Volumn 54, Issue 10, 2003, Pages 1038-1049

A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system

Author keywords

Dispatching rules; Printed circuit board manufacturing; Production scheduling; Simulation

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; CUSTOMER SATISFACTION; HEURISTIC METHODS; PARALLEL PROCESSING SYSTEMS; PRINTED CIRCUIT MANUFACTURE;

EID: 0141680814     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601601     Document Type: Article
Times cited : (30)

References (32)
  • 1
    • 0033640802 scopus 로고    scopus 로고
    • Computer simulation of a PCB production line: Metamodeling approach
    • Denggiz B and Akbay KS (2000). Computer simulation of a PCB production line: metamodeling approach. Int J Prod Econ 63: 195-205.
    • (2000) Int J Prod Econ , vol.63 , pp. 195-205
    • Denggiz, B.1    Akbay, K.S.2
  • 2
    • 0032663655 scopus 로고    scopus 로고
    • Component partitioning under demand and capacity uncertainty in printed circuit board assembly
    • Lin WL and Tardif V (1999). Component partitioning under demand and capacity uncertainty in printed circuit board assembly. Int J Flexible Manuf Syst 11: 159-176.
    • (1999) Int J Flexible Manuf Syst , vol.11 , pp. 159-176
    • Lin, W.L.1    Tardif, V.2
  • 3
    • 0026417688 scopus 로고
    • Branch and bound algorithm for the flow shop with multiple processors
    • Brah SA and Hunsucker JL (1991). Branch and bound algorithm for the flow shop with multiple processors. Eur J Opl Res 51: 88-99.
    • (1991) Eur J Opl Res , vol.51 , pp. 88-99
    • Brah, S.A.1    Hunsucker, J.L.2
  • 4
    • 0030106906 scopus 로고    scopus 로고
    • Production scheduling in SMT electronic boards assembly
    • Garetti M, Pozzetti A and Tavecchio R (1996). Production scheduling in SMT electronic boards assembly. Prod Plann Control 7: 197-204.
    • (1996) Prod Plann Control , vol.7 , pp. 197-204
    • Garetti, M.1    Pozzetti, A.2    Tavecchio, R.3
  • 5
    • 0034298575 scopus 로고    scopus 로고
    • Clustering methods for printed circuit board insertion problems
    • Ng MK (2000). Clustering methods for printed circuit board insertion problems. J Opl Res Soc 51: 1205-1211.
    • (2000) J Opl Res Soc , vol.51 , pp. 1205-1211
    • Ng, M.K.1
  • 6
    • 0031375139 scopus 로고    scopus 로고
    • A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line
    • Lim JM (1997). A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line. Comput Ind Eng 33: 789-792.
    • (1997) Comput Ind Eng , vol.33 , pp. 789-792
    • Lim, J.M.1
  • 7
    • 0032268607 scopus 로고    scopus 로고
    • A practical algorithm for cyclic hoist scheduling in a PCB manufacturing
    • Mak RWT, Lam KK and Gupta SR (1998). A practical algorithm for cyclic hoist scheduling in a PCB manufacturing. J Electron Manuf 8: 193-207.
    • (1998) J Electron Manuf , vol.8 , pp. 193-207
    • Mak, R.W.T.1    Lam, K.K.2    Gupta, S.R.3
  • 8
    • 0000814799 scopus 로고    scopus 로고
    • Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
    • Kim YD, Lim HG and Park MW (1996). Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process. Eur J Opl Res 91: 124-143.
    • (1996) Eur J Opl Res , vol.91 , pp. 124-143
    • Kim, Y.D.1    Lim, H.G.2    Park, M.W.3
  • 9
    • 0012651174 scopus 로고    scopus 로고
    • Scheduling printed circuit board production systems using the two-level scheduling approach
    • Lin FR, Shaw MJ and Locascio A (1997). Scheduling printed circuit board production systems using the two-level scheduling approach. J Manuf Syst 16: 129-149.
    • (1997) J Manuf Syst , vol.16 , pp. 129-149
    • Lin, F.R.1    Shaw, M.J.2    Locascio, A.3
  • 10
    • 0034236868 scopus 로고    scopus 로고
    • Scheduling algorithms for computer-aided line balancing in printed circuit board assembly
    • Häyrinen T et al (2000). Scheduling algorithms for computer-aided line balancing in printed circuit board assembly. Prod Plann Control 11: 497-510.
    • (2000) Prod Plann Control , vol.11 , pp. 497-510
    • Häyrinen, T.1
  • 11
    • 0031168243 scopus 로고    scopus 로고
    • Dynamic models of production with multiple operations and general processing times
    • Dessouky MM and Leachman RC (1997). Dynamic models of production with multiple operations and general processing times. J Opl Res Soc 48: 647-654.
    • (1997) J Opl Res Soc , vol.48 , pp. 647-654
    • Dessouky, M.M.1    Leachman, R.C.2
  • 12
    • 0032002955 scopus 로고    scopus 로고
    • Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility
    • Kim YD, Kim JU, Lim SK and Jun HB (1998). Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility. IEEE Trans Semicond Manuf 11: 155-164.
    • (1998) IEEE Trans Semicond Manuf , vol.11 , pp. 155-164
    • Kim, Y.D.1    Kim, J.U.2    Lim, S.K.3    Jun, H.B.4
  • 13
    • 0031705292 scopus 로고    scopus 로고
    • A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities
    • Kim YD, Lee DH, Kim JU and Roh HK (1998). A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities. J Manuf Syst 17: 107-117.
    • (1998) J Manuf Syst , vol.17 , pp. 107-117
    • Kim, Y.D.1    Lee, D.H.2    Kim, J.U.3    Roh, H.K.4
  • 14
    • 0035485317 scopus 로고    scopus 로고
    • Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates
    • Kim YD, Kim JG, Choi B and Kim HU (2001). Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates. IEEE Trans Robot Autom 17: 589-598.
    • (2001) IEEE Trans Robot Autom , vol.17 , pp. 589-598
    • Kim, Y.D.1    Kim, J.G.2    Choi, B.3    Kim, H.U.4
  • 15
    • 0035307346 scopus 로고    scopus 로고
    • A combined dispatching criteria approach to scheduling semiconductor manufacturing systems
    • Dabbas RM, Chen HN, Fowler JW and Shunk D (2001). A combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput Ind Eng 39: 307-324.
    • (2001) Comput Ind Eng , vol.39 , pp. 307-324
    • Dabbas, R.M.1    Chen, H.N.2    Fowler, J.W.3    Shunk, D.4
  • 16
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • Elmaghraby SE (1978). The economic lot scheduling problem (ELSP): review and extensions. Managt Sci 24: 587-598.
    • (1978) Managt Sci , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 17
    • 0023420909 scopus 로고
    • The economic lot scheduling problem: Achieving feasibility using time-varying lot sizes
    • Dobson G (1987). The economic lot scheduling problem: achieving feasibility using time-varying lot sizes. Oper Res 35: 764-771.
    • (1987) Oper Res , vol.35 , pp. 764-771
    • Dobson, G.1
  • 18
    • 0028698197 scopus 로고
    • An economic production lot size model with imperfect quality and variable production rate
    • Khouja M and Mehrez A (1994). An economic production lot size model with imperfect quality and variable production rate. J Opl Res Soc 45: 1405-1417.
    • (1994) J Opl Res Soc , vol.45 , pp. 1405-1417
    • Khouja, M.1    Mehrez, A.2
  • 19
    • 0036602520 scopus 로고    scopus 로고
    • Economic lot scheduling problem with imperfect production processes and setup times
    • Moon I, Giri BC and Choi K (2002). Economic lot scheduling problem with imperfect production processes and setup times. J Opl Res Soc 53: 620-629.
    • (2002) J Opl Res Soc , vol.53 , pp. 620-629
    • Moon, I.1    Giri, B.C.2    Choi, K.3
  • 20
    • 0030194608 scopus 로고    scopus 로고
    • A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
    • Brah SA (1996). A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors. Prod Plann Control 7: 362-373.
    • (1996) Prod Plann Control , vol.7 , pp. 362-373
    • Brah, S.A.1
  • 21
    • 0015669867 scopus 로고
    • An iterative procedure for the single-machine multi-product lot scheduling problem
    • Doll CL and Whybark DC (1973). An iterative procedure for the single-machine multi-product lot scheduling problem. Managt Sci 20: 50-55.
    • (1973) Managt Sci , vol.20 , pp. 50-55
    • Doll, C.L.1    Whybark, D.C.2
  • 22
    • 0022034627 scopus 로고
    • Lot-sizing and lead-time performance in a manufacturing cell
    • Kekre S, Kekre S, Freeman S and Karmarkar US (1985). Lot-sizing and lead-time performance in a manufacturing cell. Interfaces 15(2): 1-9.
    • (1985) Interfaces , vol.15 , Issue.2 , pp. 1-9
    • Kekre, S.1    Kekre, S.2    Freeman, S.3    Karmarkar, U.S.4
  • 23
    • 0003054955 scopus 로고
    • A survey of scheduling rules
    • Panwalkar SS and Iskander W (1977). A survey of scheduling rules. Oper Res 25: 45-61.
    • (1977) Oper Res , vol.25 , pp. 45-61
    • Panwalkar, S.S.1    Iskander, W.2
  • 24
    • 0006884909 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing jobshop operations
    • Blackstone JH, Phillips Jr DT and Hogg DL (1982). A state-of-the-art survey of dispatching rules for manufacturing jobshop operations. Int J Prod Res 25: 1143-1156.
    • (1982) Int J Prod Res , vol.25 , pp. 1143-1156
    • Blackstone, J.H.1    Phillips D.T., Jr.2    Hogg, D.L.3
  • 25
    • 0025430088 scopus 로고
    • A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings
    • Kim YD (1990). A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings. Int J Prod Res 28: 953-962.
    • (1990) Int J Prod Res , vol.28 , pp. 953-962
    • Kim, Y.D.1
  • 26
    • 0029277309 scopus 로고
    • A backward approach in list scheduling algorithms for multi-machine tardiness problems
    • Kim YD (1995). A backward approach in list scheduling algorithms for multi-machine tardiness problems. Comput Oper Res 22: 307-320.
    • (1995) Comput Oper Res , vol.22 , pp. 307-320
    • Kim, Y.D.1
  • 27
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russell RS, Dar-El EM and Taylor III BS (1987). A comparative analysis of the COVERT job sequencing rule using various shop performance measures. Int J Prod Res 25: 1523-1540.
    • (1987) Int J Prod Res , vol.25 , pp. 1523-1540
    • Russell, R.S.1    Dar-El, E.M.2    Taylor B.S. III3
  • 28
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness cost
    • Vepsalainen APJ and Morton TE (1987). Priority rules for job shops with weighted tardiness cost. Managt Sci 33: 1035-1047.
    • (1987) Managt Sci , vol.33 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 29
    • 0030192196 scopus 로고    scopus 로고
    • Heterogeneous dispatching rules in job and flow shops
    • Caskey K and Storch RL (1996). Heterogeneous dispatching rules in job and flow shops. Prod Plann Control 7: 351-361.
    • (1996) Prod Plann Control , vol.7 , pp. 351-361
    • Caskey, K.1    Storch, R.L.2
  • 30
    • 0031256963 scopus 로고    scopus 로고
    • Simple priority rule combinations: An approach to improve both flow time and tardiness
    • Barman S (1997). Simple priority rule combinations: an approach to improve both flow time and tardiness. Int J Prod Res 35: 2857-2870.
    • (1997) Int J Prod Res , vol.35 , pp. 2857-2870
    • Barman, S.1
  • 31
    • 0032074551 scopus 로고    scopus 로고
    • The impact of priority rule combinations on lateness and tardiness
    • Barman S (1998). The impact of priority rule combinations on lateness and tardiness. IIE Trans 30: 495-504.
    • (1998) IIE Trans , vol.30 , pp. 495-504
    • Barman, S.1
  • 32
    • 0035837944 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
    • Schirmer A (2001). Resource-constrained project scheduling: an evaluation of adaptive control schemes for parameterized sampling heuristics. Int J Prod Res 39: 1343-1365.
    • (2001) Int J Prod Res , vol.39 , pp. 1343-1365
    • Schirmer, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.