-
1
-
-
0023419094
-
A distributed scheduling method for computer integrated manufacturing: The use of local area networks in cellular systems
-
M.J. Shaw, "A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems" Int. Journal of Production Research, 25(9), pp. 1285-1303, 1987.
-
(1987)
Int. Journal of Production Research
, vol.25
, Issue.9
, pp. 1285-1303
-
-
Shaw, M.J.1
-
3
-
-
0002326640
-
ADDYMS: Architecture for distributed dynamic manufacturing scheduling
-
A. Famili, D.S. Nau, & S.H. Kim. Eds, The AAAI Press
-
J. Butler & H. Ohtsubo. "ADDYMS: Architecture for distributed dynamic manufacturing scheduling." in Artificial Intelligence Applications in Manufacturing, A. Famili, D.S. Nau, & S.H. Kim. Eds, The AAAI Press, 1992, pp. 199-214.
-
(1992)
Artificial Intelligence Applications in Manufacturing
, pp. 199-214
-
-
Butler, J.1
Ohtsubo, H.2
-
4
-
-
0000629441
-
Multi-agent planning and coordination for distributed concurrent engineering
-
S. Balasubramanian, F.P. Maturana & D.H. Norrie, "Multi-agent planning and coordination for distributed concurrent engineering." International Journal of Cooperative Information Systems, 5(2-3), pp.53-179, 1996.
-
(1996)
International Journal of Cooperative Information Systems
, vol.5
, Issue.2-3
, pp. 53-179
-
-
Balasubramanian, S.1
Maturana, F.P.2
Norrie, D.H.3
-
5
-
-
0034205722
-
MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing
-
W. Shen, F. Maturana & D.H. Norrie, "MetaMorph II: an agent-based architecture for distributed intelligent design and manufacturing." Journal of Intelligent Manufacturing, 11(3), pp.237-251, 2000.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, Issue.3
, pp. 237-251
-
-
Shen, W.1
Maturana, F.2
Norrie, D.H.3
-
6
-
-
0342855202
-
The AARIA agent architecture: From manufacturing requirement to agent-based system design
-
V.D. Parunak, A.D. Baker & S.J. Clark, "The AARIA agent architecture: From manufacturing requirement to agent-based system design." Integrated Computer-Aided Engineering, 8(1), pp.45-58, 2001.
-
(2001)
Integrated Computer-Aided Engineering
, vol.8
, Issue.1
, pp. 45-58
-
-
Parunak, V.D.1
Baker, A.D.2
Clark, S.J.3
-
7
-
-
85133749042
-
Agent-based systems for intelligent manufacturing: A state-of-the-art survey
-
W. Shen & D.H. Norrie, "Agent-based systems for intelligent manufacturing: a state-of-the-art survey." Int. Journal of Knowledge and Information Systems, 1(2), pp.129-156, 1999.
-
(1999)
Int. Journal of Knowledge and Information Systems
, vol.1
, Issue.2
, pp. 129-156
-
-
Shen, W.1
Norrie, D.H.2
-
9
-
-
32644476109
-
An agent-based negotiation approach to integrate process planning and scheduling
-
T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung, "An agent-based negotiation approach to integrate process planning and scheduling." Int. Journal of Production Research, 44(7), pp.1331-1351, 2006.
-
(2006)
Int. Journal of Production Research
, vol.44
, Issue.7
, pp. 1331-1351
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
10
-
-
33744827670
-
Dynamic shopfloor scheduling in multi-agent manufacturing systems
-
T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung, "Dynamic shopfloor scheduling in multi-agent manufacturing systems." Expert Systems with Applications, 31(3), pp.486-494, 2006.
-
(2006)
Expert Systems with Applications
, vol.31
, Issue.3
, pp. 486-494
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
11
-
-
33746794581
-
Integrated process planning and scheduling/rescheduling with an agent-based approach
-
T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung, "Integrated process planning and scheduling/rescheduling with an agent-based approach." Int. Journal of Production Research, 44(18-19), pp.3627-3655, 2006.
-
(2006)
Int. Journal of Production Research
, vol.44
, Issue.18-19
, pp. 3627-3655
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
12
-
-
0141741168
-
Machining process sequencing with fuzzy expert system and genetic algorithms
-
T.N. Wong, L.C.F. Chan & H.C.W. Lau,"Machining process sequencing with fuzzy expert system and genetic algorithms." Engineering with Computers, 19(2-3), pp.191-202, 2003.
-
(2003)
Engineering with Computers
, vol.19
, Issue.2-3
, pp. 191-202
-
-
Wong, T.N.1
Chan, L.C.F.2
Lau, H.C.W.3
-
13
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Y.F. Zhang, A.N. Saravanan & J.Y.H. Fuh, "Integration of process planning and scheduling by exploring the flexibility of process planning." Int. Journal of Production Research, 41(3), pp.611-628, 2003.
-
(2003)
Int. Journal of Production Research
, vol.41
, Issue.3
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
-
14
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
R.K. Li, Y.T, Shyu, & S. Adiga, "A heuristic rescheduling algorithm for computer-based production scheduling systems." Int. Journal of Production Research, 31(8), pp.1815-1826, 1993.
-
(1993)
Int. Journal of Production Research
, vol.31
, Issue.8
, pp. 1815-1826
-
-
Li, R.K.1
Shyu, Y.T.2
Adiga, S.3
|