메뉴 건너뛰기




Volumn 31, Issue 1-2, 1996, Pages 205-208

A study of due-date assignment rules with constrained tightness in a dynamic job shop

Author keywords

Dispatching rule; Due date assignment rule; Dynamic job shop; Scheduling; Simulation

Indexed keywords

COMPETITION; COMPUTER SIMULATION; CONSTRAINT THEORY; MARKETING; OPTIMIZATION; PERFORMANCE; PRODUCTION;

EID: 0030270581     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/0360-8352(96)00112-x     Document Type: Article
Times cited : (16)

References (14)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K. R. (1984). Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093-1104.
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 2
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job shop performance
    • Bertrand, J. W. M. (1983). The effect of workload dependent due-dates on job shop performance. Management Science, 29, 799-816.
    • (1983) Management Science , vol.29 , pp. 799-816
    • Bertrand, J.W.M.1
  • 3
    • 0003067640 scopus 로고
    • An investigation of due-date assignment rules with constrained tightness
    • Baker, K. R. and J. W. M. Bertrand (1981). An investigation of due-date assignment rules with constrained tightness. J. Op. Management, 1, 109-120.
    • (1981) J. Op. Management , vol.1 , pp. 109-120
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 4
    • 0002009274 scopus 로고
    • A dynamic priority rule for scheduling against due-dates
    • Baker, K. R. and J. W. M. Bertrand (1982). A dynamic priority rule for scheduling against due-dates. J. Op. Management, 3, 37-42.
    • (1982) J. Op. Management , vol.3 , pp. 37-42
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 5
    • 0002563758 scopus 로고
    • Job shop scheduling with modified due dates
    • Baker, K. R. and J. J. Kanet (1983). Job shop scheduling with modified due dates. J. Op. Management, 4, 11-22.
    • (1983) J. Op. Management , vol.4 , pp. 11-22
    • Baker, K.R.1    Kanet, J.J.2
  • 6
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway, R. W. (1965). Priority dispatching and job lateness in a job shop. J. Ind. Engineering, 16, 228-237.
    • (1965) J. Ind. Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 7
    • 0016929914 scopus 로고
    • Due dates in job shop scheduling
    • Eilon, S. and I. G. Chowdhury (1976). Due dates in job shop scheduling. I. J. Prod. Research, 14, 223-237.
    • (1976) I. J. Prod. Research , vol.14 , pp. 223-237
    • Eilon, S.1    Chowdhury, I.G.2
  • 8
    • 0002835786 scopus 로고
    • Job shop scheduling with due dates
    • Eilon, S. and R. M. Hodgson (1967). Job shop scheduling with due dates. I. J. Prod. Research, 6, 1-13.
    • (1967) I. J. Prod. Research , vol.6 , pp. 1-13
    • Eilon, S.1    Hodgson, R.M.2
  • 9
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee, E. S. and C. H. Smith (1993). Selecting allowance policies for improved job shop performance. I. J. Prod. Research, 31, 1839-1852.
    • (1993) I. J. Prod. Research , vol.31 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 10
    • 0019540666 scopus 로고
    • Combined scheduling system for reducing job tardiness in a job shop
    • Miyazaki, S. (1981). Combined scheduling system for reducing job tardiness in a job shop. I. J. Prod. Research, 19, 201-211.
    • (1981) I. J. Prod. Research , vol.19 , pp. 201-211
    • Miyazaki, S.1
  • 11
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz, G. L. and V. A. Mabert (1984). A simulation analysis of due date assignment rules. J. Op. Management, 5, 27-39.
    • (1984) J. Op. Management , vol.5 , pp. 27-39
    • Ragatz, G.L.1    Mabert, V.A.2
  • 12
    • 0027565391 scopus 로고
    • Mixing static and dynamic flow-time estimates for due-date assignment
    • Vig, M. M. and K. J. Dooley (1993). Mixing static and dynamic flow-time estimates for due-date assignment. J. Op. Management, 11, 67-79.
    • (1993) J. Op. Management , vol.11 , pp. 67-79
    • Vig, M.M.1    Dooley, K.J.2
  • 13
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Weeks, J. K. (1979). A simulation study of predictable due-dates. Management Science, 25, 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 14
    • 0016984996 scopus 로고
    • A simulation study of operating policies in a hypothetical dual-constrained job shop
    • Weeks, J. K. and J. S. Fryer (1976). A simulation study of operating policies in a hypothetical dual-constrained job shop. Management Science, 22, 1362-1371.
    • (1976) Management Science , vol.22 , pp. 1362-1371
    • Weeks, J.K.1    Fryer, J.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.