Volumn 46, Issue 21, 2008, Pages 5883-5905

Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: A simulation study

Author keywords

Decomposition heuristics; Global schedules; Job shop scheduling; Rescheduling; Semiconductor wafer fab scheduling; Simulation

Indexed keywords

DECOMPOSITION HEURISTICS; GLOBAL SCHEDULES; JOB-SHOP SCHEDULING; RESCHEDULING; SEMICONDUCTOR WAFER FAB SCHEDULING; SIMULATION;

EID: 53349152018     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540601156215     Document Type: Article
Times cited : (12)

References (28)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D., The shifting bottleneck procedure for job shop scheduling. Manage. Sci., 1988, 3, 391-401.
    • (1988) Manage. Sci , vol.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0242269826 scopus 로고    scopus 로고
    • Measures of subproblem criticality in decomposition algorithms for shop scheduling
    • Aytug, H., Kempf, K. and Uzsoy, R., Measures of subproblem criticality in decomposition algorithms for shop scheduling. Int. J. Prod. Res., 2003, 41(5), 865-882.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.5 , pp. 865-882
    • Aytug, H.1    Kempf, K.2    Uzsoy, R.3
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainty: A review and some future directions
    • Aytug, H., Lawley, M.A., McKay, K.N., Mohan, S. and Uzsoy, R., Executing production schedules in the face of uncertainty: a review and some future directions. Euro. J. Oper. Res., 2005, 161, 86-110.
    • (2005) Euro. J. Oper. Res , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.N.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 0029195265 scopus 로고
    • The one machine problem with delayed precedence constraints and its use in job shop scheduling
    • Balas, E., Lenstra, J.K. and Vazacopoulos, A., The one machine problem with delayed precedence constraints and its use in job shop scheduling. Manage. Sci., 1995, 41, 94-109.
    • (1995) Manage. Sci , vol.41 , pp. 94-109
    • Balas, E.1    Lenstra, J.K.2    Vazacopoulos, A.3
  • 5
    • 27944495605 scopus 로고    scopus 로고
    • Implementing global factory schedules in the face of stochastic disruptions
    • Barua, A., Narasimhan, R., Upasani, A. and Uzsoy, R., Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res., 2005, 43(4), 793-818.
    • (2005) Int. J. Prod. Res , vol.43 , Issue.4 , pp. 793-818
    • Barua, A.1    Narasimhan, R.2    Upasani, A.3    Uzsoy, R.4
  • 8
    • 0000332876 scopus 로고    scopus 로고
    • Decomposition methods for reentrant flow shops with sequence dependent setup times
    • Demirkol, E. and Uzsoy, R., Decomposition methods for reentrant flow shops with sequence dependent setup times. J. Sched., 2000, 3, 155-177.
    • (2000) J. Sched , vol.3 , pp. 155-177
    • Demirkol, E.1    Uzsoy, R.2
  • 9
    • 0031542280 scopus 로고    scopus 로고
    • A computational study of shifting bottleneck procedures for shop scheduling problems
    • Demirkol, E., Mehta, S. and Uzsoy, R., A computational study of shifting bottleneck procedures for shop scheduling problems. J. Heurist., 1997, 3, 111-137.
    • (1997) J. Heurist , vol.3 , pp. 111-137
    • Demirkol, E.1    Mehta, S.2    Uzsoy, R.3
  • 10
    • 0035917226 scopus 로고    scopus 로고
    • Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility
    • Horiguchi, K., Raghavan, N., Uzsoy, R. and Venkateshwaran, S., Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility. Int. J. Prod. Res., 2001, 39(5), 825-842.
    • (2001) Int. J. Prod. Res , vol.39 , Issue.5 , pp. 825-842
    • Horiguchi, K.1    Raghavan, N.2    Uzsoy, R.3    Venkateshwaran, S.4
  • 11
    • 0030121742 scopus 로고    scopus 로고
    • Extending the shifting bottleneck procedure to real-life applications
    • Ivens, P. and Lambrecht, M., Extending the shifting bottleneck procedure to real-life applications. Euro. J. Oper. Res., 1996, 90, 252-268.
    • (1996) Euro. J. Oper. Res , vol.90 , pp. 252-268
    • Ivens, P.1    Lambrecht, M.2
  • 13
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • Missbauer, H., Aggregate order release planning for time-varying demand. Int. J. Prod. Res., 2002, 40, 699-718.
    • (2002) Int. J. Prod. Res , vol.40 , pp. 699-718
    • Missbauer, H.1
  • 15
    • 0032003355 scopus 로고    scopus 로고
    • Lead-time setting capacity utilization, and pricing decisions under lead-time dependent demand
    • Palaka, K., Erlebacher, S. and Kropp, D.H., Lead-time setting capacity utilization, and pricing decisions under lead-time dependent demand. IIE Trans., 1998, 30, 151-163.
    • (1998) IIE Trans , vol.30 , pp. 151-163
    • Palaka, K.1    Erlebacher, S.2    Kropp, D.H.3
  • 19
    • 53349090292 scopus 로고    scopus 로고
    • Roy, B. and Sussman B., Les Problemes d'Ordonnancement avec Contraintes Disjonctives, 1964, Note DS No. 9 bis, SEMA, Montrouge.
    • Roy, B. and Sussman B., Les Problemes d'Ordonnancement avec Contraintes Disjonctives, 1964, Note DS No. 9 bis, SEMA, Montrouge.
  • 20
    • 2342596201 scopus 로고
    • Practical job shop scheduling
    • Technical Report LPOM-95-12, University of Twente, The Netherlands
    • Schutten, J.M.J., Practical job shop scheduling. Technical Report LPOM-95-12, University of Twente, The Netherlands, 1995.
    • (1995)
    • Schutten, J.M.J.1
  • 22
    • 0032210055 scopus 로고    scopus 로고
    • Price, delivery time guarantees and capacity selection
    • So, K.C. and Song, J.-S., Price, delivery time guarantees and capacity selection. Euro. J. Oper. Res., 1998, 111, 28-49.
    • (1998) Euro. J. Oper. Res , vol.111 , pp. 28-49
    • So, K.C.1    Song, J.-S.2
  • 23
    • 33845487579 scopus 로고    scopus 로고
    • Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
    • Sourirajan, K. and Uzsoy, R., Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Sched., 2007, 10, 41-65.
    • (2007) J. Sched , vol.10 , pp. 41-65
    • Sourirajan, K.1    Uzsoy, R.2
  • 24
    • 33646742941 scopus 로고    scopus 로고
    • A problem reduction approach for scheduling semiconductor wafer fabrication facilities
    • Upasani, A., Uzsoy, R. and Sourirajan, K., A problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Trans. Semicon. Manuf., 2006, 19, 216-225.
    • (2006) IEEE Trans. Semicon. Manuf , vol.19 , pp. 216-225
    • Upasani, A.1    Uzsoy, R.2    Sourirajan, K.3
  • 25
    • 0034655062 scopus 로고    scopus 로고
    • Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
    • Uzsoy, R. and Wang, C., Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. Int. J. Prod. Res., 2000, 38(6), 1271-1286.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.6 , pp. 1271-1286
    • Uzsoy, R.1    Wang, C.2
  • 26
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning. IIE Trans. Sched. Logist., 1992, 24, 47-60.
    • (1992) IIE Trans. Sched. Logist , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 27
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part II: Shop floor control
    • Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry. Part II: shop floor control. IIE Trans. Sched. Logist., 1994, 26, 44-55.
    • (1994) IIE Trans. Sched. Logist , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 28
    • 0003768868 scopus 로고
    • edited by M. Zweben and M. Fox, Morgan Kaufman: San Francisco, CA
    • Zweben, M. and Fox, M., In Intelligent Scheduling, edited by M. Zweben and M. Fox, 1994 (Morgan Kaufman: San Francisco, CA).
    • (1994) Intelligent Scheduling
    • Zweben, M.1    Fox, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.