-
1
-
-
33747982103
-
Short-term resource scheduling in multi-area hydrothermal power systems
-
Jul
-
L. A. F. M. Ferreira, T. Andersson, C. F. Imparato, T. E. Miller, C. K. Pang, A. Svoboda, and A. F. Vojdani, "Short-term resource scheduling in multi-area hydrothermal power systems," Electrical Power & Energy Systems, vol. 11, pp. 200-212, Jul. 1989.
-
(1989)
Electrical Power & Energy Systems
, vol.11
, pp. 200-212
-
-
Ferreira, L.A.F.M.1
Andersson, T.2
Imparato, C.F.3
Miller, T.E.4
Pang, C.K.5
Svoboda, A.6
Vojdani, A.F.7
-
2
-
-
11844251338
-
-
J. P. S. Catalão, S. J. P. S. Mariano, V. M. F. Mendes, and L. A. F. M. Ferreira, Scheduling of head-sensitive cascaded hydro systems: a comparison based on numerical simulation results, in Proc. 4th IASTED Int. Conf. Power and Energy Syst., Rhodes, Greece, 2004, pp. 418-423.
-
J. P. S. Catalão, S. J. P. S. Mariano, V. M. F. Mendes, and L. A. F. M. Ferreira, "Scheduling of head-sensitive cascaded hydro systems: a comparison based on numerical simulation results," in Proc. 4th IASTED Int. Conf. Power and Energy Syst., Rhodes, Greece, 2004, pp. 418-423.
-
-
-
-
3
-
-
0023399620
-
Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems
-
Aug
-
S. M. Amado and C. C. Ribeiro, "Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems," IEEE Trans. Power Syst., vol. PWRS-2, pp. 758-763, Aug. 1987.
-
(1987)
IEEE Trans. Power Syst
, vol.PWRS-2
, pp. 758-763
-
-
Amado, S.M.1
Ribeiro, C.C.2
-
4
-
-
0023534142
-
Optimization-based methods for operations scheduling
-
Dec
-
A. I. Cohen and V. R. Sherkat, "Optimization-based methods for operations scheduling," Proceedings of IEEE, vol. 75, pp. 1574-1591, Dec. 1987.
-
(1987)
Proceedings of IEEE
, vol.75
, pp. 1574-1591
-
-
Cohen, A.I.1
Sherkat, V.R.2
-
5
-
-
0029407272
-
A multiobjective approach to the short-term scheduling of a hydroelectric power system
-
Nov
-
C. Lyra and L. R. M. Ferreira, "A multiobjective approach to the short-term scheduling of a hydroelectric power system," IEEE Trans. Power Syst., vol. 10, pp. 1750-1755, Nov. 1995.
-
(1995)
IEEE Trans. Power Syst
, vol.10
, pp. 1750-1755
-
-
Lyra, C.1
Ferreira, L.R.M.2
-
6
-
-
0036474056
-
Optimal dispatch of generating units of the Itaipú hydroelectric plant
-
Feb
-
A. Arce, T. Ohishi, and S. Soares, "Optimal dispatch of generating units of the Itaipú hydroelectric plant," IEEE Trans. Power Syst., vol. 17, pp. 154-158, Feb. 2002.
-
(2002)
IEEE Trans. Power Syst
, vol.17
, pp. 154-158
-
-
Arce, A.1
Ohishi, T.2
Soares, S.3
-
7
-
-
0346310160
-
A short-term scheduling for a hydropower plant chain
-
Nov
-
J. M. Pursimo, H. K. Antila, M. K. Vilkko, and P. A. Lautala, "A short-term scheduling for a hydropower plant chain," Electrical Power & Energy Systems, vol. 20, pp. 525-532, Nov. 1998.
-
(1998)
Electrical Power & Energy Systems
, vol.20
, pp. 525-532
-
-
Pursimo, J.M.1
Antila, H.K.2
Vilkko, M.K.3
Lautala, P.A.4
-
8
-
-
0030147542
-
Short-term hydro-scheduling using Hopfield neural network
-
May
-
R.-H. Liang and Y.-Y. Hsu, "Short-term hydro-scheduling using Hopfield neural network," IEE Proc.-Gener. Transm. Distrib., vol. 143, pp. 269-275 , May 1996.
-
(1996)
IEE Proc.-Gener. Transm. Distrib
, vol.143
, pp. 269-275
-
-
Liang, R.-H.1
Hsu, Y.-Y.2
-
9
-
-
0034138954
-
Hydro system scheduling using ANN approach
-
Feb
-
R. Naresh and J. Sharma, "Hydro system scheduling using ANN approach," IEEE Trans. Power Syst., vol. 15, pp. 388-395, Feb. 2000.
-
(2000)
IEEE Trans. Power Syst
, vol.15
, pp. 388-395
-
-
Naresh, R.1
Sharma, J.2
-
10
-
-
0030148470
-
Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination
-
May
-
P.-H. Chen and H.-C. Chang, "Genetic aided scheduling of hydraulically coupled plants in hydro-thermal coordination," IEEE Trans. Power Syst., vol. 11, pp. 975-981, May 1996.
-
(1996)
IEEE Trans. Power Syst
, vol.11
, pp. 975-981
-
-
Chen, P.-H.1
Chang, H.-C.2
-
11
-
-
0036474634
-
Energetic operation planning using genetic algorithms
-
Feb
-
P. T. Leite, A. A. F. M. Carneiro, and A. C. P. L. F. Carvalho, "Energetic operation planning using genetic algorithms", IEEE Trans. Power Syst., vol. 17, pp. 173-179, Feb. 2002.
-
(2002)
IEEE Trans. Power Syst
, vol.17
, pp. 173-179
-
-
Leite, P.T.1
Carneiro, A.A.F.M.2
Carvalho, A.C.P.L.F.3
-
12
-
-
0020844951
-
Optimal operations planning in a large hydro-thermal power system
-
Nov
-
D. Sjelvgren, S. Andersson, T. Andersson, U. Nyberg, and T.S. Dillon, "Optimal operations planning in a large hydro-thermal power system," IEEE Trans. Power Apparatus Syst., vol. PAS-102, pp. 3644-3651, Nov. 1983.
-
(1983)
IEEE Trans. Power Apparatus Syst
, vol.PAS-102
, pp. 3644-3651
-
-
Sjelvgren, D.1
Andersson, S.2
Andersson, T.3
Nyberg, U.4
Dillon, T.S.5
-
13
-
-
0028425029
-
A network flow model for short-term hydro-dominated hydrothermal scheduling problems
-
May
-
P. E. C. Franco, M. F. Carvalho, and S. Soares, "A network flow model for short-term hydro-dominated hydrothermal scheduling problems," IEEE Trans. Power Syst., vol. 9, pp. 1016-1022, May 1994.
-
(1994)
IEEE Trans. Power Syst
, vol.9
, pp. 1016-1022
-
-
Franco, P.E.C.1
Carvalho, M.F.2
Soares, S.3
-
14
-
-
0031140147
-
Hydro unit commitment in hydro-thermal optimization
-
May
-
C.-A. Li, E. Hsu, A. J. Svoboda, C.-L. Tseng, and R. B. Johnson, "Hydro unit commitment in hydro-thermal optimization," IEEE Trans. Power Syst., vol. 12, pp. 764-769, May 1997.
-
(1997)
IEEE Trans. Power Syst
, vol.12
, pp. 764-769
-
-
Li, C.-A.1
Hsu, E.2
Svoboda, A.J.3
Tseng, C.-L.4
Johnson, R.B.5
-
15
-
-
11344285550
-
Short term hydroelectric scheduling combining network flow and interior point approaches
-
Feb
-
A. R. L. Oliveira, S. Soares, and L. Nepomuceno, "Short term hydroelectric scheduling combining network flow and interior point approaches," Electrical Power & Energy Systems, vol. 27, pp. 91-99, Feb. 2005.
-
(2005)
Electrical Power & Energy Systems
, vol.27
, pp. 91-99
-
-
Oliveira, A.R.L.1
Soares, S.2
Nepomuceno, L.3
-
16
-
-
0024054360
-
Optimal short term operation of a purely hydroelectric system
-
Aug
-
E. B. Hreinsson, "Optimal short term operation of a purely hydroelectric system," IEEE Trans. Power Syst., vol. 3, pp. 1072-1077, Aug. 1988.
-
(1988)
IEEE Trans. Power Syst
, vol.3
, pp. 1072-1077
-
-
Hreinsson, E.B.1
-
17
-
-
0028428070
-
Optimal short-term scheduling for a large-scale cascaded hydro system
-
May
-
M. R. Piekutowski, T. Litwinowicz, and R. J. Frowd, "Optimal short-term scheduling for a large-scale cascaded hydro system," IEEE Trans. Power Syst., vol. 9, pp. 805-811, May 1994.
-
(1994)
IEEE Trans. Power Syst
, vol.9
, pp. 805-811
-
-
Piekutowski, M.R.1
Litwinowicz, T.2
Frowd, R.J.3
-
19
-
-
0030087188
-
Short-term hydro generation and interchange contract scheduling for Swiss rail
-
Feb
-
M. Christoforidis, B. Awobamise, S. Tong, M. Aganagic, R. J. Frowd, and F. A. Rahimi, "Short-term hydro generation and interchange contract scheduling for Swiss rail," IEEE Trans. Power Syst., vol. 11, pp. 274-280, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst
, vol.11
, pp. 274-280
-
-
Christoforidis, M.1
Awobamise, B.2
Tong, S.3
Aganagic, M.4
Frowd, R.J.5
Rahimi, F.A.6
-
20
-
-
0030084671
-
Mixed-integer programming applied to short-term planning of a hydro-thermal system
-
Feb
-
O. Nilsson and D. Sjelvgren, "Mixed-integer programming applied to short-term planning of a hydro-thermal system," IEEE Trans. Power Syst., vol. 11, pp. 281-286, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst
, vol.11
, pp. 281-286
-
-
Nilsson, O.1
Sjelvgren, D.2
-
21
-
-
0033080313
-
Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
-
Feb
-
X. Guan, A. Svoboda, and C.-A. Li, "Scheduling hydro power systems with restricted operating zones and discharge ramping constraints," IEEE Trans. Power Syst., vol. 14, pp. 126-131, Feb. 1999.
-
(1999)
IEEE Trans. Power Syst
, vol.14
, pp. 126-131
-
-
Guan, X.1
Svoboda, A.2
Li, C.-A.3
-
22
-
-
0035507082
-
Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
-
Nov
-
G. W. Chang, M. Aganagic, J. G. Waight, J. Medina, T. Burton, S. Reeves, and M. Christoforidis, "Experiences with mixed integer linear programming based approaches on short-term hydro scheduling," IEEE Trans. Power Syst., vol. 16, pp. 743-749, Nov. 2001.
-
(2001)
IEEE Trans. Power Syst
, vol.16
, pp. 743-749
-
-
Chang, G.W.1
Aganagic, M.2
Waight, J.G.3
Medina, J.4
Burton, T.5
Reeves, S.6
Christoforidis, M.7
-
23
-
-
0036872146
-
Self-scheduling of a hydro producer in a pool-based electricity market
-
Nov
-
A. J. Conejo, J. M. Arroyo, J. Contreras, and F. A. Villamor, "Self-scheduling of a hydro producer in a pool-based electricity market," IEEE Trans. Power Syst., vol. 17, pp. 1265-1272, Nov. 2002.
-
(2002)
IEEE Trans. Power Syst
, vol.17
, pp. 1265-1272
-
-
Conejo, A.J.1
Arroyo, J.M.2
Contreras, J.3
Villamor, F.A.4
-
24
-
-
34250337602
-
Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming
-
presented at, Porto, Portugal
-
J. García-González and G. A. Castro, "Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming," presented at IEEE Power Tech Conf., Porto, Portugal, 2001.
-
(2001)
IEEE Power Tech Conf
-
-
García-González, J.1
Castro, G.A.2
-
25
-
-
74949121078
-
Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain
-
presented at, Bologna, Italy
-
J. García-González, E. Parrilla, J. Barquín, J. Alonso, A. Sáiz-Chicharro, and A. González, "Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain," presented at IEEE Power Tech Conf., Bologna, Italy, 2003.
-
(2003)
IEEE Power Tech Conf
-
-
García-González, J.1
Parrilla, E.2
Barquín, J.3
Alonso, J.4
Sáiz-Chicharro, A.5
González, A.6
-
26
-
-
0032592944
-
Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs
-
Aug
-
E. Ni, X. Guan, and R. Li, "Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs," IEEE Trans. Power Syst., vol. 14, pp. 1127-1132, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst
, vol.14
, pp. 1127-1132
-
-
Ni, E.1
Guan, X.2
Li, R.3
-
27
-
-
0032593007
-
Electricity price short-term forecasting using artificial neural networks
-
Aug
-
B. R. Szkuta, L. A. Sanabria, and T. S. Dillon, "Electricity price short-term forecasting using artificial neural networks," IEEE Trans. Power Syst., vol. 14, pp. 851-857, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst
, vol.14
, pp. 851-857
-
-
Szkuta, B.R.1
Sanabria, L.A.2
Dillon, T.S.3
-
28
-
-
0036577622
-
Forecasting next-day electricity prices by time series models
-
May
-
F. J. Nogales, J. Contreras, A. J. Conejo, and R. Espínola, "Forecasting next-day electricity prices by time series models," IEEE Trans. Power Syst., vol. 17, pp. 342-348, May 2002.
-
(2002)
IEEE Trans. Power Syst
, vol.17
, pp. 342-348
-
-
Nogales, F.J.1
Contreras, J.2
Conejo, A.J.3
Espínola, R.4
|