메뉴 건너뛰기




Volumn , Issue , 2007, Pages 1362-1367

Profit-based short-term hydro scheduling considering head-dependent power generation

Author keywords

Hydroelectric power generation; Nonlinear programming; Power generation scheduling

Indexed keywords

COMPUTER NETWORKS; HYDROELECTRIC GENERATORS; MATHEMATICAL PROGRAMMING; SCHEDULING;

EID: 50849107325     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PCT.2007.4538514     Document Type: Conference Paper
Times cited : (28)

References (30)
  • 1
    • 33244473987 scopus 로고    scopus 로고
    • Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model
    • Apr
    • J. P. S. Catalão, S. J. P. S. Mariano, V. M. F. Mendes, and L. A. F. M. Ferreira, "Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model," Electr. Power Syst. Res., vol. 76, pp. 404-412, Apr. 2006.
    • (2006) Electr. Power Syst. Res , vol.76 , pp. 404-412
    • Catalão, J.P.S.1    Mariano, S.J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 3
    • 42449088148 scopus 로고    scopus 로고
    • Scheduling of head-sensitive cascaded hydro systems: A comparison based on numerical simulation results
    • to be published
    • J. P. S. Catalão, S. J. P. S. Mariano, V. M. F. Mendes, and L. A. F. M. Ferreira, "Scheduling of head-sensitive cascaded hydro systems: a comparison based on numerical simulation results," Int. J. Power Energy Syst., to be published.
    • Int. J. Power Energy Syst
    • Catalão, J.P.S.1    Mariano, S.J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 4
    • 0023399620 scopus 로고
    • Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems
    • Aug
    • S. M. Amado and C. C. Ribeiro, "Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems," IEEE Trans. Power Syst., vol. PWRS-2, pp. 758-763, Aug. 1987.
    • (1987) IEEE Trans. Power Syst , vol.PWRS-2 , pp. 758-763
    • Amado, S.M.1    Ribeiro, C.C.2
  • 5
    • 0025473373 scopus 로고
    • Hydroelectric generation scheduling with an effective differential dynamic programming algorithm
    • Aug
    • S.-C. Chang, C.-H. Chen, I.-K. Fong, and P. B. Luh, "Hydroelectric generation scheduling with an effective differential dynamic programming algorithm," IEEE Trans. Power Syst., vol. 5, pp. 737-743, Aug. 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , pp. 737-743
    • Chang, S.-C.1    Chen, C.-H.2    Fong, I.-K.3    Luh, P.B.4
  • 6
    • 0029407272 scopus 로고
    • A multiobjective approach to the shortterm scheduling of a hydroelectric power system
    • Nov
    • C. Lyra and L. R. M. Ferreira, "A multiobjective approach to the shortterm scheduling of a hydroelectric power system," IEEE Trans. Power Syst., vol. 10, pp. 1750-1755, Nov. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , pp. 1750-1755
    • Lyra, C.1    Ferreira, L.R.M.2
  • 8
    • 0030147542 scopus 로고    scopus 로고
    • Short-term hydro-scheduling using Hopfield neural network
    • May
    • R.-H. Liang and Y.-Y. Hsu, "Short-term hydro-scheduling using Hopfield neural network," IEE Proc.-Gener. Transm. Distrib., vol. 143, pp. 269-275, May 1996.
    • (1996) IEE Proc.-Gener. Transm. Distrib , vol.143 , pp. 269-275
    • Liang, R.-H.1    Hsu, Y.-Y.2
  • 9
    • 0034138954 scopus 로고    scopus 로고
    • Hydro system scheduling using ANN approach
    • Feb
    • R. Naresh and J. Sharma, "Hydro system scheduling using ANN approach," IEEE Trans. Power Syst., vol. 15, pp. 388-395, Feb. 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , pp. 388-395
    • Naresh, R.1    Sharma, J.2
  • 10
    • 0030148470 scopus 로고    scopus 로고
    • Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination
    • May
    • P.-H. Chen and H.-C. Chang, "Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination," IEEE Trans. Power Syst., vol. 11, pp. 975-981, May 1996.
    • (1996) IEEE Trans. Power Syst , vol.11 , pp. 975-981
    • Chen, P.-H.1    Chang, H.-C.2
  • 13
    • 0028425029 scopus 로고
    • A network flow model for short-term hydro-dominated hydrothermal scheduling problems
    • May
    • P. E. C. Franco, M. F. Carvalho, and S. Soares, "A network flow model for short-term hydro-dominated hydrothermal scheduling problems," IEEE Trans. Power Syst., vol. 9, pp. 1016-1022, May 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , pp. 1016-1022
    • Franco, P.E.C.1    Carvalho, M.F.2    Soares, S.3
  • 14
    • 11344285550 scopus 로고    scopus 로고
    • Short term hydroelectric scheduling combining network flow and interior point approaches
    • Feb
    • A. R. L. Oliveira, S. Soares, and L. Nepomuceno, "Short term hydroelectric scheduling combining network flow and interior point approaches," Int. J. Electr. Power Energy Syst., vol. 27, pp. 91-99, Feb. 2005.
    • (2005) Int. J. Electr. Power Energy Syst , vol.27 , pp. 91-99
    • Oliveira, A.R.L.1    Soares, S.2    Nepomuceno, L.3
  • 15
    • 0024054360 scopus 로고
    • Optimal short term operation of a purely hydroelectric system
    • Aug
    • E. B. Hreinsson, "Optimal short term operation of a purely hydroelectric system," IEEE Trans. Power Syst., vol. 3, pp. 1072-1077, Aug. 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , pp. 1072-1077
    • Hreinsson, E.B.1
  • 16
    • 0028428070 scopus 로고
    • Optimal short-term scheduling for a large-scale cascaded hydro system
    • May
    • M. R. Piekutowski, T. Litwinowicz, and R. J. Frowd, "Optimal short-term scheduling for a large-scale cascaded hydro system," IEEE Trans. Power Syst., vol. 9, pp. 805-811, May 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , pp. 805-811
    • Piekutowski, M.R.1    Litwinowicz, T.2    Frowd, R.J.3
  • 18
    • 0030084671 scopus 로고    scopus 로고
    • Mixed-integer programming applied to short-term planning of a hydro-thermal system
    • Feb
    • O. Nilsson and D. Sjelvgren, "Mixed-integer programming applied to short-term planning of a hydro-thermal system," IEEE Trans. Power Syst., vol. 11, pp. 281-286, Feb. 1996.
    • (1996) IEEE Trans. Power Syst , vol.11 , pp. 281-286
    • Nilsson, O.1    Sjelvgren, D.2
  • 19
    • 0033080313 scopus 로고    scopus 로고
    • Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
    • Feb
    • X. Guan, A. Svoboda, and C.-A. Li, "Scheduling hydro power systems with restricted operating zones and discharge ramping constraints," IEEE Trans. Power Syst., vol. 14, pp. 126-131, Feb. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , pp. 126-131
    • Guan, X.1    Svoboda, A.2    Li, C.-A.3
  • 21
    • 0036872146 scopus 로고    scopus 로고
    • Self-scheduling of a hydro producer in a pool-based electricity market
    • Nov
    • A. J. Conejo, J. M. Arroyo, J. Contreras, and F. A. Villamor, "Self-scheduling of a hydro producer in a pool-based electricity market," IEEE Trans. Power Syst., vol. 17, pp. 1265-1272, Nov. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , pp. 1265-1272
    • Conejo, A.J.1    Arroyo, J.M.2    Contreras, J.3    Villamor, F.A.4
  • 22
    • 33646075166 scopus 로고    scopus 로고
    • Improving the B&B search for largescale hydrothermal weekly scheduling problems
    • Jun
    • E. Parrilla, J. García-González, "Improving the B&B search for largescale hydrothermal weekly scheduling problems," Int. J. Electr. Power Energy Syst., vol. 28, pp. 339-348, Jun. 2006.
    • (2006) Int. J. Electr. Power Energy Syst , vol.28 , pp. 339-348
    • Parrilla, E.1    García-González, J.2
  • 23
    • 0032592944 scopus 로고    scopus 로고
    • Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs
    • Aug
    • E. Ni, X. Guan, and R. Li, "Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs," IEEE Trans. Power Syst., vol. 14, pp. 1127-1132, Aug. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , pp. 1127-1132
    • Ni, E.1    Guan, X.2    Li, R.3
  • 24
    • 51549121013 scopus 로고    scopus 로고
    • J. P. S. Catalão, S. J. P. S. Mariano, V. M. F. Mendes, and L. A. F. M. Ferreira, Nonlinear approach for short-term scheduling of a head-sensitive hydro chain, presented at the IEEE Power Tech Conf., St. Petersburg, Russia, 2005.
    • J. P. S. Catalão, S. J. P. S. Mariano, V. M. F. Mendes, and L. A. F. M. Ferreira, "Nonlinear approach for short-term scheduling of a head-sensitive hydro chain," presented at the IEEE Power Tech Conf., St. Petersburg, Russia, 2005.
  • 25
    • 0036474056 scopus 로고    scopus 로고
    • Optimal dispatch of generating units of the Itaipú hydroelectric plant
    • Feb
    • A. Arce, T. Ohishi, and S. Soares, "Optimal dispatch of generating units of the Itaipú hydroelectric plant," IEEE Trans. Power Syst., vol. 17, pp. 154-158, Feb. 2002.
    • (2002) IEEE Trans. Power Syst , vol.17 , pp. 154-158
    • Arce, A.1    Ohishi, T.2    Soares, S.3
  • 26
    • 84983135060 scopus 로고    scopus 로고
    • Power generation efficiency improvement in cascaded and head-dependent reservoirs
    • presented at the, Liege, Belgium
    • S. Mariano, J. Catalão, V. Mendes, and L. Ferreira, "Power generation efficiency improvement in cascaded and head-dependent reservoirs," presented at the 15th PSCC, Liege, Belgium, 2005.
    • (2005) 15th PSCC
    • Mariano, S.1    Catalão, J.2    Mendes, V.3    Ferreira, L.4
  • 27
  • 29
    • 0032593007 scopus 로고    scopus 로고
    • Electricity price shortterm forecasting using artificial neural networks
    • Aug
    • B. R. Szkuta, L. A. Sanabria, and T. S. Dillon, "Electricity price shortterm forecasting using artificial neural networks," IEEE Trans. Power Syst., vol. 14, pp. 851-857, Aug. 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , pp. 851-857
    • Szkuta, B.R.1    Sanabria, L.A.2    Dillon, T.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.