-
1
-
-
3343013632
-
Simulation of a simplified job shop
-
Baker, C. T., and Dzielinski, B. P., 1980, Simulation of a simplified job shop. Management Science, 26(12), 1227-1237.
-
(1980)
Management Science
, vol.26
, Issue.12
, pp. 1227-1237
-
-
Baker, C.T.1
Dzielinski, B.P.2
-
2
-
-
0022807123
-
A Slam II simulation of a simplified flow shop
-
Barrett, R. T., and Barman, S., 1986, A Slam II simulation of a simplified flow shop. Simulation, 47(5), 181-189.
-
(1986)
Simulation
, vol.47
, Issue.5
, pp. 181-189
-
-
Barrett, R.T.1
Barman, S.2
-
3
-
-
0025232146
-
Dispatching rules for a dynamic flow shop
-
Barrett, R. T., and Kadipasaoglu, S. N., 1990, Dispatching rules for a dynamic flow shop. Production and Inventory Management, 31(1), 54-58.
-
(1990)
Production and Inventory Management
, vol.31
, Issue.1
, pp. 54-58
-
-
Barrett, R.T.1
Kadipasaoglu, S.N.2
-
4
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job-shop operations
-
Blackstone, J. H. Jr., Phillips, D. T., and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job-shop operations. International Journal of Production Research, 20(1), 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
5
-
-
0026417688
-
Branch and bound algorithm for the flow shop with multiple processors
-
Brah, S. A., and Hunsucker, J. L., 1991, Branch and bound algorithm for the flow shop with multiple processors. European Journal of Operational Research, 51, 88-99.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.L.2
-
7
-
-
0011788714
-
Network dispatching by the shortest operation discipline
-
Conway, R. W., and Maxwell, W. L., 1962, Network dispatching by the shortest operation discipline. Operations Research, 10(1), 51-73.
-
(1962)
Operations Research
, vol.10
, Issue.1
, pp. 51-73
-
-
Conway, R.W.1
Maxwell, W.L.2
-
8
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway, R. W., 1965, Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16(4), 228-237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, Issue.4
, pp. 228-237
-
-
Conway, R.W.1
-
9
-
-
0002265857
-
Review of sequencing research
-
Day, J. E., and Hottenstein, M. P., 1970, Review of sequencing research. Naval Research Logistics Quarterly, 17(1), 11-36.
-
(1970)
Naval Research Logistics Quarterly
, vol.17
, Issue.1
, pp. 11-36
-
-
Day, J.E.1
Hottenstein, M.P.2
-
10
-
-
0009377460
-
Job shop dispatching rules using various delivery date setting criteria
-
Elvers, D. A., 1973, Job shop dispatching rules using various delivery date setting criteria. Production and Inventory Management, 14(4), 62-70.
-
(1973)
Production and Inventory Management
, vol.14
, Issue.4
, pp. 62-70
-
-
Elvers, D.A.1
-
11
-
-
0016037996
-
The sensitivity of relative effectiveness of job shop dispatching rules with respect to various arrival distributions
-
Elvers, D. A., 1974, The sensitivity of relative effectiveness of job shop dispatching rules with respect to various arrival distributions. AIIE Transactions, 6(1), 41-49.
-
(1974)
AIIE Transactions
, vol.6
, Issue.1
, pp. 41-49
-
-
Elvers, D.A.1
-
12
-
-
0020664019
-
Time completion for various dispatching rules in job shops
-
Elvers, D. A., and Taube, L. R., 1982, Time completion for various dispatching rules in job shops. Omega, 11(1), 81-89.
-
(1982)
Omega
, vol.11
, Issue.1
, pp. 81-89
-
-
Elvers, D.A.1
Taube, L.R.2
-
14
-
-
0023995996
-
Two-stage, hybrid flow shop scheduling problem
-
Gupta, J. N. D., 1988, Two-stage, hybrid flow shop scheduling problem. Journal of Operational Research Society, 39(4), 359-364.
-
(1988)
Journal of Operational Research Society
, vol.39
, Issue.4
, pp. 359-364
-
-
Gupta, J.N.D.1
-
15
-
-
0026190509
-
Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
-
Gupta, J. N. D., and Tunc, E. A., 1991, Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29(7), 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
16
-
-
0003022676
-
Simulation research on job-shop production
-
Jackson, J. R., 1957, Simulation research on job-shop production. Naval Research Logistics Quarterly, 4(4), 287-295.
-
(1957)
Naval Research Logistics Quarterly
, vol.4
, Issue.4
, pp. 287-295
-
-
Jackson, J.R.1
-
17
-
-
0031141578
-
A note on scheduling in hybrid flow systems
-
Kadipasaoglu, S. N., Xiang, W., and Khumawala, B. M., 1995, A note on scheduling in hybrid flow systems. International Journal of Production Research, 35(5), 1491-1494.
-
(1995)
International Journal of Production Research
, vol.35
, Issue.5
, pp. 1491-1494
-
-
Kadipasaoglu, S.N.1
Xiang, W.2
Khumawala, B.M.3
-
18
-
-
0019010962
-
Heuristics for flow shop scheduling
-
King, J. R., and Spachis, A. S., 1980, Heuristics for flow shop scheduling. International Journal of Production Research, 18(3), 345-357.
-
(1980)
International Journal of Production Research
, vol.18
, Issue.3
, pp. 345-357
-
-
King, J.R.1
Spachis, A.S.2
-
19
-
-
0021311118
-
Simulation studies in job-shop scheduling-I
-
Kiran, A. S., and Smith, M. L., 1984a, Simulation studies in job-shop scheduling-I, Computers and Industrial Engineering, 8(2), 87-93.
-
(1984)
Computers and Industrial Engineering
, vol.8
, Issue.2
, pp. 87-93
-
-
Kiran, A.S.1
Smith, M.L.2
-
20
-
-
0021290244
-
Simulation studies in job-shop scheduling-II
-
Kiran, A. S., and Smith, M. L., 1984b, Simulation studies in job-shop scheduling-II, Computers and Industrial Engineering, 8(2), 95-105.
-
(1984)
Computers and Industrial Engineering
, vol.8
, Issue.2
, pp. 95-105
-
-
Kiran, A.S.1
Smith, M.L.2
-
21
-
-
0003460870
-
-
(New York: Wiley)
-
Kotz, S., Johnson, N. L., and Read, C. B., 1983, Encyclopedia of Statistical Sciences (New York: Wiley), 4, 414-416.
-
(1983)
Encyclopedia of Statistical Sciences
, vol.4
, pp. 414-416
-
-
Kotz, S.1
Johnson, N.L.2
Read, C.B.3
-
22
-
-
84990609932
-
Management of vital customer priorities in job-shop manufacturing environments
-
Malhotra, M. K., Jensen, J. B., and Philipoom, P. R., 1995, Management of vital customer priorities in job-shop manufacturing environments. Decision Sciences, 25(5/6), 711-736.
-
(1995)
Decision Sciences
, vol.25
, Issue.5-6
, pp. 711-736
-
-
Malhotra, M.K.1
Jensen, J.B.2
Philipoom, P.R.3
-
23
-
-
0004239348
-
A review of simulation research in job-shop scheduling
-
January
-
Moore, J. M., and Wilson, R. C., 1967, A review of simulation research in job-shop scheduling. Production and Inventory Management, January, 1-10.
-
(1967)
Production and Inventory Management
, pp. 1-10
-
-
Moore, J.M.1
Wilson, R.C.2
-
24
-
-
0021466086
-
Scheduling in a two-stage manufacturing process
-
Narasimhan, S. L., and Panwalkar, S. S., 1984, Scheduling in a two-stage manufacturing process. International Journal of Production Research, 22, 555-564.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 555-564
-
-
Narasimhan, S.L.1
Panwalkar, S.S.2
-
25
-
-
84985846638
-
A comparison of sequencing rules for atwo-stage hybrid flow shop
-
Narasimhan, S. L., and Mangiameli, P. M., 1987, A comparison of sequencing rules for atwo-stage hybrid flow shop. Decision Sciences, 18(2), 250-265.
-
(1987)
Decision Sciences
, vol.18
, Issue.2
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
26
-
-
0003054955
-
A survey of scheduling rules
-
Panwalker, S. S., and Iskander, W., 1977, A survey of scheduling rules. Operations Research, 25(1), 45-61.
-
(1977)
Operations Research
, vol.25
, Issue.1
, pp. 45-61
-
-
Panwalker, S.S.1
Iskander, W.2
-
27
-
-
0023855852
-
An evaluation of static flow shop scheduling heuristics in dynamic flow shop models via a computer simulation
-
Park, Y. B., 1988, An evaluation of static flow shop scheduling heuristics in dynamic flow shop models via a computer simulation. Computers and Industrial Engineering, 14(2), 103-112.
-
(1988)
Computers and Industrial Engineering
, vol.14
, Issue.2
, pp. 103-112
-
-
Park, Y.B.1
-
28
-
-
0021155393
-
A survey and evaluation of static flowshop scheduling heuristics
-
Park, Y. B., Pegden, C. D., and Enscore, E. E., 1984, A survey and evaluation of static flowshop scheduling heuristics. International Journal of Production Research, 22(1), 127-141.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.1
, pp. 127-141
-
-
Park, Y.B.1
Pegden, C.D.2
Enscore, E.E.3
-
29
-
-
0018444331
-
A production scheduling problem in the glass container industry
-
Paul, R. J. A., 1979, A production scheduling problem in the glass container industry. Operations Research, 27, 290-302.
-
(1979)
Operations Research
, vol.27
, pp. 290-302
-
-
Paul, R.J.A.1
-
31
-
-
0024769054
-
Scheduling algorithms for flexible flowshops: Worst and average case performance 5
-
Sriskandarajah, C., and Sehti, S. P., 1989, Scheduling algorithms for flexible flowshops: worst and average case performance 5. European Journal of Operational Research, 43, 143-160.
-
(1989)
European Journal of Operational Research
, vol.43
, pp. 143-160
-
-
Sriskandarajah, C.1
Sehti, S.P.2
-
32
-
-
0040311825
-
Production scheduling system for a hybrid flow shop: A case study
-
Tsubone, H., Ohba, M., Takamuki, H., and Miyake, Y. A., 1993, Production scheduling system for a hybrid flow shop: a case study. Omega, 21(2), 205-214.
-
(1993)
Omega
, vol.21
, Issue.2
, pp. 205-214
-
-
Tsubone, H.1
Ohba, M.2
Takamuki, H.3
Miyake, Y.A.4
-
33
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36(3), 445-453.
-
(1988)
Operations Research
, vol.36
, Issue.3
, pp. 445-453
-
-
Wittrock, R.J.1
|