메뉴 건너뛰기




Volumn , Issue , 2008, Pages 410-415

A multi-agent system framework for manufacturing planning and control

Author keywords

Manufacturing planning and control; Multi agent systems; Process plan; Production schedule

Indexed keywords

INDUSTRIAL ENGINEERING; INTELLIGENT CONTROL; MULTI AGENT SYSTEMS; SUPERVISORY PERSONNEL;

EID: 52149097937     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WCICA.2008.4592959     Document Type: Conference Paper
Times cited : (4)

References (15)
  • 1
    • 0023419094 scopus 로고
    • A distributed scheduling method for computer integrated manufacturing: The use of local area networks in cellular systems
    • M.J. Shaw, "A distributed scheduling method for computer integrated manufacturing: the use of local area networks in cellular systems" Int. Journal of Production Research, 25(9), pp. 1285-1303, 1987.
    • (1987) Int. Journal of Production Research , vol.25 , Issue.9 , pp. 1285-1303
    • Shaw, M.J.1
  • 3
    • 0002326640 scopus 로고
    • ADDYMS: Architecture for distributed dynamic manufacturing scheduling
    • A. Famili, D.S. Nau, & S.H. Kim. Eds, The AAAI Press
    • J. Butler & H. Ohtsubo. "ADDYMS: Architecture for distributed dynamic manufacturing scheduling." in Artificial Intelligence Applications in Manufacturing, A. Famili, D.S. Nau, & S.H. Kim. Eds, The AAAI Press, 1992, pp. 199-214.
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 199-214
    • Butler, J.1    Ohtsubo, H.2
  • 5
    • 0034205722 scopus 로고    scopus 로고
    • MetaMorph II: An agent-based architecture for distributed intelligent design and manufacturing
    • W. Shen, F. Maturana & D.H. Norrie, "MetaMorph II: an agent-based architecture for distributed intelligent design and manufacturing." Journal of Intelligent Manufacturing, 11(3), pp.237-251, 2000.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.H.3
  • 6
    • 0342855202 scopus 로고    scopus 로고
    • The AARIA agent architecture: From manufacturing requirement to agent-based system design
    • V.D. Parunak, A.D. Baker & S.J. Clark, "The AARIA agent architecture: From manufacturing requirement to agent-based system design." Integrated Computer-Aided Engineering, 8(1), pp.45-58, 2001.
    • (2001) Integrated Computer-Aided Engineering , vol.8 , Issue.1 , pp. 45-58
    • Parunak, V.D.1    Baker, A.D.2    Clark, S.J.3
  • 7
    • 85133749042 scopus 로고    scopus 로고
    • Agent-based systems for intelligent manufacturing: A state-of-the-art survey
    • W. Shen & D.H. Norrie, "Agent-based systems for intelligent manufacturing: a state-of-the-art survey." Int. Journal of Knowledge and Information Systems, 1(2), pp.129-156, 1999.
    • (1999) Int. Journal of Knowledge and Information Systems , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 9
    • 32644476109 scopus 로고    scopus 로고
    • An agent-based negotiation approach to integrate process planning and scheduling
    • T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung, "An agent-based negotiation approach to integrate process planning and scheduling." Int. Journal of Production Research, 44(7), pp.1331-1351, 2006.
    • (2006) Int. Journal of Production Research , vol.44 , Issue.7 , pp. 1331-1351
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 10
  • 11
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling with an agent-based approach
    • T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung, "Integrated process planning and scheduling/rescheduling with an agent-based approach." Int. Journal of Production Research, 44(18-19), pp.3627-3655, 2006.
    • (2006) Int. Journal of Production Research , vol.44 , Issue.18-19 , pp. 3627-3655
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 12
    • 0141741168 scopus 로고    scopus 로고
    • Machining process sequencing with fuzzy expert system and genetic algorithms
    • T.N. Wong, L.C.F. Chan & H.C.W. Lau,"Machining process sequencing with fuzzy expert system and genetic algorithms." Engineering with Computers, 19(2-3), pp.191-202, 2003.
    • (2003) Engineering with Computers , vol.19 , Issue.2-3 , pp. 191-202
    • Wong, T.N.1    Chan, L.C.F.2    Lau, H.C.W.3
  • 13
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Y.F. Zhang, A.N. Saravanan & J.Y.H. Fuh, "Integration of process planning and scheduling by exploring the flexibility of process planning." Int. Journal of Production Research, 41(3), pp.611-628, 2003.
    • (2003) Int. Journal of Production Research , vol.41 , Issue.3 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3
  • 14
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • R.K. Li, Y.T, Shyu, & S. Adiga, "A heuristic rescheduling algorithm for computer-based production scheduling systems." Int. Journal of Production Research, 31(8), pp.1815-1826, 1993.
    • (1993) Int. Journal of Production Research , vol.31 , Issue.8 , pp. 1815-1826
    • Li, R.K.1    Shyu, Y.T.2    Adiga, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.