-
1
-
-
58049186765
-
Stope optimisation using the maximum value neighborhood (MVN) concept
-
ed: K Dagdelen, pp, Colorado School of Mines: Golden
-
Ataee-pour, M and Baafi, E Y, 1999. Stope optimisation using the maximum value neighborhood (MVN) concept, in Proceedings 28th International Symposium on the Application of Computers and Operations Research in the Mineral Industry (ed: K Dagdelen), pp 493-501 (Colorado School of Mines: Golden).
-
(1999)
Proceedings 28th International Symposium on the Application of Computers and Operations Research in the Mineral Industry
, pp. 493-501
-
-
Ataee-pour, M.1
Baafi, E.Y.2
-
2
-
-
58049168728
-
Resource and reserves: Their uses and abuses by the equity markets
-
The Australasian Institute of Mining and Metallurgy: Melbourne
-
Baker, C K and Giacomo, S M, 1998. Resource and reserves: their uses and abuses by the equity markets, in Ore Reserves and Finance, pp 65-76 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(1998)
Ore Reserves and Finance
, pp. 65-76
-
-
Baker, C.K.1
Giacomo, S.M.2
-
3
-
-
58049151717
-
Risk assessment in strategic and tactical geomechanical underground mine design
-
second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Bawden, W R 2007. Risk assessment in strategic and tactical geomechanical underground mine design, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 263-271 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 263-271
-
-
Bawden, W.R.1
-
4
-
-
58049158942
-
-
TM, 1995. Floating Stope Optimiser User Guide, Edition 1.2, 20 p (Mineral Industries Computing Limited).
-
TM, 1995. Floating Stope Optimiser User Guide, Edition 1.2, 20 p (Mineral Industries Computing Limited).
-
-
-
-
5
-
-
58049141967
-
-
Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
-
Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
-
-
-
-
6
-
-
0036064712
-
-
Dimitrakopoulos. R. Faixelly, C T and Godoy, M, 2002. Moving forward from traditional optimisation: grade uncertainty and risk effects in open-pit design, Trans Inst Min Metall, Section A, Mining Technology, 111:A82-A88.
-
Dimitrakopoulos. R. Faixelly, C T and Godoy, M, 2002. Moving forward from traditional optimisation: grade uncertainty and risk effects in open-pit design, Trans Inst Min Metall, Section A, Mining Technology, 111:A82-A88.
-
-
-
-
7
-
-
35548992349
-
Uncertainty based production scheduling in open pit mining
-
Dimitrakopoulos, R and Ramazan, S, 2004. Uncertainty based production scheduling in open pit mining, SME Transactions, 316:106-112.
-
(2004)
SME Transactions
, vol.316
, pp. 106-112
-
-
Dimitrakopoulos, R.1
Ramazan, S.2
-
8
-
-
0002931897
-
Risk in minerals projects: Analysis, perception and management. Trans Inst Min Metall. Section A
-
Dowd, P A, 1997. Risk in minerals projects: analysis, perception and management. Trans Inst Min Metall. Section A. Mining Technology. 106:A9-A18.
-
(1997)
Mining Technology
, vol.106
-
-
Dowd, P.A.1
-
9
-
-
58049141643
-
The value of additional drilling to open pit mining projects
-
second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Froyland, G, Menabde, M, Stone, P and Hodson, D, 2007. The value of additional drilling to open pit mining projects, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 245-252 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 245-252
-
-
Froyland, G.1
Menabde, M.2
Stone, P.3
Hodson, D.4
-
10
-
-
33750463822
-
Managing risk and waste mining in long-term production scheduling
-
Godoy, M C and Dimitrakopoulos, R, 2004. Managing risk and waste mining in long-term production scheduling. SME Transactions, 316:43-50.
-
(2004)
SME Transactions
, vol.316
, pp. 43-50
-
-
Godoy, M.C.1
Dimitrakopoulos, R.2
-
12
-
-
35548955539
-
-
MPhil thesis, University of Queensland, Brisbane, 204 p
-
Grieco, N J, 2004. Risk analysis of optimal stope design: incorporating grade uncertainty, MPhil thesis, University of Queensland, Brisbane, 204 p.
-
(2004)
Risk analysis of optimal stope design: Incorporating grade uncertainty
-
-
Grieco, N.J.1
-
13
-
-
58049150475
-
-
MSc thesis, University of Queensland, Brisbane, 204 p
-
Kay, M H, 2001. Geostatistical integration of conventional and downhole geophysical data in the metalliferous mine environment, MSc thesis, University of Queensland, Brisbane, 204 p.
-
(2001)
Geostatistical integration of conventional and downhole geophysical data in the metalliferous mine environment
-
-
Kay, M.H.1
-
14
-
-
58049145664
-
Mining schedule optimisation for conditionally simulated orebodies
-
second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Menabde, M, Froyland, G, Stone, P and Yeates, G A, 2007. Mining schedule optimisation for conditionally simulated orebodies, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 379-383 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 379-383
-
-
Menabde, M.1
Froyland, G.2
Stone, P.3
Yeates, G.A.4
-
15
-
-
58049157623
-
-
Myers. P, Standing, C, Collier. P and Noppe, M, 2007. Assessing underground mining potential at Ernest Henry Mine using conditional simulation and stope optimisation, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 191-200 (The Australasian Institute of Mining and Metallurgy: Melbourne). Ovanic, J, 1998. Economic optimization of stope geometry, PhD thesis, Michigan Technological University, Houghton.
-
Myers. P, Standing, C, Collier. P and Noppe, M, 2007. Assessing underground mining potential at Ernest Henry Mine using conditional simulation and stope optimisation, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 191-200 (The Australasian Institute of Mining and Metallurgy: Melbourne). Ovanic, J, 1998. Economic optimization of stope geometry, PhD thesis, Michigan Technological University, Houghton.
-
-
-
-
16
-
-
58049167547
-
Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation
-
second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Ramazan, S and Dimitrakopoulos. R, 2007. Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 385-391 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 385-391
-
-
Ramazan, S.1
Dimitrakopoulos, R.2
-
17
-
-
58049177586
-
-
Ravenscroft, P J, 1992. Risk analysis for mine scheduling by conditional simulation, Trans Inst Min Metall, Section A, Mining Technology. 101:A104-A108.
-
Ravenscroft, P J, 1992. Risk analysis for mine scheduling by conditional simulation, Trans Inst Min Metall, Section A, Mining Technology. 101:A104-A108.
-
-
-
-
18
-
-
0036605160
-
Geostatistical simulations for risk assessment and decision making: The mining industry perspective
-
Rendu, J-M, 2002. Geostatistical simulations for risk assessment and decision making: the mining industry perspective, International Journal of Surface Mining, Reclamation and Environment, 16:122-133.
-
(2002)
International Journal of Surface Mining, Reclamation and Environment
, vol.16
, pp. 122-133
-
-
Rendu, J.-M.1
-
19
-
-
58049153203
-
-
Roos, 2001. Underground tour guidebook, Kidd Creek Mine, p 21. Thomas. G and Earl, A, 1999. The application of second-generation stope optimisation tools in underground cut-off grade analysis, in Proceedings Strategic Mine Planning, pp 175-180 (Whittle Programming Pty Ltd: Perth).
-
Roos, 2001. Underground tour guidebook, Kidd Creek Mine, p 21. Thomas. G and Earl, A, 1999. The application of second-generation stope optimisation tools in underground cut-off grade analysis, in Proceedings Strategic Mine Planning, pp 175-180 (Whittle Programming Pty Ltd: Perth).
-
-
-
-
20
-
-
1842764835
-
Resource/reserve inventories: What are the objectives?
-
Vallee. M, 1999. Resource/reserve inventories: what are the objectives? CIM Bulletin, 92(1031): 151-155.
-
(1999)
CIM Bulletin
, vol.92
, Issue.1031
, pp. 151-155
-
-
Vallee, M.1
|