메뉴 건너뛰기




Volumn , Issue , 2007, Pages 245-252

The value of additional drilling to open pit mining projects

Author keywords

[No Author keywords available]

Indexed keywords

EXTRACTION; MINES; MINING; ORE DEPOSITS; PLANNING; RISK ANALYSIS; RISK MANAGEMENT;

EID: 58049141643     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (8)

References (13)
  • 1
    • 58049179133 scopus 로고    scopus 로고
    • A new efficient joint simulation framework and application in a multivariable deposit
    • second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Boucher, A and Dimitrakopoulos, R, 2007. A new efficient joint simulation framework and application in a multivariable deposit, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 345-354 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2007) Orebody Modelling and Strategic Mine Planning , pp. 345-354
    • Boucher, A.1    Dimitrakopoulos, R.2
  • 2
    • 0042929889 scopus 로고    scopus 로고
    • An application of branch and cut to open pit mine scheduling
    • Caccetta, L and Hill, S P, 2003. An application of branch and cut to open pit mine scheduling, Journal of Global Optimisation, 27:349-365.
    • (2003) Journal of Global Optimisation , vol.27 , pp. 349-365
    • Caccetta, L.1    Hill, S.P.2
  • 5
    • 58149161519 scopus 로고    scopus 로고
    • Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
    • Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
  • 9
    • 0001886845 scopus 로고
    • Optimum design of open pit mines
    • Lerchs, H and Grossmann, I. 1965. Optimum design of open pit mines. Transactions CM, LXVIII: 17-24.
    • (1965) Transactions CM , vol.68 , pp. 17-24
    • Lerchs, H.1    Grossmann, I.2
  • 10
    • 58049180513 scopus 로고    scopus 로고
    • Large-scale production scheduling with the fundamental tree algorithm - Model, case study and comparisons
    • second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Ramazan, S, 2007. Large-scale production scheduling with the fundamental tree algorithm - Model, case study and comparisons, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 121-127 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2007) Orebody Modelling and Strategic Mine Planning , pp. 121-127
    • Ramazan, S.1
  • 11
    • 21644484543 scopus 로고    scopus 로고
    • Recent applications of operations research in open pit mining
    • Ramazan, S and Dimitrakopoulos, R, 2004. Recent applications of operations research in open pit mining, SME Transactions, 316:73-78.
    • (2004) SME Transactions , vol.316 , pp. 73-78
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 13
    • 58149173929 scopus 로고
    • Some applications of geostatistics to decision making in exploration
    • Rendu, J M, 1970. Some applications of geostatistics to decision making in exploration, in Proceedings APCOM 1970, pp 175-184.
    • (1970) Proceedings APCOM , pp. 175-184
    • Rendu, J.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.