메뉴 건너뛰기




Volumn , Issue , 2007, Pages 191-200

Assessing underground mining potential at ernest henry mine using conditional simulation and stope optimisation

Author keywords

[No Author keywords available]

Indexed keywords

COPPER; MANGANESE COMPOUNDS; MINERAL RESOURCES; MINERALS; MINES; MINING; ORE DEPOSITS; PLANNING; POPULATION STATISTICS; RISK ANALYSIS; RISK MANAGEMENT; SEQUENTIAL SWITCHING; SILICA; SILICATE MINERALS; STOPING; SUBSIDENCE;

EID: 58049157623     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (7)

References (9)
  • 2
    • 58049175614 scopus 로고    scopus 로고
    • Australasian Institute of Mining and Metallurgy: Melbourne. Collier, P A and Bryant, J D, 2003. Successful mineral resource development at the Ernest Henry copper-gold mine, NW Queensland, in Proceedings Fifth International Mining Geology Conference, pp 73-88 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • Australasian Institute of Mining and Metallurgy: Melbourne). Collier, P A and Bryant, J D, 2003. Successful mineral resource development at the Ernest Henry copper-gold mine, NW Queensland, in Proceedings Fifth International Mining Geology Conference, pp 73-88 (The Australasian Institute of Mining and Metallurgy: Melbourne).
  • 5
    • 58049186309 scopus 로고    scopus 로고
    • Grieco, N, 2003. Risk analysis of optimal stope design: Incorporating uncertainty, Thesis, Master of Philosophy, The University of Queensland, 204 p.
    • Grieco, N, 2003. Risk analysis of optimal stope design: Incorporating uncertainty, Thesis, Master of Philosophy, The University of Queensland, 204 p.
  • 6
    • 58049174943 scopus 로고    scopus 로고
    • Grade uncertainty in stope design - Improving the optimisation process
    • second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Grieco, N and Dimitrakopoulos, R, 2007. Grade uncertainty in stope design - Improving the optimisation process, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 167-174 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2007) Orebody Modelling and Strategic Mine Planning , pp. 167-174
    • Grieco, N.1    Dimitrakopoulos, R.2
  • 7
    • 35548937826 scopus 로고    scopus 로고
    • PhD thesis, Michigan Technological University, Houghton, 209 p
    • Ovanic, J, 1998. Economic optimization of stope geometry, PhD thesis, Michigan Technological University, Houghton, 209 p.
    • (1998) Economic optimization of stope geometry
    • Ovanic, J.1
  • 8
    • 1842506001 scopus 로고    scopus 로고
    • Poniewierski, I, MacSporran, G and Sheppard, 1, 2003. Optimisation of cut-off grade at Mount Isa Mines Limited's Enterprise Mine, in Proceedings Twelfth International Symposium on Mine Planning and Equipment Selection, MPES 2003, pp 531-538 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • Poniewierski, I, MacSporran, G and Sheppard, 1, 2003. Optimisation of cut-off grade at Mount Isa Mines Limited's Enterprise Mine, in Proceedings Twelfth International Symposium on Mine Planning and Equipment Selection, MPES 2003, pp 531-538 (The Australasian Institute of Mining and Metallurgy: Melbourne).
  • 9
    • 58049149811 scopus 로고    scopus 로고
    • The application of second-generation stope optimisation tools in underground cut-off grade analysis
    • Whittle Programming Pty Ltd: Melbourne
    • Thomas, G S and Earl, A, 1999. The application of second-generation stope optimisation tools in underground cut-off grade analysis, in Proceedings Optimising with Whittle: Strategic Mine Planning Conference, pp 175-180 (Whittle Programming Pty Ltd: Melbourne).
    • (1999) Proceedings Optimising with Whittle: Strategic Mine Planning Conference , pp. 175-180
    • Thomas, G.S.1    Earl, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.