-
1
-
-
11844257900
-
Shortterm hydro schedule with head-dependent approach by a nonlinear model
-
Vilamoura, Portugal
-
V.M.F. Mendes, L.A.F.M. Ferreira, & S.J.P.S. Mariano, Shortterm hydro schedule with head-dependent approach by a nonlinear model, Proc. 8th Portuguese-Spanish Congress on Electrical Engineering, Vilamoura, Portugal, 2003, 69-74.
-
(2003)
Proc. 8th Portuguese-Spanish Congress on Electrical Engineering
, pp. 69-74
-
-
Mendes, V.M.F.1
Ferreira, L.A.F.M.2
Mariano, S.J.P.S.3
-
2
-
-
11844285958
-
Short-term hydro scheduling: A comparison of linear with non-linear network mathematical programming
-
Marbella, Spain
-
J.P.S. Catalão, S.J.P.S. Mariano, V.M.F. Mendes, & L.A.F.M. Ferreira, Short-term hydro scheduling: A comparison of linear with non-linear network mathematical programming, Proc. 3rd IASTED Int. Conf. on Power and Energy Systems, Marbella, Spain, 2003, 441-445.
-
(2003)
Proc. 3rd IASTED Int. Conf. on Power and Energy Systems
, pp. 441-445
-
-
Catalão, J.P.S.1
Mariano, S.J.P.S.2
Mendes, V.M.F.3
Ferreira, L.A.F.M.4
-
3
-
-
11844260357
-
-
in Portuguese, master thesis, Instituto Superior Técnico, Technical University of Lisbon, Portugal
-
J.P.S. Catalão, Short-term operational planning of hydroelectric power systems (in Portuguese), master thesis, Instituto Superior Técnico, Technical University of Lisbon, Portugal, 2003.
-
(2003)
Short-term operational planning of hydroelectric power systems
-
-
Catalão, J.P.S.1
-
4
-
-
33747982103
-
Short-term resource scheduling in multi-area hydrothermal power systems
-
L.A.F.M. Ferreira, T. Andersson, C.F. Imparato, T.E. Miller, C.K. Pang, A. Svoboda, & A.F. Vojdani, Short-term resource scheduling in multi-area hydrothermal power systems, International Journal of Electrical Power & Energy Systems, 11(3), 1989, 200-212.
-
(1989)
International Journal of Electrical Power & Energy Systems
, vol.11
, Issue.3
, pp. 200-212
-
-
Ferreira, L.A.F.M.1
Andersson, T.2
Imparato, C.F.3
Miller, T.E.4
Pang, C.K.5
Svoboda, A.6
Vojdani, A.F.7
-
5
-
-
0031270315
-
An optimisation-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints
-
X. Guan, E. Ni, R. Li, & P.B. Luh, An optimisation-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints, IEEE Trans. on Power Systems, 12(4), 1997, 1775-1780.
-
(1997)
IEEE Trans. on Power Systems
, vol.12
, Issue.4
, pp. 1775-1780
-
-
Guan, X.1
Ni, E.2
Li, R.3
Luh, P.B.4
-
6
-
-
0029407272
-
A multiobjective approach to the short-term scheduling of a hydroelectric power system
-
C. Lyra & L.R.M. Ferreira, A multiobjective approach to the short-term scheduling of a hydroelectric power system, IEEE Trans. on Power Systems, 10(4), 1995, 1750-1755.
-
(1995)
IEEE Trans. on Power Systems
, vol.10
, Issue.4
, pp. 1750-1755
-
-
Lyra, C.1
Ferreira, L.R.M.2
-
7
-
-
0023399620
-
Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems
-
S.M. Amado & C.C. Ribeiro, Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems, IEEE Trans. on Power Systems, PWRS-2(3), 1987, 758-763.
-
(1987)
IEEE Trans. on Power Systems
, vol.PWRS-2
, Issue.3
, pp. 758-763
-
-
Amado, S.M.1
Ribeiro, C.C.2
-
9
-
-
0023534142
-
Optimization-based methods for operations scheduling
-
A.I. Cohen & V.R. Sherkat, Optimization-based methods for operations scheduling, Proc. IEEE, 75(12), 1987, 1574-1591.
-
(1987)
Proc. IEEE
, vol.75
, Issue.12
, pp. 1574-1591
-
-
Cohen, A.I.1
Sherkat, V.R.2
-
10
-
-
0031140147
-
Hydro unit commitment in hydro-thermal optimization
-
C.-A. Li, E. Hsu, A.J. Svoboda, C.-L. Tseng, & R.B. Johnson, Hydro unit commitment in hydro-thermal optimization, IEEE Trans. on Power Systems, 12(2), 1997, 764-769.
-
(1997)
IEEE Trans. on Power Systems
, vol.12
, Issue.2
, pp. 764-769
-
-
Li, C.-A.1
Hsu, E.2
Svoboda, A.J.3
Tseng, C.-L.4
Johnson, R.B.5
-
11
-
-
0028428070
-
Optimal shortterm scheduling for a large-scale cascaded hydro system
-
M. Piekutowski, T. Litwinowicz, & R.J. Frowd, Optimal shortterm scheduling for a large-scale cascaded hydro system, IEEE Trans. on Power Systems, 9(2), 1994, 805-811.
-
(1994)
IEEE Trans. on Power Systems
, vol.9
, Issue.2
, pp. 805-811
-
-
Piekutowski, M.1
Litwinowicz, T.2
Frowd, R.J.3
-
12
-
-
0036872146
-
Self-scheduling of a hydro producer in a pool-based electricity market
-
A.J. Conejo, J.M. Arroyo, J. Contreras, & F.A. Villamor, Self-scheduling of a hydro producer in a pool-based electricity market, IEEE Trans. on Power Systems, 17(4), 2002, 1265-1272.
-
(2002)
IEEE Trans. on Power Systems
, vol.17
, Issue.4
, pp. 1265-1272
-
-
Conejo, A.J.1
Arroyo, J.M.2
Contreras, J.3
Villamor, F.A.4
-
13
-
-
0035507082
-
Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
-
G.W. Chang, M. Aganagic, J.G. Waight, J. Medina, T. Burton, S. Reeves, & M. Christoforidis, Experiences with mixed integer linear programming based approaches on short-term hydro scheduling, IEEE Trans. on Power Systems, 16(4), 2001, 743-749.
-
(2001)
IEEE Trans. on Power Systems
, vol.16
, Issue.4
, pp. 743-749
-
-
Chang, G.W.1
Aganagic, M.2
Waight, J.G.3
Medina, J.4
Burton, T.5
Reeves, S.6
Christoforidis, M.7
-
14
-
-
74949121078
-
Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain
-
Bologna, Italy
-
J. García-González, E. Parrilla, J. Barquín, J. Alonso, A. Sáiz-Chicharro, & A. González, Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain, Proc. IEEE Power Tech 2003 Conf., Bologna, Italy, 2003.
-
(2003)
Proc. IEEE Power Tech 2003 Conf
-
-
García-González, J.1
Parrilla, E.2
Barquín, J.3
Alonso, J.4
Sáiz-Chicharro, A.5
González, A.6
-
15
-
-
0030084671
-
Mixed-integer programming applied to short-term planning of a hydro-thermal system
-
O. Nilsson & D. Sjelvgren, Mixed-integer programming applied to short-term planning of a hydro-thermal system, IEEE Trans. on Power Systems, 11(1), 1996, 281-286.
-
(1996)
IEEE Trans. on Power Systems
, vol.11
, Issue.1
, pp. 281-286
-
-
Nilsson, O.1
Sjelvgren, D.2
-
16
-
-
0033080313
-
Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
-
X. Guan, A. Svoboda, & C.-A. Li, Scheduling hydro power systems with restricted operating zones and discharge ramping constraints, IEEE Trans. on Power Systems, 14(1), 1999, 126-131.
-
(1999)
IEEE Trans. on Power Systems
, vol.14
, Issue.1
, pp. 126-131
-
-
Guan, X.1
Svoboda, A.2
Li, C.-A.3
-
17
-
-
0032592944
-
Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs
-
E. Ni, X. Guan, & R. Li, Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs, IEEE Trans. on Power Systems, 14(3), 1999, 1127-1132.
-
(1999)
IEEE Trans. on Power Systems
, vol.14
, Issue.3
, pp. 1127-1132
-
-
Ni, E.1
Guan, X.2
Li, R.3
|