메뉴 건너뛰기




Volumn 8, Issue 1, 2001, Pages 45-58

AARIA agent architecture: from manufacturing requirements to agent-based system design

Author keywords

[No Author keywords available]

Indexed keywords

ARTIFICIAL INTELLIGENCE; C (PROGRAMMING LANGUAGE); COMPUTER AIDED DESIGN; COMPUTER ARCHITECTURE; COMPUTER SIMULATION; ENTERPRISE RESOURCE PLANNING; OBJECT ORIENTED PROGRAMMING; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE; SHIPBUILDING;

EID: 0342855202     PISSN: 10692509     EISSN: None     Source Type: Journal    
DOI: 10.3233/ica-2001-8104     Document Type: Article
Times cited : (67)

References (43)
  • 2
    • 0002095797 scopus 로고    scopus 로고
    • Metaphor or Reality: A Case Study Where Agents Bid with Actual Costs to Schedule a Factory
    • S.H. Clearwater, ed., World Scientific Publishing Co. Pte. Ltd.
    • A.D. Baker, Metaphor or Reality: A Case Study Where Agents Bid With Actual Costs to Schedule a Factory, in: Market-Based Control: A Paradigm for Distributed Resource Allocation, S.H. Clearwater, ed., World Scientific Publishing Co. Pte. Ltd., 1996, pp. 184-223.
    • (1996) Market-Based Control: A Paradigm for Distributed Resource Allocation , pp. 184-223
    • Baker, A.D.1
  • 3
    • 0031621768 scopus 로고    scopus 로고
    • A Survey of Factory Control Algorithms That Can be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling, and Pull
    • A.D. Baker, A Survey of Factory Control Algorithms That Can be Implemented in a Multi-Agent Heterarchy: Dispatching, Scheduling, and Pull, Journal of Manufacturing Systems 17(4) (1998), 297-320.
    • (1998) Journal of Manufacturing Systems , vol.17 , Issue.4 , pp. 297-320
    • Baker, A.D.1
  • 7
    • 0026186493 scopus 로고
    • A Distributed Asynchronous System for Predictive and Reactive Scheduling
    • P. Burke and P. Prosser, A Distributed Asynchronous System for Predictive and Reactive Scheduling, Artificial Intelligence in Engineering 6(3) (1991), 106-124.
    • (1991) Artificial Intelligence in Engineering , vol.6 , Issue.3 , pp. 106-124
    • Burke, P.1    Prosser, P.2
  • 8
    • 0001794206 scopus 로고
    • The Distributed Asynchronous Scheduler
    • M.B. Morgan, ed., Morgan Kaufman Publishers, Inc., San Francisco
    • P. Burke and P. Prosser, The Distributed Asynchronous Scheduler, in: Intelligent Scheduling, M.B. Morgan, ed., Morgan Kaufman Publishers, Inc., San Francisco, 1994, pp. 309-339.
    • (1994) Intelligent Scheduling , pp. 309-339
    • Burke, P.1    Prosser, P.2
  • 9
    • 0002326640 scopus 로고
    • ADDYMS: Architecture for Distributed DYnamic Manufacturing Scheduling
    • A. Famili, D.S. Nau and S.H. Kim, eds., AAAI Press/The MIT Press, Menlo Park, CA
    • J. Butler and H. Ohtsubo, ADDYMS: Architecture for Distributed DYnamic Manufacturing Scheduling, in: Artificial Intelligence Applications in Manufacturing, A. Famili, D.S. Nau and S.H. Kim, eds., AAAI Press/The MIT Press, Menlo Park, CA, 1992, pp. 199-214.
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 199-214
    • Butler, J.1    Ohtsubo, H.2
  • 10
    • 0025421243 scopus 로고
    • Synthesis of Heterarchical Manufacturing Systems
    • Elsevier Science Publishers
    • N.A. Duffie, Synthesis of Heterarchical Manufacturing Systems, in Total Integration - Analysis and Synthesis, Elsevier Science Publishers, 1990, pp. 167-174.
    • (1990) Total Integration - Analysis and Synthesis , pp. 167-174
    • Duffie, N.A.1
  • 11
    • 38249029818 scopus 로고
    • Fault-tolerant Heterarchical Control of Heterogeneous Manufacturing System Entities
    • N.A. Duffie, R. Chitturi and J.I. Mou, Fault-tolerant Heterarchical Control of Heterogeneous Manufacturing System Entities, Journal of Manufacturing Systems 7(4) (1988), 315-328.
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.4 , pp. 315-328
    • Duffie, N.A.1    Chitturi, R.2    Mou, J.I.3
  • 13
    • 0001811353 scopus 로고
    • Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing
    • M.B. Morgan, ed., Morgan Kaufman Publishers, Inc., San Francisco
    • K. Fordyce and G.G. Sullivan, Logistics Management System (LMS): Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing, in: Intelligent Scheduling, M.B. Morgan, ed., Morgan Kaufman Publishers, Inc., San Francisco, 1994, pp. 473-516.
    • (1994) Intelligent Scheduling , pp. 473-516
    • Fordyce, K.1    Sullivan, G.G.2
  • 15
    • 0342424186 scopus 로고
    • Agent Architecture Distributes Decisions for the Agile Manufacturer: Reengineering at AlliedSignal Automotive Safety Restraint Systems
    • June
    • J. Heaton, Agent Architecture Distributes Decisions for the Agile Manufacturer: Reengineering at AlliedSignal Automotive Safety Restraint Systems, AMR Report (June 1994), 8-13.
    • (1994) AMR Report , pp. 8-13
    • Heaton, J.1
  • 16
    • 0042299960 scopus 로고
    • BOSS: An Artifically Intelligent System for Distributed Factory Scheduling
    • F. Kimura and A. Rolstadas, eds., Elsevier
    • J.E. Hynynen, BOSS: An Artifically Intelligent System for Distributed Factory Scheduling, in: Computer Applications in Production and Engineering, F. Kimura and A. Rolstadas, eds., Elsevier, 1989, pp. 667-677.
    • (1989) Computer Applications in Production and Engineering , pp. 667-677
    • Hynynen, J.E.1
  • 20
    • 84950937653 scopus 로고
    • Integrated Shop Floor Control using Autonomous Agents
    • G.Y.-J. Lin and J. Solberg, Integrated Shop Floor Control using Autonomous Agents, IIE Transactions 24(3) (1992), 57-71.
    • (1992) IIE Transactions , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.-J.1    Solberg, J.2
  • 22
    • 0002585363 scopus 로고
    • A Computer Architecture for Small-Batch Manufacturing
    • C. McLean, M. Mitchell and E. Barkmeyer, A Computer Architecture for Small-Batch Manufacturing, IEEE Spectrum 20(5) (1983), 59-64.
    • (1983) IEEE Spectrum , vol.20 , Issue.5 , pp. 59-64
    • McLean, C.1    Mitchell, M.2    Barkmeyer, E.3
  • 24
    • 0001538571 scopus 로고
    • Manufacturing Experience with the Contract Net
    • M.N. Huhns, ed., Pitman, London
    • H.V.D. Parunak, Manufacturing Experience with the Contract Net, in: Distributed-Artificial Intelligence, M.N. Huhns, ed., Pitman, London, 1987, pp. 285-310.
    • (1987) Distributed-Artificial Intelligence , pp. 285-310
    • Parunak, H.V.D.1
  • 25
    • 0041375781 scopus 로고    scopus 로고
    • 'Go to the Ant': Engineering Principles from Natural Agent Systems
    • H.V.D. Parunak, 'Go to the Ant': Engineering Principles from Natural Agent Systems, Annals of Operations Research 75 (1997), 69-101.
    • (1997) Annals of Operations Research , vol.75 , pp. 69-101
    • Parunak, H.V.D.1
  • 27
    • 0010248878 scopus 로고
    • Material Handling: A Conservative Domain for Neural Connectivity and Propagation
    • American Association for Artificial Intelligence
    • H.V.D. Parunak, J. Kindrick and B. Irish, Material Handling: A Conservative Domain for Neural Connectivity and Propagation, in Proceedings of Sixth National Conference on Artificial Intelligence American Association for Artificial Intelligence, 1987, pp. 307-311.
    • (1987) Proceedings of Sixth National Conference on Artificial Intelligence , pp. 307-311
    • Parunak, H.V.D.1    Kindrick, J.2    Irish, B.3
  • 29
    • 0012595570 scopus 로고
    • FMS Scheduling as Cooperative Problem Solving
    • M.J. Shaw, FMS Scheduling as Cooperative Problem Solving, Annals of Operations Research 17 (1989), 323-346.
    • (1989) Annals of Operations Research , vol.17 , pp. 323-346
    • Shaw, M.J.1
  • 32
    • 0031142080 scopus 로고    scopus 로고
    • Coordination Mechanisms for Multi-Agent Manufacturing Systems: Applications to Integrated Manufacturing Scheduling
    • 2 May
    • R. Sikora and M.J. Shaw, Coordination Mechanisms for Multi-Agent Manufacturing Systems: Applications to Integrated Manufacturing Scheduling, IEEE Transactions on Engineering Management 44 (2 May, 1997), 175-187.
    • (1997) IEEE Transactions on Engineering Management , vol.44 , pp. 175-187
    • Sikora, R.1    Shaw, M.J.2
  • 34
    • 0032045595 scopus 로고    scopus 로고
    • A dynamic scheduling holon for manufacturing orders
    • 2 April
    • P. Sousa and C. Ramos, A dynamic scheduling holon for manufacturing orders, Journal of Intelligent Manufacturing 9 (2 April, 1998), 107-112.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 107-112
    • Sousa, P.1    Ramos, C.2
  • 35
    • 0026103848 scopus 로고
    • Resource Allocation in Distributed Factory Scheduling
    • 1 Feb.
    • K.P. Sycara, S.F. Roth, N. Sadeh and M. Fox, Resource Allocation in Distributed Factory Scheduling, IEEE Expert 6 (1 Feb. 1991), 29-40.
    • (1991) IEEE Expert , vol.6 , pp. 29-40
    • Sycara, K.P.1    Roth, S.F.2    Sadeh, N.3    Fox, M.4
  • 37
    • 0001798465 scopus 로고    scopus 로고
    • Machining Task Allocation in Discrete Manufacturing Systems
    • S.H. Clearwater, ed., World Scientific Publishing Co. Pte. Ltd.
    • K.J. Tilley, Machining Task Allocation in Discrete Manufacturing Systems, in: Market-Based Control: A Paradigm for Distributed Resource Allocation, S.H. Clearwater, ed., World Scientific Publishing Co. Pte. Ltd., 1996, pp. 224-252.
    • (1996) Market-Based Control: A Paradigm for Distributed Resource Allocation , pp. 224-252
    • Tilley, K.J.1
  • 40
    • 0032046643 scopus 로고    scopus 로고
    • An emergent modelling method for dynamic scheduling
    • 2 April
    • J. Vaario and K. Ueda, An emergent modelling method for dynamic scheduling, Journal of Intelligent Manufacturing 9(2 April, 1998), 129-140.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 129-140
    • Vaario, J.1    Ueda, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.