-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., Balas, E. and Zawack, D., The shifting bottleneck procedure for job shop scheduling. Manage. Sci., 1988, 3, 391-401.
-
(1988)
Manage. Sci
, vol.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0242269826
-
Measures of subproblem criticality in decomposition algorithms for shop scheduling
-
Aytug, H., Kempf, K. and Uzsoy, R., Measures of subproblem criticality in decomposition algorithms for shop scheduling. Int. J. Prod. Res., 2003, 41(5), 865-882.
-
(2003)
Int. J. Prod. Res
, vol.41
, Issue.5
, pp. 865-882
-
-
Aytug, H.1
Kempf, K.2
Uzsoy, R.3
-
3
-
-
5144232431
-
Executing production schedules in the face of uncertainty: A review and some future directions
-
Aytug, H., Lawley, M.A., McKay, K.N., Mohan, S. and Uzsoy, R., Executing production schedules in the face of uncertainty: a review and some future directions. Euro. J. Oper. Res., 2005, 161, 86-110.
-
(2005)
Euro. J. Oper. Res
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.N.3
Mohan, S.4
Uzsoy, R.5
-
4
-
-
0029195265
-
The one machine problem with delayed precedence constraints and its use in job shop scheduling
-
Balas, E., Lenstra, J.K. and Vazacopoulos, A., The one machine problem with delayed precedence constraints and its use in job shop scheduling. Manage. Sci., 1995, 41, 94-109.
-
(1995)
Manage. Sci
, vol.41
, pp. 94-109
-
-
Balas, E.1
Lenstra, J.K.2
Vazacopoulos, A.3
-
5
-
-
27944495605
-
Implementing global factory schedules in the face of stochastic disruptions
-
Barua, A., Narasimhan, R., Upasani, A. and Uzsoy, R., Implementing global factory schedules in the face of stochastic disruptions. Int. J. Prod. Res., 2005, 43(4), 793-818.
-
(2005)
Int. J. Prod. Res
, vol.43
, Issue.4
, pp. 793-818
-
-
Barua, A.1
Narasimhan, R.2
Upasani, A.3
Uzsoy, R.4
-
8
-
-
0000332876
-
Decomposition methods for reentrant flow shops with sequence dependent setup times
-
Demirkol, E. and Uzsoy, R., Decomposition methods for reentrant flow shops with sequence dependent setup times. J. Sched., 2000, 3, 155-177.
-
(2000)
J. Sched
, vol.3
, pp. 155-177
-
-
Demirkol, E.1
Uzsoy, R.2
-
9
-
-
0031542280
-
A computational study of shifting bottleneck procedures for shop scheduling problems
-
Demirkol, E., Mehta, S. and Uzsoy, R., A computational study of shifting bottleneck procedures for shop scheduling problems. J. Heurist., 1997, 3, 111-137.
-
(1997)
J. Heurist
, vol.3
, pp. 111-137
-
-
Demirkol, E.1
Mehta, S.2
Uzsoy, R.3
-
10
-
-
0035917226
-
Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility
-
Horiguchi, K., Raghavan, N., Uzsoy, R. and Venkateshwaran, S., Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility. Int. J. Prod. Res., 2001, 39(5), 825-842.
-
(2001)
Int. J. Prod. Res
, vol.39
, Issue.5
, pp. 825-842
-
-
Horiguchi, K.1
Raghavan, N.2
Uzsoy, R.3
Venkateshwaran, S.4
-
11
-
-
0030121742
-
Extending the shifting bottleneck procedure to real-life applications
-
Ivens, P. and Lambrecht, M., Extending the shifting bottleneck procedure to real-life applications. Euro. J. Oper. Res., 1996, 90, 252-268.
-
(1996)
Euro. J. Oper. Res
, vol.90
, pp. 252-268
-
-
Ivens, P.1
Lambrecht, M.2
-
13
-
-
0037085145
-
Aggregate order release planning for time-varying demand
-
Missbauer, H., Aggregate order release planning for time-varying demand. Int. J. Prod. Res., 2002, 40, 699-718.
-
(2002)
Int. J. Prod. Res
, vol.40
, pp. 699-718
-
-
Missbauer, H.1
-
15
-
-
0032003355
-
Lead-time setting capacity utilization, and pricing decisions under lead-time dependent demand
-
Palaka, K., Erlebacher, S. and Kropp, D.H., Lead-time setting capacity utilization, and pricing decisions under lead-time dependent demand. IIE Trans., 1998, 30, 151-163.
-
(1998)
IIE Trans
, vol.30
, pp. 151-163
-
-
Palaka, K.1
Erlebacher, S.2
Kropp, D.H.3
-
17
-
-
0003438602
-
-
Prentice-Hall Inc, Englewood Cliffs, NJ
-
Pinedo, M., Scheduling: Theory, Algorithms, Systems, 1995 (Prentice-Hall Inc.: Englewood Cliffs, NJ).
-
(1995)
Scheduling: Theory, Algorithms, Systems
-
-
Pinedo, M.1
-
18
-
-
0003850656
-
-
John Wiley and Sons: New York, Systems Publishing Corporation: West Lafayette, IN
-
Pritsker, A.A.B, O'Reilly, J.J. and LaVal, D.K., Simulation with Visual SLAM and AweSim, 1997 (John Wiley and Sons: New York, Systems Publishing Corporation: West Lafayette, IN).
-
(1997)
Simulation with Visual SLAM and AweSim
-
-
Pritsker, A.A.B.1
O'Reilly, J.J.2
LaVal, D.K.3
-
19
-
-
53349090292
-
-
Roy, B. and Sussman B., Les Problemes d'Ordonnancement avec Contraintes Disjonctives, 1964, Note DS No. 9 bis, SEMA, Montrouge.
-
Roy, B. and Sussman B., Les Problemes d'Ordonnancement avec Contraintes Disjonctives, 1964, Note DS No. 9 bis, SEMA, Montrouge.
-
-
-
-
20
-
-
2342596201
-
Practical job shop scheduling
-
Technical Report LPOM-95-12, University of Twente, The Netherlands
-
Schutten, J.M.J., Practical job shop scheduling. Technical Report LPOM-95-12, University of Twente, The Netherlands, 1995.
-
(1995)
-
-
Schutten, J.M.J.1
-
21
-
-
27944471498
-
-
Unpublished MS thesis, School of Industrial Engineering, Purdue University, West Lafayette, IN
-
Schwartz, C., Evaluating work release strategies and dispatching rules in a re-entrant bottleneck system. Unpublished MS thesis, School of Industrial Engineering, Purdue University, West Lafayette, IN, 1996.
-
(1996)
Evaluating work release strategies and dispatching rules in a re-entrant bottleneck system
-
-
Schwartz, C.1
-
22
-
-
0032210055
-
Price, delivery time guarantees and capacity selection
-
So, K.C. and Song, J.-S., Price, delivery time guarantees and capacity selection. Euro. J. Oper. Res., 1998, 111, 28-49.
-
(1998)
Euro. J. Oper. Res
, vol.111
, pp. 28-49
-
-
So, K.C.1
Song, J.-S.2
-
23
-
-
33845487579
-
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
-
Sourirajan, K. and Uzsoy, R., Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Sched., 2007, 10, 41-65.
-
(2007)
J. Sched
, vol.10
, pp. 41-65
-
-
Sourirajan, K.1
Uzsoy, R.2
-
24
-
-
33646742941
-
A problem reduction approach for scheduling semiconductor wafer fabrication facilities
-
Upasani, A., Uzsoy, R. and Sourirajan, K., A problem reduction approach for scheduling semiconductor wafer fabrication facilities. IEEE Trans. Semicon. Manuf., 2006, 19, 216-225.
-
(2006)
IEEE Trans. Semicon. Manuf
, vol.19
, pp. 216-225
-
-
Upasani, A.1
Uzsoy, R.2
Sourirajan, K.3
-
25
-
-
0034655062
-
Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
-
Uzsoy, R. and Wang, C., Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. Int. J. Prod. Res., 2000, 38(6), 1271-1286.
-
(2000)
Int. J. Prod. Res
, vol.38
, Issue.6
, pp. 1271-1286
-
-
Uzsoy, R.1
Wang, C.2
-
26
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning. IIE Trans. Sched. Logist., 1992, 24, 47-60.
-
(1992)
IIE Trans. Sched. Logist
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
27
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry. Part II: Shop floor control
-
Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry. Part II: shop floor control. IIE Trans. Sched. Logist., 1994, 26, 44-55.
-
(1994)
IIE Trans. Sched. Logist
, vol.26
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
28
-
-
0003768868
-
-
edited by M. Zweben and M. Fox, Morgan Kaufman: San Francisco, CA
-
Zweben, M. and Fox, M., In Intelligent Scheduling, edited by M. Zweben and M. Fox, 1994 (Morgan Kaufman: San Francisco, CA).
-
(1994)
Intelligent Scheduling
-
-
Zweben, M.1
Fox, M.2
|