiple objective decision making approach to prioritize design requirements in quality function deployment. International Journal Production Research 42 18 (2004) 3957-3974
-
(2004)
International Journal Production Research
, vol.42
, Issue.18
, pp. 3957-3974
-
-
Karsak, E.E.1
-
20
-
-
0038817867
-
Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approach
-
Kwong C.K., and Bai H. Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approach. IIE Transactions 35 (2003) 619-626
-
(2003)
IIE Transactions
, vol.35
, pp. 619-626
-
-
Kwong, C.K.1
Bai, H.2
-
21
-
-
0003005270
-
Integrating QFD, AHP, and benchmarking in strategic marketing
-
Lu M., Madu C.N., Kuei C., and Winokur D. Integrating QFD, AHP, and benchmarking in strategic marketing. Journal Business and Industrial Market 9 1 (1994) 41-50
-
(1994)
Journal Business and Industrial Market
, vol.9
, Issue.1
, pp. 41-50
-
-
Lu, M.1
Madu, C.N.2
Kuei, C.3
Winokur, D.4
-
23
-
-
0032179378
-
Determination of an optimal set of design requirements using house of quality
-
Park T., and Kim K.J. Determination of an optimal set of design requirements using house of quality. Journal of Operation Management 16 (1998) 569-581
-
(1998)
Journal of Operation Management
, vol.16
, pp. 569-581
-
-
Park, T.1
Kim, K.J.2
-
25
-
-
33750347961
-
Prioritizing quality characteristic in dynamic quality function deployment
-
Raharjo X., Xie M., and Brombacher A.C. Prioritizing quality characteristic in dynamic quality function deployment. International Journal Production Research 44 23 (2006) 5005-5018
-
(2006)
International Journal Production Research
, vol.44
, Issue.23
, pp. 5005-5018
-
-
Raharjo, X.1
Xie, M.2
Brombacher, A.C.3
-
26
-
-
34249338843
-
Incorporating concepts of business priority into quality function deployment
-
Tan K.C., and Raghavan V. Incorporating concepts of business priority into quality function deployment. International Journal of Innovative Management 8 1 (2004) 21-35
-
(2004)
International Journal of Innovative Management
, vol.8
, Issue.1
, pp. 21-35
-
-
Tan, K.C.1
Raghavan, V.2
-
27
-
-
1542427719
-
Integrating Kano's model in the planning matrix of quality function deployment
-
Tan K.C., and Shen X.X. Integrating Kano's model in the planning matrix of quality function deployment. Total Quality Management 11 8 (2000) 1141-1151
-
(2000)
Total Quality Management
, vol.11
, Issue.8
, pp. 1141-1151
-
-
Tan, K.C.1
Shen, X.X.2
-
28
-
-
0036722285
-
A new approach to quality function deployment with financial consideration
-
Tang J.F., Fung R.Y.K., Xu D., and Wang D.W. A new approach to quality function deployment with financial consideration. Computer and Operational Research 29 11 (2002) 1447-1463
-
(2002)
Computer and Operational Research
, vol.29
, Issue.11
, pp. 1447-1463
-
-
Tang, J.F.1
Fung, R.Y.K.2
Xu, D.3
Wang, D.W.4
-
29
-
-
30444445518
-
Synthesis, evaluation, and selection of parts design scheme in supplier involved product development
-
Tang J.F., Zhan Y.E., Tu Y.L., Chen Y.Z., and Dong Y. Synthesis, evaluation, and selection of parts design scheme in supplier involved product development. Concurrent Engineering: Research and Applications 13 (2005) 277-289
-
(2005)
Concurrent Engineering: Research and Applications
, vol.13
, pp. 277-289
-
-
Tang, J.F.1
Zhan, Y.E.2
Tu, Y.L.3
Chen, Y.Z.4
Dong, Y.5
-
30
-
-
0033101803
-
Fuzzy outranking approach to prioritize design requirements in quality function deployment
-
Wang J. Fuzzy outranking approach to prioritize design requirements in quality function deployment. International Journal Production Research 37 4 (1999) 899-916
-
(1999)
International Journal Production Research
, vol.37
, Issue.4
, pp. 899-916
-
-
Wang, J.1
-
31
-
-
0027588865
-
On how to prioritize design requirements during the QFD planning process
-
Wasserman G.S. On how to prioritize design requirements during the QFD planning process. IIE Transactions 25 3 (1993) 59-65
-
(1993)
IIE Transactions
, vol.25
, Issue.3
, pp. 59-65
-
-
Wasserman, G.S.1
-
32
-
-
17644427162
-
-
ASQ Quality Press, Milwaukee, Wisconsin
-
Xie M., Tan K.C., and Goh T.N. Advanced QFD applications (2003), ASQ Quality Press, Milwaukee, Wisconsin
-
(2003)
Advanced QFD applications
-
-
Xie, M.1
Tan, K.C.2
Goh, T.N.3
|