Volumn , Issue , 2007, Pages 385-391

Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation

Author keywords

[No Author keywords available]

Indexed keywords

DYNAMIC PROGRAMMING; INTEGER PROGRAMMING; INTERNET PROTOCOLS; MATHEMATICAL PROGRAMMING; MINES; OPEN PIT MINING; ORE DEPOSITS; ORES; PLANNING; PRODUCTION ENGINEERING; RISK ANALYSIS; RISK MANAGEMENT; RISK PERCEPTION; SCHEDULING; STOCHASTIC MODELS;

EID: 58049167547     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (51)

References (18)
  • 2
    • 58049179133 scopus 로고    scopus 로고
    • A new efficient joint simulation framework and application in a multivariable deposit
    • second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Boucher, A and Dimitrakopoulos, R, 2007. A new efficient joint simulation framework and application in a multivariable deposit, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 345-354 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2007) Orebody Modelling and Strategic Mine Planning , pp. 345-354
    • Boucher, A.1    Dimitrakopoulos, R.2
  • 3
    • 58049186308 scopus 로고    scopus 로고
    • Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
    • Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
  • 4
    • 0036064712 scopus 로고    scopus 로고
    • Dimitrakopoulos, R, Farrelly, C T and Godoy, M, 2002. Moving forward from traditional optimisation: grade uncertainty and risk effects in open-pit design, Trans lust Min Metall, Section A, Mining Technology, 111:A82-A88.
    • Dimitrakopoulos, R, Farrelly, C T and Godoy, M, 2002. Moving forward from traditional optimisation: grade uncertainty and risk effects in open-pit design, Trans lust Min Metall, Section A, Mining Technology, 111:A82-A88.
  • 5
    • 5144235519 scopus 로고    scopus 로고
    • Generalized sequential Gaussian simulation on group size v and screen-effect approximations for large field simulations
    • Dimitrakopoulos, R and Luo, X, 2004. Generalized sequential Gaussian simulation on group size v and screen-effect approximations for large field simulations, Mathematical Geology, 36(5):567-591.
    • (2004) Mathematical Geology , vol.36 , Issue.5 , pp. 567-591
    • Dimitrakopoulos, R.1    Luo, X.2
  • 6
    • 35548992349 scopus 로고    scopus 로고
    • Uncertainty based production scheduling in open pit mining
    • Dimitrakopoulos, R and Ramazan, S, 2004. Uncertainty based production scheduling in open pit mining, SME Transactions, 316:106-112.
    • (2004) SME Transactions , vol.316 , pp. 106-112
    • Dimitrakopoulos, R.1    Ramazan, S.2
  • 7
    • 58049143244 scopus 로고    scopus 로고
    • Dowd, P A, 1997. Risk in minerals projects: analysis, perception and management, Trans Inst Min Metall, Section A, Mining Technology, 106:A9-A18.
    • Dowd, P A, 1997. Risk in minerals projects: analysis, perception and management, Trans Inst Min Metall, Section A, Mining Technology, 106:A9-A18.
  • 8
    • 34250075208 scopus 로고
    • Production planning via scenario modelling
    • Escudero, L F, 1993. Production planning via scenario modelling, Annals of Operations Research, 43:311-335.
    • (1993) Annals of Operations Research , vol.43 , pp. 311-335
    • Escudero, L.F.1
  • 9
    • 58049141643 scopus 로고    scopus 로고
    • The value of additional drilling to open pit mining projects
    • second edition ed: R Dimitrakopoulos, pp, The Australasian Institute of Mining and Metallurgy: Melbourne
    • Froyland, G, Menabde, M, Stone, P and Hodson, D, 2007. The value of additional drilling to open pit mining projects, in Orebody Modelling and Strategic Mine Planning, second edition (ed: R Dimitrakopoulos), pp 245-252 (The Australasian Institute of Mining and Metallurgy: Melbourne).
    • (2007) Orebody Modelling and Strategic Mine Planning , pp. 245-252
    • Froyland, G.1    Menabde, M.2    Stone, P.3    Hodson, D.4
  • 11
    • 33750463822 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling
    • Godoy, M C and Dimitrakopoulos, R, 2004. Managing risk and waste mining in long-term production scheduling, SME Transactions, 316:43-50.
    • (2004) SME Transactions , vol.316 , pp. 43-50
    • Godoy, M.C.1    Dimitrakopoulos, R.2
  • 14
    • 85045793320 scopus 로고    scopus 로고
    • Stochastic integer programming based modelling for long-term production scheduling of open pit mines
    • N-6002-1, University of Queensland, Brisbane
    • Ramazan, S and Dimitrakopoulos, R, 2003. Stochastic integer programming based modelling for long-term production scheduling of open pit mines, ARC-Linkage Report N-6002-1, University of Queensland, Brisbane.
    • (2003) ARC-Linkage Report
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 16
    • 21644484543 scopus 로고    scopus 로고
    • Recent applications of operations research in open pit mining
    • Ramazan, S and Dimitrakopoulos, R, 2004b. Recent applications of operations research in open pit mining, SME Transactions, 316:73-78.
    • (2004) SME Transactions , vol.316 , pp. 73-78
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 17
    • 58049142934 scopus 로고    scopus 로고
    • Extension of SIP modelling for long term production scheduling with stochastically designed stockpiles and multiple ore processors
    • N-6003-1, University of Queensland, Brisbane
    • Ramazan, S, Dimitrakopoulos, R, Benndorf, J and Archambault, L, 2004. Extension of SIP modelling for long term production scheduling with stochastically designed stockpiles and multiple ore processors, ARC-Linkage Report N-6003-1, University of Queensland, Brisbane.
    • (2004) ARC-Linkage Report
    • Ramazan, S.1    Dimitrakopoulos, R.2    Benndorf, J.3    Archambault, L.4
  • 18
    • 58049141941 scopus 로고    scopus 로고
    • Ravenscroft, P J, 1992. Risk analysis for mine scheduling by conditional simulation, Trans Inst Min Metall, Section A, Mining Technology, 101:A104-A108.
    • Ravenscroft, P J, 1992. Risk analysis for mine scheduling by conditional simulation, Trans Inst Min Metall, Section A, Mining Technology, 101:A104-A108.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.