-
1
-
-
58049179133
-
A new efficient joint simulation framework and application in a multivariable deposit
-
second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Boucher, A and Dimitrakopoulos, R, 2007. A new efficient joint simulation framework and application in a multivariable deposit, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 345-354 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 345-354
-
-
Boucher, A.1
Dimitrakopoulos, R.2
-
2
-
-
0042929889
-
An application of branch and cut to open pit mine scheduling
-
Caccetta, L and Hill, S P, 2003. An application of branch and cut to open pit mine scheduling, Journal of Global Optimisation, 27:349-365.
-
(2003)
Journal of Global Optimisation
, vol.27
, pp. 349-365
-
-
Caccetta, L.1
Hill, S.P.2
-
5
-
-
58149161519
-
-
Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
-
Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
-
-
-
-
6
-
-
5144222027
-
-
PhD thesis, 256 p, The University of Queensland, Brisbane
-
Godoy, M C, 2003. The efficient management of geological risk in long-term production scheduling of open pit mines, PhD thesis, 256 p, The University of Queensland, Brisbane.
-
(2003)
The efficient management of geological risk in long-term production scheduling of open pit mines
-
-
Godoy, M.C.1
-
9
-
-
0001886845
-
Optimum design of open pit mines
-
Lerchs, H and Grossmann, I. 1965. Optimum design of open pit mines. Transactions CM, LXVIII: 17-24.
-
(1965)
Transactions CM
, vol.68
, pp. 17-24
-
-
Lerchs, H.1
Grossmann, I.2
-
10
-
-
58049180513
-
Large-scale production scheduling with the fundamental tree algorithm - Model, case study and comparisons
-
second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
-
Ramazan, S, 2007. Large-scale production scheduling with the fundamental tree algorithm - Model, case study and comparisons, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 121-127 (The Australasian Institute of Mining and Metallurgy: Melbourne).
-
(2007)
Orebody Modelling and Strategic Mine Planning
, pp. 121-127
-
-
Ramazan, S.1
-
11
-
-
21644484543
-
Recent applications of operations research in open pit mining
-
Ramazan, S and Dimitrakopoulos, R, 2004. Recent applications of operations research in open pit mining, SME Transactions, 316:73-78.
-
(2004)
SME Transactions
, vol.316
, pp. 73-78
-
-
Ramazan, S.1
Dimitrakopoulos, R.2
-
13
-
-
58149173929
-
Some applications of geostatistics to decision making in exploration
-
Rendu, J M, 1970. Some applications of geostatistics to decision making in exploration, in Proceedings APCOM 1970, pp 175-184.
-
(1970)
Proceedings APCOM
, pp. 175-184
-
-
Rendu, J.M.1
|